|
---|
Category:Environmental Report
MONTHYEARML19030A9532019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix E.3 - Pages 44-100 ML19030A9882019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix G.1 - Pages 20-34 ML19030A9862019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix G.1 - Pages 1-19 ML19030A9842019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix F.3 - Pages 1-7 ML19030A9832019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix F.2 - Pages 1-11 ML19030A9812019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix F.1 - Pages 1-145 ML19030A9782019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix E.4 - Pages 1-185 ML19030A9772019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix E.3 - Pages 481-515 ML19030A9752019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix E.3 - Pages 454-480 ML19030A9722019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix E.3 - Pages 401-453 ML19030A9702019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix E.3 - Pages 351-400 ML19030A9622019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix E.3 - Pages 251-300 ML19030A9592019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix E.3 - Pages 201-250 ML19030A9572019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix E.3 - Pages 151-200 ML19030A9902019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix G.1 - Pages 35-45 ML19030A9502019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix E.3 - Pages 1-43 ML19030A9472019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix E.2 - Pages 70-104 ML19030A9452019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix E.2 - Pages 42-69 ML19030A9432019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix E.2 - Pages 1-41 ML19030A9412019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix E.1 - Pages 1-46 ML19030A9392019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix D.2 - Pages 31-38 ML19030A9352019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix D.2 - Pages 1-30 ML19030A9332019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix D.1 - Pages 17-32 ML19030A9312019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix D.1 - Pages 1-16 ML19030A9282019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix C - Pages 1826-1849 ML19030A9242019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix C - Pages 1801-1825 ML19030A9212019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix C - Pages 1776-1800 ML19030A9172019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix C - Pages 1751-1775 ML19030B0222019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix G.3 - Pages 21-30 ML19030A9122019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix C - Pages 1726-1750 ML19030B0392019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix I.2 - Pages 1-9 ML19030B0372019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix I.1 - Pages 1-44 ML19030B0362019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix H.2 - Pages 91-111 ML19030B0352019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix H.2 - Pages 61-90 ML19030B0342019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix H.2 - Pages 31-60 ML19030B0332019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix H.2 - Pages 1-30 ML19030B0312019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix H.1 - Pages 1-18 ML19030B0292019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix G.6 - Pages 1-598 ML19030B0272019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix G.5 - Pages 1-13 ML19030B0252019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix G.4 - Pages 1-37 ML19030B0232019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix G.3 - Pages 31-47 ML19030A9092019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix C - Pages 1701-1725 ML19030B0202019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix G.3 - Pages 1-20 ML19030B0172019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix G.2 - Pages 88-91 ML19030B0142019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix G.2 - Pages 80-87 ML19030B0122019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix G.2 - Pages 70-79 ML19030B0082019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix G.2 - Pages 60-69 ML19030B0062019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix G.2 - Pages 50-59 ML19030B0042019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix G.2 - Pages 40-49 ML19030B0012019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix G.2 - Pages 30-39 2019-01-18
[Table view] Category:License-Application for Early Site Permit (ESP)
MONTHYEARML19030A5012019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix B.1 - Pages 70-77 ML19030A4152019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 02 - Section 02.08 - Noise ML19030A4172019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 02 - Section 02.09 - Related Federal Project Activities ML19030A4202019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 03 - Plant Description ML19030A4222019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 04 - Environmental Impacts of Construction ML19030A4242019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.01 - Environmental Impacts of Station Operation ML19030A4262019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.02 - WATER-RELATED Impacts ML19030A4282019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.03 - Cooling System Impacts ML19030A4302019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.04 - Radiological Impacts of Normal Operation ML19030A4322019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.05 - Environmental Impacts of Waste ML19030A4342019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.06 - Transmission System Impacts ML19030A4362019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.07 - Uranium Fuel Cycle and Transportation Impacts ML19030A4392019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.08 - Socioeconomic Impacts ML19030A4412019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.09 - Decommissioning Impacts ML19030A4422019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.10 - Measures and Controls to Limit Adverse Impacts During Operation ML19030A4442019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.11 - Cumulative Impacts Related to Station Operation ML19030A4472019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 06 - Environmental Measurements and Monitoring Programs ML19030A4492019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 07 - Environmental Impacts of Postulated Accidents Involving Radioactive Materials ML19030A4502019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 08 - Need for Power ML19030A4532019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 09 - Alternatives ML19030A4552019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 10 - Environmental Consequences of the Proposed Action ML19030A4582019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Appendix a - Consultation - Pages 0-A6 ML19030A4602019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Appendix a - Consultation - Pages A7-A11 ML19030A4632019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Appendix a - Consultation - Pages A12-A34 ML19030A4662019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Appendix a - Consultation - Pages A35-A46 ML19030A4692019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Appendix a - Consultation - Pages A47-A52 ML19030A4712019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Appendix a - Consultation - Pages A53-A54 ML19030A4742019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Appendix a - Consultation - Pages A55-A64 ML19030A4762019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Appendix a - Consultation - Pages A65-A91 ML19030A4772019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Appendix B - Environmental Protection Plan ML19030A4812019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Site Vicinity Geologic Map Plates - Plate 1 ML19030A4822019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Site Vicinity Geologic Map Plates - Plate 2A ML19030A4832019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Site Vicinity Geologic Map Plates - Plate 2B ML19030A4842019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Site Vicinity Geologic Map Plates - Plate 2C CNL-19-018, Resubmittal of Clinch River Nuclear Site Early Permit Application, Revision 22019-01-18018 January 2019 Resubmittal of Clinch River Nuclear Site Early Permit Application, Revision 2 ML19030A4862019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Site Vicinity Geologic Map Plates - Plate 2D ML19030A4872019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Index ML19030A4882019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - TVA Quality Assurance Program - Nuclear Quality Assurance Plan ML19030A4892019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Pages 1-46 ML19030A4902019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Pages 47-82 ML19030A4912019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix a - Pages 1-9 ML19030A4922019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix a - Pages 10-18 ML19030A4932019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix B.1 - Pages 1-22 ML19030A4942019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix B.1 - Pages 23-28 ML19030A4952019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix B.1 - Pages 29-40 ML19030A4962019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix B.1 - Pages 41-44 ML19030A4982019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix B.1 - Pages 45-52 ML19030A4992019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix B.1 - Pages 53-60 ML19030A5002019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix B.1 - Pages 61-69 ML19030A5352019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix B.1 - Pages 353-361 2019-01-18
[Table view] |
Text
Clinch River Nuclear Site Early Site Permit Application Part 3, Environmental Report 2.9 RELATED FEDERAL PROJECT ACTIVITIES The purpose of this section is to identify any federal or other activities within the region that are related to the Clinch River (CR) Small Modular Reactor (SMR) Project and could have cumulative impacts on the proposed action. Actions related only to the granting of licenses, permits, or approvals by other federal agencies are not considered in this review. This section also determines the potential need for another agency to cooperatively participate in the Environmental Report (ER) process.
For the purposes of this section of the ER, the activities or projects evaluated are limited to federal projects or activities that meet the following criteria:
- Federal projects or activities associated with acquisition and/or use of the proposed project site and transmission corridors or of any other offsite property needed for the proposed project
- Federal projects or activities that are required either to provide an adequate source of facility cooling water or to ensure an adequate supply of cooling water is available over the operating lifetime of the facility
- Federal projects or activities that must be completed as a condition of facility construction or operation
- Federal agency plans or commitments that result in significant new power purchases within the applicant's service area that have been used to justify a need for power
- Federal projects that are contingent on facility construction and operation Three federal activities associated with the CR SMR Project were identified that meet one or more of the criteria listed above. These federal activities are: (1) roadway modifications to Tennessee State Highway (TN) 58, Bear Creek Road, and West (W) Bear Creek Road; (2) refurbishment of the barge terminal along Bear Creek Road; and (3) new transmission lines and substations. These three identified activities are described in the following sections.
2.9.1 TN 58/Bear Creek Road Modifications As indicated in Subsection 4.4.2.3, roadway modifications are required along TN 58 and Bear Creek Road to support the construction of the Clinch River Nuclear (CRN) Site. The U.S.
Department of Energy (DOE) currently manages part of the land to be impacted. To accommodate anticipated traffic accessing the CRN Site during the estimated peak traffic year (largest number of onsite construction and operations workers), necessary modifications include:
- Adding an additional loop ramp connecting TN 58 and Bear Creek Road
- Closing existing left-bound turn lanes onto the current loop ramp 2.9-1 Revision 1
Clinch River Nuclear Site Early Site Permit Application Part 3, Environmental Report
- Adding additional turn lanes on TN 58 and Bear Creek Road
- Constructing a dual-lane roundabout on Bear Creek Road
- Widening Bear Creek Road from two to four lanes including the ability for reversible lanes
- Straightening and realigning Bear Creek Road at the CRN Site entrance (Reference 2.9-1)
The area in which the proposed modifications would occur is shown on Figure 3.1-1 (CRN Site Utilization Plan) and 3.1-2.
Modifications of these public roadways will be coordinated with the Tennessee Department of Transportation and with DOE, which currently manages part of the land that would be impacted.
2.9.2 Barge Terminal Refurbishment Some construction materials and equipment could be transported to the CRN Site by barge.
Therefore, construction of the CR SMR Project could also require refurbishment of the inactive DOE barge terminal located at CRM 14.1, near Bear Creek Road and the TN 58 ramp (Figure 3.1-1). Refurbishment of the terminal will be coordinated with DOE, which currently manages the land on which the barge terminal is located. Additional details of proposed barge terminal modifications are to be provided at COLA.
2.9.3 69 kV Underground Transmission Line To meet the project objective of demonstrating a more reliable electric power supply through SMR operation in power island mode to critical facilities, the proposed CR SMR Project requires an additional 69 kilovolt (kV) transmission line. This new line connects the power plant to the Bethel Valley substation located approximately 5 miles (mi) to the northeast of the CRN Site. The proposed new transmission line is underground and primarily within the existing Bull Run SP-Watts Bar NP 500 kV transmission line right-of-way (ROW; Figure 3.7-2). The construction of this new line may also require new access roads. An expansion of the Bethel Valley substation is part of this process.
Tennessee Valley Authority (TVA) proposes to accomplish all of the upgrades and new switchyard construction within existing ROWs and/or existing substation locations. The ROW, the substations, and the surrounding property are currently owned and maintained by either TVA or DOE. Additional details of proposed new transmission lines are to be provided at COLA.
2.9.4 Summary Aside from the three identified federal activities discussed above, no other activities associated with the CR SMR Project have been identified.
The three activities discussed above require coordination with other federal agencies. However, the federal agencies involved in these additional activities do not need to cooperatively 2.9-2 Revision 1
Clinch River Nuclear Site Early Site Permit Application Part 3, Environmental Report participate in the preparation of the ER or the U.S. Nuclear Regulatory Commissions (NRC)
Environmental Impact Statement process.
In September 2008, NRC and the U.S. Army Corps of Engineers (USACE) signed an updated memorandum of understanding regarding environmental reviews for authorizations to construct and operate nuclear power plants (Reference 2.9-2). No federal agencies other than USACE have been identified as potential cooperating agencies. However, some collaboration with federal agencies may be required as part of the COLA preparation due to the need for permits, authorizations, and consultations associated with construction or operation of two or more SMRs. Permits, authorizations, and consultations are discussed in Section 1.2.
2.9.5 References Reference 2.9-1. AECOM, "Clinch River Site Traffic Assessment, Final Technical Report, Revision 0," Tennessee Valley Authority, March, 2015.
Reference 2.9-2. Flanders, Scott C., Notice of Availability of Memorandum of Understanding between U.S. Army Corps of Engineers and U.S. Nuclear Regulatory Commission on Environmental Reviews Related to the Issuance of Authorizations to Construct and Operate Nuclear Power Plants, September 19, 2008.
2.9-3 Revision 1