ML19030B037

From kanterella
Revision as of 17:42, 5 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix I.1 - Pages 1-44
ML19030B037
Person / Time
Site: Clinch River
Issue date: 01/18/2019
From: James Shea
Tennessee Valley Authority
To:
Office of New Reactors
Fetter A
References
TVACLINCHRIVERESP, TVACLINCHRIVERESP.SUBMISSION.6, CRN.P.PART08, CRN.P.PART08.2
Download: ML19030B037 (45)


Text

APPENDIX I -Groundwater Level Monitoring Through 2-18-2014- No Change for Rev. 4 1.1 - Manual Water Level Readings 1.2- Listing of Transducer Data Files Clinch River Data Report Rev. 4 CRP-1112.16 ame Page 11 of 1

APPENDIX 1.1 -Manual Water Level Readings- No Change for Rev. 4 1.1.1 Long Term Observation Wells 1.1.2 Other Observation Wells ame Clinch River Data Report Rev. 4 CRP-1112.16 Page 1.1-1 of44

APPENDIX 1.1 -Manual Water Level Readings- No Change for Rev. 4 1.1.1 Long Term Observation Wells ame Clinch River Data Report Rev. 4 CRP-1112.16 Page 1.1-2 of 44

GROUNDWATER LEVEL

SUMMARY

- LONG-TERM OBSERVATION WELL OW-101U CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468-13-1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELL ID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 14:56 803.72 13.01 790.71 10/1/2013 11:40 803.72 19.54 784.18 10/9/2013 11:06 803.72 20.58 783.14 10/26/2013 13:59 803.72 20.99 782.73 11/5/2013 14:57 803.72 21.03 782.69 11/12/2013 11:35 803.72 20.88 782.84 OW-101U 11/23/2013 12:49 803.72 19.77 783.95 12/9/2013 9:09 803.72 5.30 798.42 12/20/2013 13:11 803.72 13.G7 790.65 1/13/2014 8:45 803.72 7.98 795.74 1/16/2014 13:.55 803.72 8.34 795.38 2/18/2014 8:34 803.72 11.86 791.86 Notes:

1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date: ~ *3 / 1 (I+--

Checked by/Date: fl~.4 :3/ ~ / <(

1 WatetiJiflc~IV\t!P'b'ilt~~~E(M~lhP. 4 CRP-1112.16 Page 1.1-3 of 44

GROUNDWATER LEVEL

SUMMARY

  • LONG-TERM OBSERVATION WELL OW-101L CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468*13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELL ID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 14:55 803.48 35.15 768.33 10/1/2013 11:45 803.48 37.11 766.37 10/9/2013 11:04 803.48 41.58 761.90 10/26/2013 13:56 803.48 46.59 756.89 11/5/2013 15:00 803.48 50.00 753.48 OW-101L 11/12/2013 11:36 803.48 53.88 749.60 11/23/2013 12:47 803.48 41.43 762.05 12/9/2013 8:50 803.48 30.01 773.47 12/20/2013 13:13 803.48 34.74 768.74 1/13/2014 8:47 803.48 31.96 771.52 1/16/2014 14:00 803.48 32.37 771.11 2/18/2014 8:42 803.48 34.78 768.70 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Water<Sn'ffl!Jif1Ril1\l!tn~ii<fi~lf<Re\Vl. 4 CRP-1112.16 Page 1.1-4 of 44

GROUNDWATER LEVEL

SUMMARY

  • LONG-TERM OBSERVATION WELL OW-1010 CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468*13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELLID ELEVATION (ft) DEPTH {ft) ELEVATION (ft) 9/24/2013 14:53 803.57 60.12 743.45 10/1/2013 11:50 803.57 60.54 743.03 10/9/2013 11:02 803.57 61.80 741.77 10/26/2013 13:54 803.57 62.24 741.33 11/5/2013 15:03 803.57 63.05 740.52 OW-1010 11/12/2013 11:37 803.57 63.68 739.89 11/23/2013 12:45 803.57 64.32 739.25 12/9/2013 8:58 803.57 54.18 749.39 12/20/2013 13:16 803.57 62.52 741.05 1/13/2014 8:50 803.57 58.42 745.15 1/16/2014 14:05 803.57 59.08 744.49 2/18/2014 8:48 803.57 62.07 741.50 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date:

Checked by/Date:

WatetiJrt;~WR~il'IJm:iilftle~~~V! 4 CRP-1112.16 Page 1.1-5 of 44

GROUNDWATER LEVEL

SUMMARY

  • LONG-TERM OBSERVATION WELL OW-202U CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468*13-1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELL ID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 15:15 815.38 16.73 798.65 10/1/2013 8:17 815.38 19.07 796.31 10/9/2013 11:23 815.38 22.49 792.89 10/26/2013 14:15 815.38 26.87 788.51 11/5/2013 13:08 815.38 28.06 787.32 OW-202U 11/12/2013 12:04 815.38 28.63 786.75 11/23/2013 11:34 815.38 17.95 797.43 12/9/2013 15:08 815.38 15.23 800.15 12/20/2013 10:41 815.38 17.28 798.10 1/13/2014 9:26 815.38 15.91 799.47 1/16/2014 11:06 815.38 16.42 798.96 2/18/2014 11:32 815.38 16.54 798.84 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date:

~* b)t;:IL

/Vi. I Checked by/Date: P64 '"S I "'I r I

WatedfiWc~P~,ftl~mJt~E!J.> 4 CRP-1112.16 Page 1.1-6 of 44

GROUNDWATER LEVEL

SUMMARY

- LONG-TERM OBSERVATION WELL OW-202L CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468-13-1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELL ID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 15:17 815.05 48.13 766.92 10/2/2013. 7:55 815.05 48.88 766.17 Transducer in well. Rising head test still running on 10/1.

10/9/2013 11:21 815.05 49.69 765.36 10/26/2013 14:11 815.05 52.19 762.86 11/5/2013 13:06 815.05 53.29 761.76 OW-202L 11/12/2013 12:02 815.05 53.93 761.12 11/23/2013 11:32 815.05 109.27 705.78 Well still recovering after water quality sampling.

12/9/2013 15:13 815.05 36.78 778.27 12/20/2013 10:38 815.05 41.47 773.58 1/13/2014 9:25 815.05 38.26 776.79 1/16/2014 11:00 815.05 38.97 776.08 2/18/2014 11:36 815.05 42.20 772.85 Notes:

1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date:

. t).J- ~*~ lj.t..

Checked by/Date: <GA- 'J 1'~/t'f Watet'tfll'c~ipb~~ffi!&l>n11~1¥v?4 CRP-1112.16 Page 1.1-7 of 44

GROUNDWATER LEVEL

SUMMARY

  • LONG*TERM OBSERVATION WELL OW*202D CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468*13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELL ID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 15:19 815.00 55.66 759.34 10/1/2013 8:21 815.00 56.04 758.96 10/9/2013 11:18 815.00 57.50 757.50 10/26/2013 14:10 815.00 59.33 755.67 11/5/2013 13:05 815.00 60.15 754.85 OW-202D 11/12/2013 12:00 815.00 60.72 754.28 11/23/2013 11:30 815.00 59.95 755.05 12/9/2013 16:20 815.00 51.36 763.64 12/20/2013 10:34 815.00 52.59 762.41 1/13/2014 9:24 815.00 50.96 764.04 1/16/2014 10:52 815.00 50.24 764.76 2/18/2014 11:41 815.00 53.03 761.97 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

WatedJII'I'I:tfR~plf}MftlFffiljM\~J.l 4 CRP-1112.16 Page 1.1-8 of 44

GROUNDWATER LEVEL

SUMMARY

  • LONG-TERM OBSERVATION WELL OW*409U CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468*13-1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELLID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 15:04 809.70 64.98 744.72 10/1/2013 8:40 809.70 66.86 742.84 10/9/2013 11:12 809.70 68.39 741.31 10/26/2013 14:04 809.70 68.86 740.84 11/5/2013 12:58 809.70 68.91 740.79 OW-409U 11/12/2013 11:53 809.70 69.93 739.77 11/23/2013 11:27 809.70 70.60 739.10 12/9/2013 15:02 809.70 47.14 762.56 12/20/2013 11:20 809.70 67.71 741.99 1/13/2014 9:17 809.70 53.66 756.04 1/16/2014 10:12 809.70 56.35 753.35 2/18/2014 11:50 809.70 66.07 743.63 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date:

/}t)J :?/ I til-Checked by/Date: ~ l/ ~/"1 WatetiJm~tl=Ri-Wiil'D~Uilflmjm¥t~ehP. 4 CRP-1112.16 Page 1.1-9 of 44

GROUNDWATER LEVEL

SUMMARY

  • LONG*TERM OBSERVATION WELL OW-409L CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468-13-1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELL ID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 15:06 809.51 37.60 771.91 10/1/2013 8:43 809.51 39.04 770.47 10/9/2013 11:14 809.51 45.06 764.45 10/26/2013 14:05 809.51 49.11 760.40 11/5/2013 12:56 809.51 50.49 759.02 OW-409L 11/12/2013 11:56 809.51 61.30 758.21 11/23/2013 11:25 809.51 41.25 768.26 12/9/2013 14:56 809.51 30.29 779.22 12/20/2013 10:19 809.51 36.45 773.06 1/13/2014 9:18 809.51 32.38 777.13 1/16/2014 10:34 809.51 33.08 776.43 2/18/2014 11:55 809.51 35.44 774.07 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date:

fo;;_ ??f/14-Checked by/Date: /l.t;, A , I "/ 1 'I WatedJm~~~~ilUM!flNI!~FRf!ll) 4 CRP-1112.16 Page 1.1-10 of44

GROUNDWATER LEVEL

SUMMARY

- LONG-TERM OBSERVATION WELL OW-417U CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468-13-1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELL ID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 11:05 775.03 28.06 746.97 10/1/2013 9:12 775.03 28.26 746.77 10/9/2013 9:41 775.03 28.62 746.41 10/26/2013 13:15 775.03 29.10 745.93 11/5/2013 14:14 775.03 29.45 745.58 OW-417U 11/12/2013 11:03 775.03 29.94 745.09 11/23/2013 12:05 775.03 30.73 744.30 12/9/2013 10:55 775.03 26.88 748.15 12/20/2013 12:37 775.03 27.64 747.39 1/13/2014 11:17 775.03 25.85 749.18 1/16/2014 13:13 775.03 25.61 749.42 2/18/2014 9:34 775.03 27.32 747.71 Notes:

1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date:

Checked by/Date:

WatetiJmcJtf~l'IW!~ttJiltir~~t#t~EiJ.l4 CRP-1112.16 Page 1.1-11 of44

  • GROUNDWATER LEVEL

SUMMARY

  • LONG-TERM OBSERVATION WELL OW-417L CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468-13-1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELLID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 11:02 775.71 25.30 750.41 10/1/2013 9:16 775.71 25.54 750.17 10/9/2013 9:43 775.71 25.82 749.89 10/26/2013 13:22 775.71 26.56 749.15 11/5/2013 14:16 775.71 26.97 748.74 OW-417L 11/12/2013 11:05 775.71 27.27 748.44 11/23/2013 12:07 775.71 27.94 747.77 12/9/2013 10:58 775.71 27.10 748.61 12/20/2013 12:31 775.71 25.60 750.11 1/13/2014 11:18 775.71 23.43 752.28 1/16/2014 13:19 775.71 23.18 752.53 2/18/2014 9:40 775.71 23.84 751.87 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date:

Checked by/Date:

Watectm~~fi!>~W~oTtiF&v~4 CRP-1112.16 Page 1.1-12 of44

GROUNDWATER LEVEL

SUMMARY

- LONG-TERM OBSERVATION WELL OW-423U CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468-13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELLID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 15:31 800.21 38.78 761.43 10/1/2013 9:02 800.21 39.75 760.46 10/9/2013 11:35 800.21 39.85 760.36 10/26/2013 8:33 800.21 41.72 758.49 11/5/2013 13:21 800.21 42.28 757.93 OW-423U 11/12/2013 10:07 800.21 42.92 757.29 11/23/2013 11:16 800.21 41.53 758.68 12/9/2013 14:13 800.21 34.61 765.60 12/20/2013 11:20 800.21 39.29 760.92 1/13/2014 11:41 800.21 37.93 762.28 1/16/2014 1.1:51 800.21 38.21 762.00 2/18/2014 14:08 800.21 38.70 761.51 Notes:

1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Q{)_y_;p_d)_(,_,--,-/._;_tf--,-

Prepared by/Date: --/;1-Checked by/Date: §4 :i! / "P /tc.f Wat~liMIII~~Dini"ER~Ilt ~.04 CRP-1112.16 Page 1.1-13 of44

GROUNDWATER LEVEL

SUMMARY

  • LONG-TERM OBSERVATION WELL OW-423L CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468-13-1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELLID ELEVATION (ft) DEPTH (ft) ELEVATION(ft) 9/24/2013 15:30 801.13 29.53 771.60 10/1/2013 8:59 801.13 31.48 769.65 10/9/2013 11:34 SOL 13 35.24 765.89 10/26/2013 8:32 801.13 37.41 763.72 11/5/2013 13:24 801.13 38.28 762.85 OW-423L 11/12/2013 10:14 801.13 39.00 762.13 11/23/2013 11:14 801.13 37.77 763.36 12/9/2013 14:17 801.13 20.84 780.29 12/20/2013 11:15 . 801.13 26.89 774.24 1/13/2014 11:42 801.13 24.48 776.65 1/16/2014 11:57 801.13 23.97 777.16 2/18/2014 14:12 801.13 25.90 775.23 Notes: -
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum Is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date:

<7&--J- ~/t /;tJ-

____,/,..--c',-----::,.._.-

Checked by/Date: @A- ~ / '5/ 1 Cf WatedfiWc~iPb~Wflffi~'Q11~EiJ.l4 CRP-1112. 16 Page 1.1-14 of 44

GROUNDWATER LEVEL

SUMMARY

  • LONG-TERM OBSERVATION WELL OW*423D CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468*13-1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELL ID ELEVATION (ft) DEPTH (ft) ELEVATION {ft) 9/24/2013 15:28 802.86 27.34 775.52 10/1/2013 8:57 802.86 27.09 775.77 10/9/2013 11:32 802.86 27.98 774.88 10/26/2013 8:30 802.86 30.80 772.06 11/5/2013 13:26 802.86 31.67 771.19 OW-423D 11/12/2013 10:18 802.86 32.05 770.81 11/23/2013 11:12 802.86 30.16 772.70 12/9/2013 14:25 802.86 20.58 782.28 12/20/2013 11:10 802.86 20.44 782.42 1/13/2014 11:44 802.86 17.95 784.91 1/16/2014 12:03 802.86 16.50 786.36 2/18/2014 14:15 802.86 20.46 782.40 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88

}tl~ ~;, /1 (}_

3. See Appendix E.1 for well construction details.

Prepared by/Date:

Checked by/Date: ~4- 7/1/ 1r Waternm~H=RIW!i'rrna~ftle~~e!'-'! 4 CRP-1112.16 Page 1.1-15 of44

APPENDIX 1.1 -Manual Water Level Readings- No Change for Rev. 4 1.1.2 Other Observation Wells ame Clinch River Data Report Rev. 4 CRP-1112.16 Page 1.1-16 of44

GROUNDWATER LEVEL

SUMMARY

  • PUMPING TEST OBSERVATION WELL PT*PW CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468*13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELL ID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 11/5/2013 13:33 804.03 64.32 739.71 11/12/2013 NM 804.03 NM NM Well is secured with drill rig. Not accessible at this time.

11/23/2013 11:22 804.03 66.73 737.30 PT*PW 12/9/2013 14:44 804.03 62.67 741.36 12/20/2013 11:05 804.03 65.62 738.41 1/13/2014 11:50 804.03 64.64 739.39 1/16/2014 12:20 804.03 65.02 739.01 2/18/2014 14:27 804.03 66.28 737.75 Notes:

1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction .details.

~b//;4-Prepared by/Date: _,/"=v-=-**---=---,---r Checked by/Date: @,... ~ / "f,/

1

'/

WatetiJm~lfRJWiJlrtilftirftleJmtlt~E!.J! 4 CRP-1112.16 Page 1.1-17 of 44

GROUNDWATER LEVEL

SUMMARY

  • PUMPING TEST OBSERVATION WELL PT-OW-U1 CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468*13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELLID ELEVATION (ft) DEPTH (ft) ELEVATION {ft) 11/5/2013 13:18 801.52 60.41 741.11 11/12/2013 10:02 801.52 61.44 740.08 11/23/2013 11:07 801.52 63.14 738.38 PT*OW-U1 12/9/2013 14:10 801.52 50.78 750.74 12/20/2013 11:51 801.52 60.92 740.6 1/13/2014 11:40 801.52 58.36 743.16 1/16/2014 11:43 801.52 58.36 743.16 2/18/2014 14:04 801.52 59.42 742.1 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum Is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date:

Checked by/Date:

Watecmvt:h~f>~ffi3~Mt~v94 CRP-1112.16 Page 1.1-18 of44

GROUNDWATER LEVEL

SUMMARY

- PUMPING TEST OBSERVATION WELL PT-OW-L 1 CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468-13-1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELL ID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 11/5/2013 13:17 803.13 42.50 760.63 11/12/2013 10:04 803.13 43.42 759.71 11/23/2013 11:09 803.13 41.87 761.26 PT-OW-L1 12/9/2013 14:04 803.13 17.46 785.67 12/20/2013 11:53 803.13 29.06 774.07 1/13/2014 11:37 803.13 22.95 780.18 1/16/2014 11:37 803.13 23.35 779.78 2/18/2014 14:00 803.13 28.54 774.59 Notes:

1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

OAJ oJ; let-Prepared by/Date: --;;/..--::::v;----:-----:~--.

Checked by/Date: {UA- ~ / 1>/1 </

WatedJiWI!tFR~flOOfifl~'ffi\fR>t¥v9 4 CRP-1112.16 Page 1.1-19 of44

GROUNDWATER LEVEL

SUMMARY

  • PUMPING TEST OBSERVATION WELL PT-OW-U2 CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468*13-1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELLID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 11/5/2013 13:14 805.31 60.34 744.97 11/12/2013 9:58 805.31 61.36 743.95 11/23/2013 11:04 805.31 62.53 742.78 PT-OW-U2 12/9/2013 14:00 805.31 54.91 750.40 12/20/2013 11:58 805.31 54.82 750.49 1/13/2014 11:33 805.31 52.22 753.09 1/16/2014 11:22 805.31 52.07 753.24 2/18/2014 13:56 805.31 53.34 751.97 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Watecii1Wt!~fl~ff~ffi\lftle'v94 CRP-1112.16 Page 1.1-20 of 44

GROUNDWATER LEVEL

SUMMARY

  • PUMPING TEST OBSERVATION WELL PT*OW*L2 CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE, AMEC PROJECT NO. 6468*13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELL ID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 11/5/2013 13:13 804.32 42.88 761.44

' 804.32 760.72 11/12/2013 9:55 43.60 11/23/2013 11:03 804.32 42.47 761.85 PT*OW*L2 12/9/2013 13:54 804.32 12.83 791.49 12/20/2013 12:04 804.32 .28.19 776.13 1/13/2014 11:32 804.32 20.57 783.75 1/16/2014 11:30 804,32 21.47 782.85 2/18/2014 13:52 804.32 27.88 776.44 Notes:

1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prnporn< by/D,.;

Checked by/Date:

!;/ ~ /7 'I 3

~ '3 "Z 1 Wateouweti=R~PmlflflMj>mlt:IRE!v9 4 CRP-1112. 16 Page 1.1-21 of44

GROUNDWATER LEVEL

SUMMARY

  • PUMPING TEST OBSERVATION WELL PT-OW-U3 CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468-13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELL ID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 11/5/2013 13:28 801.65 39.40 762.25 11/12/2013 10:22 801.65 39.96 761.69 11/23/2013 11:18 801.65 39.22 762.43 PT*OW-U3 12/9/2013 14:38 801.65 25.90 775.75 12/20/2013 11:25 801.65 28.43 773.22 1/13/2014 11:46 801.65 25.77 775.88 1/16/2014 12:08 801.65 25.75 775.90 2/18/2014 14:22 801.65 28.77 772.88 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date:

Checked by/Date:

Watec!JJWI!~f'l!>~fifl~M\FR\¥v94 CRP-1112.16 Page 1.1-22 of 44

GROUNDWATER LEVEL

SUMMARY

  • PUMPING TEST OBSERVATION WELL PT-OW-L3 CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468-13-1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELL ID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 11/5/2013 13:30 803.12 59.20 743.92 11/12/2013 10:24 803.12 59.32 743.80 11/23/2013 11:19 803.12 59.82 743.30 PT-OW-L3 12/9/2013 14:34 803.12 58.04 745.08 12/20/2013 11:29 803.12 58.78 744.34 1/13/2014 11:47 803.12 57.76 745.36 1/16/2014 12:14 803.12 57.74 745.38 2/18/2014 14:18 803.12 58.16 744.96 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date: --,~;;---:---._-

Checked by/Date:_.___:::--- -"'----'-+

Wat£Wueh!RiwioiDiita~n R&v.04 CRP-1112.16 Page 1.1-23 of 44

GROUNDWATER LEVEL

SUMMARY

  • OBSERVATION WELL OW*401U CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468*13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELLID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 15:49 82D.48 9.52 810.96 10/1/2013 9:24 820.48 9.96 810.52 10/9/2013 9:20 820.48 10.29 810.19 10/26/2013 12:55 820.48 10.54 809.94 11/5/2013 13:44 820.48 10.66 809.82 OW*401U 11/12/2013 10:41 820.48 10.70 809.78 11/23/2013 11:47 820,48 10.85 809.63 12/9/2013 11:53 820.48 7.34 813.14 12/20/2013 12:13 820.48 9.85 810.63 1/13/2014 10:58 820.48 8.88 811.60 2/18/2014 9:54 820.48 9.62 810.86 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date:

Checked by/Date:

. Watet'tfWc~lpr~ur~'Oo/t~i¥J.l4 CRP-1112.16 Page 1.1-24 of 44

GROUNDWATER LEVEL

SUMMARY

  • OBSERVATION WELL OW*401L CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468*13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELLID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 15:45 820.57 37.08 783.49 10/1/2013 9:20 820.57 38.86 781.71 10/9/2013 9:18 820.57 40.14 780.43 10/26/2013 12:53 820.57 41.90 778.67 11/5/2013 13:41 820.57 42.41 778.16 OW-401L 11/12/2013 10:40 820.57 42.37 778.20 11/23/2013 11:44 820.57 39.96 780.61 12/9/2013 11:56 820.57 28.82 791.75 12/20/2013 12:12 820.57 33.28 787.29 1/13/2014 10:57 820.57 25.02 795.55 2/18/2014 9:52 820.57 31.88 788.69 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date:

Checked by/Date:

Watecttme~fl~fff~oEf\lj!&'v94 CRP-1112.16 Page 1.1-25 of 44

GROUNDWATER LEVEL

SUMMARY

  • OBSERVATION WELL OW-401D CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468-13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELLID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 9:20 821.28 39.61 781.67 10/1/2013 9:28 821.28 38.58 782.70 10/9/2013 9:22 821.28 40.31 780.97 10/26/2013 12:57 821.28 43.95 777.33 11/5/2013 13:46 821.28 48.40 772.88 OW-401D 11/12/2013 10:42 821.28 44.19 777.09 11/23/2013 11:49 821.28 40.79 780.49 12/9/2013 12:01 821.28 34.41 786.87 12/20/2013 12:14 821.28 40.05 781.23 1/13/2014 10:58 821.28 26.95 794,33 2/18/2014 9:56 821.28 29.84 791.44 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

watedfmctm~P'Wrae~ol1~1¥J.l4 cRP-1112.16 Page 1.1-26 of 44

GROUNDWATER LEVEL

SUMMARY

  • OBSERVATION WELL OW-415U CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468-13-1072 OBS~RVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELLID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 14:33 787.22 28.42 758.80 10/1/2013 11:26 787.22 29.41 757.81 10/9/2013 10:55 787.22 31,13 756.09 10/26/2013 13:45 787.22 32.01 755.21 11/5/2013 14:50 787.22 32.33 754.89 OW-415U 11/12/2013 11:28 787.22 32.44 754.78 11/23/2013 12:37 787.22 30.84 756.38 12/9/2013 9:20 787.22 15.20 772.02 12/20/2013 12:58 787.22 22.82 764.40 1/13/2014 8:37 787.22 20.00 767.22 2/18/2014 9:04 787.22 24.00 763.22 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88

-&4':..1 °Jr /I (-..

3. See Appendix E.1 for well construction details.

Prepared by/Date:

Checked by/Date: tf 4- "3/1 / 1 '/

Watedtmch91ti'<il!ifl~~fae~Ol\fk't¥v~ 4 CRP-1112.16 Page 1.1-27 of 44

GROUNDWATER LEVEL

SUMMARY

  • OBSERVATION WELL OW-415L CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468-13-1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELL ID ELEVATION {ft) DEPTH {ft) ELEVATION {ft) 9/24/2013 14:36 786.75 22.92 763.83 10/1/2013 11:30 786.75 21.73 765.02 10/9/2013 10:58 786.75 21.29 765.46 10/26/2013 13:49 786.75 21.35 765.40 11/5/2013 14:53 786.75 21.49 765.26 OW-415L 11/12/2013 11:30 786.75 21.56 765.19 11/23/2013 12:39 786.75 20.62 766.13 12/9/2013 9:23 786.75 14.84 771.91 12/20/2013 12:59 786.75 15.88 770.87 1/13/2014 NA 786.75 NM NM Not Measured. TVA sampling well. Pump stuck in well.

2/18/2014 9:02 787.75 18.07 769.68 Notes:

1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date:

Checked by/Date:

WaterCfjW(!IfRY~~<rro"Ma~~~¥!-IR 4 CRP-1112.16 Page 1.1-28 of 44

GROUNDWATER LEVEL

SUMMARY

  • OBSERVATION WELL OW-416U CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468-13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELL ID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 14:28 812.82 71.38 741.44 10/1/2013 11:12 812.82 71.78 741.04 10/9/2013 10:28 812.82 72.76 740.06 10/26/2013 13:41, 812.82 72.93 739.89 11/5/2013 14:45 812.82 73.08 739.74 OW-416U 11/12/2013 11:22 812.82 73.97 738.85 11/23/2013 12:34 812.82 75.60 737.22 12/9/2013 9:31 812.82 66.89 745.93 12/20/2013 12:56 812.82 74.32 738.50 1113/2014 8:36 812.82 70.20 742.62 2/18/2014 9:05 812.82 73.58 739.24 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.
'!;,It/;¢..

Checked by/Date: ~ ~ 3/ '??/ 1 Prepared by/Date: --~.---:--=-::-=-

1 wateouw~:tffl~P~Ifpffilj)011mv?4 CRP-1112.16 Page 1.1-29 of 44

GROUNDWATER LEVEL

SUMMARY

  • OBSERVATION WELL OW*416L CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468*13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELL ID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 14:22 812.73 71.25 741.48 10/1/2013 11:16 812.73 71.65 741.08 10/9/2013 10:26 812.73 72.60 740.13 10/26/2013 13:38 812.73 72.81 739.92 11/5/2013 14:43 812.73 72.94 739.79 OW*416L 11/12/2013 11:20 812.73 73.83 738.90 11/23/2013 12:32 812.73 75.44 737.29 12/9/2013 9:35 812.73 67.17 745.56 12/20/2013 12:55 812.73 74.17 738.56 1/13/2014 8:35 812.73 70.13 742.60 2/18/2014 9:07 812.73 73.43 739.30 Notes:
1. Depths referenc~d to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date:

Checked by/Date:

WatecJmy~h~if>I!>§Fae~ol11Jl&¥v?4 CRP-1112.16 Page 1.1-30 of 44

GROUNDWATER LEVEL

SUMMARY

  • OBSERVATION WELL OW-418U CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468-13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELL ID ELEVATION (ft) DEPTH (ft) ELEVATION {ft) 9/24/2013 13:54 812.94 61.98 750.96 10/1/2013 11:03 812.94 61.92 751.02 10/9/2013 9:54 812.94 62.33 750.61 10/26/2013 13:24 812.94 63.56 749.38 11/5/2013 14:23 812.94 64.41 748.53 OW-418U 11/12/2013 11:16 812.94 65.11 747.83 11/23/2013 12:21 812.94 65.77 747.17 12/9/2013 9:46 812.94 51.54 761.40 12/20/2013 12:50 812.94 58.35 754.59 1/13/2014 8:29 812.94 55.80 757.14 2/18/2014 9:12 812.94 57.58 755.36 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

17~ ~~.1 ;; J.

Prepared by/Date: !!..(}L\ ' / -

Checked by/Date: {lM- ~~~/ 1' /

Watectlil'~~fl~Wf~M\Fffi¥v94 CRP-1112.16 Page 1.1-31 of44

GROUNDWATER LEVEL

SUMMARY

  • OBSERVATION WELL OW*418L CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468*13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELLID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 13:55 814.41 66.20 748.21 10/1/2013 10:58 814.41 67.53 746.88 10/9/2013 9:50 814.41 68.64 745.77 10/26/2013 13:25 814.41 69.45 744.96 11/5/2013 14:25 814.41 70.10 744.31 OW"418L 11/12/2013 11:18 814.41 70.87 743.54 11/23/2013 12:23 814.41 71.43 742.98 12/9/2013 9:41 814.41 63.85 750.56 12/20/2013 12:53 814.41 62.34 752.07 1/13/2014 8:30 814.41 61.38 753.03 2/18/2014 9:10 814.41 62.98 751.43 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date:--#-.,.--------,

Checked by/Date: ---"--""...!.:L~~~,_

WatedJiWI!tFRIV\¥ili01RWR\!~m\~J.l 4 CRP-1112.16 Page 1.1-32 of 44

GROUNDWATER LEVEL

SUMMARY

  • OBSERVATION WELL OW-419U CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468*13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELLID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 13:33 803.13 45.73 757.40 10/1/2013 9:02 803.13 49.94 753.19 10/9/2013 9:37 803.13 53.55 749.58 10/26/2013 13:09 803.13 54.51 748.62 11/5/2013 14:04 803.13 54.72 748.41 OW*419U 11/12/2013 10:52 803.13 54.82 748.31 11/23/2013 12:01 803.13 51.97 751.16 12/9/2013 11:34 803.13 35.43 767.70 12/20/2013 9:18 803.13 43.37 759.76 1/13/2014 11:03 803.13 39.42 763.71 2/18/2014 9:23 803.13 44.35 758.78 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date:

Checked by/Date:

Watetitm~'ti=RIWillrrFcRW~j>mltfRI!J.l 4 CRP-1112.16 Page 1.1-33 of 44

GROUNDWATER LEVEL

SUMMARY

  • OBSERVATION WELL OW-419L CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECTNO. 6468*13-1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELLID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 13:32 802.72 46.32 756.40 10/1/2013 9:07 802.72 49.83 752.89 10/9/2013 9:35 802.72 53.04 749.68 10/26/2013 13:11 802.72 54.00 748.72 11/5/2013 14:06 802.72 54.20 748.52 OW-419L 11/12/2013 10:58 802.72 54.27 748.45 11/23/2013 11:59 802.72 51.65 751.07 12/9/2013 11:30 802.72 39.15 763.57 12/20/2013 9:20 802.72 43.95 758.77 1/13/2014 11:04 802.72 40.86 761.86 2/18/2014 9:25 802.72 44.72 758.00 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date:

Checked by/Date:

Water<!;n~fi1Ri~D>af§cR~If'Rel9. 4 CRP-1112.16 Page 1.1-34 of 44

GROUNDWATER LEVEL

SUMMARY

- OBSERVATION WELL OW-420U CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468-13-1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELLID ELEVATION (ft) DEPTH (ft) ELEVATION {ft) 9/24/2013 13:43 805.70 46.83 758.87 10/1/2013 9:56 805.70 47.71 757.99 10/9/2013 9:29 805.70 48.66 757.04 10/26/2013 13:04 805.70 DRY NM 49.35 Termination Depth. Brown sediment on probe.

11/5/2013 13:54 805.70 DRY NM 49.33 Termination Depth. Brown sediment on probe.

OW-420U 11/12/2013 10:50 805.70 DRY NM 49.35 Termination Depth. Tagged total depth.

11/23/2013 11:53 805.70 47.09 758.61 12/9/2013 11:38 805.70 45.12 760.58 12/20/2013 12:19 805.70 46.82 758.88 1/13/2014 11:01 805.70 46.66 759.04 2/18/2014 9:49 805.70 46.57 759.13 Notes:

1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.
4. NM = Not Measured. Prepared by/Date: f}()_:-'J_'--::,_:-~~--:-/-/t_/tl

--#r Checked by/Date: &If 1l/ $/1 </

Watel{}fii'l'f!tfRYvl¥r'l:JiitrafRii!~IW14 CRP-1112.16 Page 1.1-35 of 44

GROUNDWATER LEVEL

SUMMARY

  • OBSERVATION WELL OW*420L CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468*13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELLID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 13:45 806.15 64.02 742.13 10/1/2013 9:47 806.15 64.77 741.38 10/9/2013 9:27 806.15 65.18 740.97 10/26/2013 13:02 806.15 65.14 741.01 11/5/2013 13:56 806.15 65.49 740.66 OW-420L 11/12/2013 10:51 806.15 66.10 740.05 11/23/2013 11:55 806.15 69.56 736.59 12/9/2013 11:43 806.15 61.18 744.97 12/20/2013 12:17 806.15 66.16 739.99

.~

1/13/2014 11:00 806.15 60.72 745.43 2/18/2014 9:47 806.15 64.38 741.77 Notes:

1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD.88
3. See Appendix E.1 for well construction details.

Prepared by/Date: -h'c....------:-----,.-

Checked by/Date: -=---~'---"'+--<-

WateOin'eltRMi~IDlih!S~Mt IRMIP4 CRP-1112.16 Page 1.1-36 of 44

GROUNDWATER LEVEL

SUMMARY

  • OBSERVATION WELL OW-421U CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468-13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELLID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 14:09 808.27 55.04 753.23 10/1/2013 10:43 808.27 53.91 754.36 10/9/2013 10:01 808.27 53.79 754.48 10/26/2013 13:30 808.27 54.15 754.12 11/5/2013 14:35 808.27 54.13 754.14 OW-421U 11/12/2013 11:14 808.27 54.09 754.18 11/23/2013 12:30 808.27 54.12 754.15 12/9/2013 11:13 808.27 54.04 754.23 12/20/2013 12:46 808.27 53.82 754.45 1/13/2014 8:19 808.27 53.72 754.55 2/18/2014 9:15 808.27 53.82 754.45 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum Is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date:

Checked by/Date:

Watedlft'l'~tFRtWfl~MJ~Ilffl:IR\¥v94 CRP-1112.16 Page 1.1-37 of 44

GROUNDWATER LEVEL

SUMMARY

  • OBSERVATION WELL OW*421L CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468*13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELLID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 14:02 807,81 98.54 709.27 10/1/2013 10:38 807.81 70.61 737.20 10/8/2013 9:05 807.81 61.15 746.66 Water level obtained between slug tests.

10/26/2013 13:31 807.81 59.89 747.92 11/5/2013 14:33 807.81 59.77 748.04 OW*421L 11/12/2013 11:13 807.81 59.91 747.90 11/23/2013 12:28 807.81 119.47 688.34 Well still recovering after water quality samplln>J.

12/9/2013 11:17 807.81 63.13 744.68 12/20/2013 12:45 807.81 58.36 749.45 1/13/2014 8:18 807.81 57.38 750.43 2/18/2014 9:17 807.81 57.55 750.26 Notes:

1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prep a red by/Date: --H---:--:::;;-.-:-------,

Checked by/Date: ~-----"':::....!.-::c.t--___:__,t-WatedJIW~tfRlWf>~f§'~m\fRI¥v94 CRP-1112.16 Page 1.1-38 of 44

GROUNDWATER LEVEL

SUMMARY

- OBSERVATION WELL OW-421D CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468-13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELL ID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 9/24/2013 14:11 805.20 176.16 629.04 10/1/2013 10:23 805.20 135.66 669.54 10/8/2013 9:06 805.20 102.07 703.13 Water level obtained between slug tests.

10/26/2013 13:33 805.20 72.01 733.19 11/5/2013 14:31 805.20 65.50 739.70 OW-421D 11/12/2013 11:11 805.20 63.29 741.91 11/23/2013 12:26 805.20 61.80 743.40 12/9/2013 11:22 805.20 61.18 744.02 12/20/2013 12:44 805.20 60.00 745.20 1/13/2014 8:20 805.20 86.04 719.16 Water /eve/lowered due to TVA sampling 2/18/2014 9:19 805.20 60.50 744.70 Notes:

1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date:

/Y>JL 44/tt~-

?;P'I"' .

~* ,...,-(d ~ "'.!/ G Checked by/Date: -"-'--'"'"-'--":!fl.L.L.v_,v"D--'-'r Water(!;fi'ffll:fiiPM~i§Mil~rf'~jf. 4 CRP-1112.16 Page 1.1-39 of 44

GROUNDWATER LEVEL

SUMMARY

  • OBSERVATION WELL OW-428U CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468-13-1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELLID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 11/5/2013 15:10 807.78 42.51 765.27 11/12/2013 12:16 807.78 42.84 764.94 11/23/2013 7:54 807.78 34.65 773.13 OW-428U 12/9/2013 13:36 807.78 17.51 790.27 12/20/2013 9:55 807.78 22.35 785.43 1/13/2014 9:10 807.78 16.34 791.44 2/18/2014 12:09 807.78 19.35 788.43 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date: Jf*.} o)., lttJ.-

Checked by/Date: /Z.Jhf- ~ / ~~ 1 'I Waterdfiffl!lfRY~~'rro"Jfa:Re~I?\P. 4 CRP-1112.16 Page 1.1-40 of 44

GROUNDWATER LEVEL

SUMMARY

  • OBSERVATION WELL OW-428L CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468*13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELL ID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 11/12/2013 12:13 807.06 48.23 758.83 11/23/2013 7:52 807.06 24.85 782.21 OW-428L 12/9/2013 13:39 807.06 19.85 787.21 12/20/2013 9:56 807.06 28.64 778.42 1/13/2014 9:11 807.06 17.60 789.46 2/18/2014 12:07 807.06 16.92 790.14 Notes:
1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date:

Checked by/Date:

Waternm~tf'R~P'D1iUilR\!IWftltfRe!~ 4 CRP-1112.16 Page 1.1-41 of44

GROUNDWATER LEVEL

SUMMARY

- OBSERVATION WELL OW-428D CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468-13-1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELL ID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 11/12/2013 12:10 807.03 177.22 629.81 Well drawn down during development.

11/23/2013 7:50 807.03 45.50 761.53 Well recoverinQ from development.

12/9/2013 13:44 807.03 11.05 795.98 12/11/2013 8:48 807.03 9.53 797.50 12/11/2013 9:23 807.03 9.65 797.38 Transducer dejlth reset.

12/12/2013 14:35 807.03 8.97 798.06 OW-428D 12/13/2013 9:15 807.03 8.73 798.30 12/17/2013 NM 807.03 NM NM TVA sampling well.

12/18/2013 9:11 807.03 32.82 774.21 Transducer reinstalled after TVA samplinQ. Well recoverinq.

12/20/2013 13:23 807.03 27.39 779.64 Well recovering.

1/9/2014 9:20 807.03 18.37 788.66 Well recovering.

1/13/2014 NM 807.03 NM NM Not measured. Falling head test in prooress.

1/16/2014 14:14 807.03 11.43 795.60 2/18/2014 12:04 807.03 9.80 797.23 Notes:

1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.
4. NM =Not Measured
5. Well has very slow recovery.

Prepared by/Date:

Checked by/Date:

WatecltflV~H"Ri\1E!ilrrF.ftrcll~~ifRe~. 4 CRP-1112.16 Page 1.1-42 of 44

GROUNDWATER LEVEL

SUMMARY

  • OBSERVATION WELL OW-429U CLINCH RIVER SMR PROJECT OAK RIDGE, ROANp COUNTY, TENNESSEE AMEC PROJECT NO. 6468*13*1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELLID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 11/12/2013 11:40 799.17 40.47 758.70 11/23/2013 12:59 799.17 37.07 762.10 OW-429U 12/9/2013 13:23 799.17 32.28 766.89 12/20/2013 9:33 799.17 30.95 768.22 TVA sampling welt. Pump in well overniaht.

1/13/2014 8:54 799.17 30.97 768.20 2/18/2014 8:53 799.17 32.28 766.89 Notes:

1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Watec~ER!I'iflioi!>§Rt~Ttm¥v?4 CRP-1112.16 Page 1.1-43 of .44

GROUNDWATER LEVEL

SUMMARY

- OBSERVATION WELL OW-429L CLINCH RIVER SMR PROJECT OAK RIDGE, ROANE COUNTY, TENNESSEE AMEC PROJECT NO. 6468-13-1072 OBSERVATION REF. POINT WATER LEVEL WATER LEVEL DATE TIME NOTES WELL ID ELEVATION (ft) DEPTH (ft) ELEVATION (ft) 11/12/2013 11:42 799.49 162.64 636.85 11/23/2013 12:56 799.49 161.00 638.49 OW-429L 12/9/2013 13:28 799.49 159.30 640.19 12/20/2013 9:36 799.49 158.20 641.29 1/13/2014 8:55 799.49 160.00 639.49 2/18/2014 8:55 799.49 156.77 642.72 Notes:

1. Depths referenced to mark on Top of Casing.
2. Survey Vertical Datum is NAVD 88
3. See Appendix E.1 for well construction details.

Prepared by/Date:

Checked by/Date:

Watel(}fill;~ti=RIW!Prriat!ll~jwftitfREiv9 4 CRP-1112.16 Page 1.1-44 of 44