ML20042G535

From kanterella
Revision as of 20:50, 12 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Summary of NPDES Noncompliances for First Quarter 1990. W/900508 Ltr
ML20042G535
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/31/1990
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9005150049
Download: ML20042G535 (2)


Text

a_ . ,

l

-- 4 .-  % .

Alabama Power Com, v ny ,

  • . 40 invein:ss C;nter Parkwiy 4 -

- Post Office Dox 1295 Birmingham, Alabama 35201 Telephone 205 808 5581 W. G, Hatroton,111 Senior Vice President Nuclear Operations Alabama Power  :

the southern thetrc system

}

May 8, 1990 L Docket Nos. 50 348 l 50-364  !

U S. Nuclear Regulatory Commission Attention: Document Control DeskJ y ~

l Washington, D.C. 20555 Gentlemen:

Joseph M. Farley- Nuclear Plant ,

Quarterly NPDES Noncomoliance ReDort 1 Enclosed in accordance with Subsection 3.2 of the Joseph M. Farley Nuclear Plant Environmental Protection Plan (Units 1 and 2),4 Appendix B to Facility . -;'

, Operating License Nos. NPF-2 and NPF-8, is a summary of NPDES noncompliances l for the first quarter of 1990 as transmitted to the Alabama Department of Environmental Management'.

If you have any questions, please advise.

l" Respectfully submitted, I i

u).h. T W. G. Hairston, Ill WGH,III/ JAM:db932 Enclosure  ;

cc: Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. F. Maxwell i

9005150049 900331 PDR R ADOCK 05000348 PDC , ggg/

///

w 6

-[

This ta'le o is submitted to fulfill requirements of Part I.8.6 and Part III.0 - -

FARLEY NUCLEAR PLANT ALOO24619 .

Permit Analytical Caese of -

Test Period of Newcomp15ance Discharge Point Parameter Limit Value Noncomp11ance Corrective Measures Date 5egan Ended Once Through Total Residual 0.2 mg/l 0.23 mg/l No specific cause Since investigation re- 2/23/90- 2/23/90 2/23/90 Equipment Cooling Chlorine (average limit .ies discovered . veeled no specific cause . Samples taken prior to (DSN 001) 0.2 ag/1) Investigation of for this value, no and after the referenced the chlorine corrective action could sample indicated TRC dioxide system and be taken. - values of less then 0.1eg/l OTCW-1 flow rates . This period of exceedence revealed.no indi- tes only approximately cation of prot less one hour.' ~

' which would have -

caused the high TRC value.

t

=

-*#*'""**"&--"*N*dh^* ' ' ' '

LM.'T-Wxd It'-MP--- MPT h.VLhi_ TEM'hMMMM-iW:_'W:M-dC_#_MJL'*t-'-_W'Mh** _

''"*T #""'-"

  • +W W# *

. um 5W'_' r#-'Vi it w_ y _-.m..___==___u_,__: -

L._ _- __ _ z_ e- n-