ML20054J891

From kanterella
Revision as of 06:23, 14 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amend to Licenses NPF-4 & NPF-7,consisting of Suppl to 820316 Proposed Changes to Tech Specs Re Reorganization in Nuclear Operations Dept
ML20054J891
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 06/24/1982
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20054J892 List:
References
264, NUDOCS 8206300174
Download: ML20054J891 (3)


Text

a VIHOINIA Etecritic Axn Powen Co>trAxy H ICII)IOND, VIHOINIA 20 261 H. II. LE ASO,T RG vwnr...in==r Nrnaam oramations June 24, 1982 Mr. Harold R. Denton, Director Serial No. 264 Office of Nuclear Reactor Regulation N0/JHL: ace Attn: Mr. Robert A. Clark, Chief Docket Nos. 50-338 Operating Reactors Branch No. 3 50-339 Division of Licensing License Nos. NPF-4 U. S. Nuclear Regulatory Commission NPF-7 Washington, D. C. 20555 Gentlemen:

AMENDMENT TO OPERATING LICENSES NPF-4 AND NPF-7 NORTH ANNA POWER STATION UNITS NO. 1 AND NO. 2 SUPPLEMENT TO PROPOSED TECHNICAL SPECIFICATION CHANGE By the letter dated March 16, 1982, we proposed changes to the Technical Specifications for North Anna Power Station, Unit Nos. I and 2 to reflect the recent reorganization in the Nuclear Operations Department. The proposed changes enclosed supplement our above referenced license amendment application.

The enclosed changes reficct the reorganization in the Quality Assurance Department and the addition of Director-Emergency Planning to the Nuclear Operations Department. These changes are to enhance the Quality Assurance program and the Emergency Planning, Preparedness and Response Program of the company. The proposed revisions to the North Anna Unit 1 Appendix A and B Technical Specifications are provided in Attachments 1 and 2, respectively.

The proposed revisions to the North Anna 2 Appendix A and B Technical Specifications are provided in Attachments 3 and 4, respectively.

This request has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff. It has been determined that this request does not involve an unreviewed safety question.

We have reviewed this request in accordance with the criteria in 10 CFR 170.22. Since this request supplements our previous license amendment application referenced above, no additional license amendment fee is required.

Very tjrulp y6urs, 1: i R. H. Leasburg O Ol 8206300174 820624 DR ADOCK 05000338 PDR

Vinoim Etscinic no Powen courm to liarold R. Denton Attachments;

1. Proposed Appendix A Technical Specification Change - Unit 1
2. Proposed Appendix B Technical Specification Change - Unit 1
3. Proposed Appendix A Technical Specification Change - Unit 2
4. Proposed Appendix B Technical Specification Change - Unit 2 cc: Mr. James P. O'Reilly Regional Administrator Region II J

COMMONWEALTH OF VIRGINIA )

)

, CITY OF RICHMOND )

The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by R. H. Leasburg, who is Vice President-Nuclear Operations, of the Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this ,2 /

$ day of Q- , 19 P A .

My Commission expires: o7 >4 , 19 S?[.

i L G . 7h W-Notary Public (SEAL) l _ ___ . _ .. _