LER 80-018/01T-0:on 800508,during Ongoing Hanger Baseplate Analysis for IE Bulletin 79-02,both Svc Water Headers Inoperable.Caused by Inadequate Hanger Baseplate Supports. Redesign & Mod of Supports Begun.Seven Hangers Completed
ML19323G419
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/22/1980
From: Criscione J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19323G415 List:
References
IEB-79-02, IEB-79-2, LER-80-018-01T, LER-80-18-1T, NUDOCS 8006020392
Download: ML19323G419 (2)


Text

. - ._. . _ _ __ . - _ _ _ . _. -. . _ _ . .

.Rc .o- 2 7 77)

LICENSEE EVENT REPORT CONT;;OL BLOCK: l (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) l l l l l lh olil8lC lT UCENSEE lM lNCODE lS l2 lgl150 j 0 l- l0UCENSE l0 l0 l0 l- l 0 l 0 l250 lgl4 l1 l1 l1 l lg 9 14 NUMcER 26 UCENSE TYPEl1 JG lglS 7 CAT SS 4

CON'T OIiI S

%u' "CI 60 l L Stl@l 0I DOCal;ET 5101010131316 NUMgER 68 l@l 69 0IEVENT 510 I 8 I 874IO 75l@l0REPORT CATE Is 1212OATE la80 lo l@

EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h O 121 i During the on-coina hancer base-plate analysis for NRC IE Bulletin 79-02. and with I O 12 i i the plant at 100 percent power, both service water headers were declared inocerable l FO TT1 I which resulted in plant operation per Technical Specification 3.0.3 since conditions I

l0 iSi I were in excess of those addressed in the Action Statement of Technical Specification I 1 1O is 1 l 3.7.4.1. , i I

10171 I I

i o is i I

  • C$0E TOO SuTCiEE CouPONENT COCE Su"eSIO'E SuNEE 10191 l WI El@ lB l@ l Al@' l S l U l P l0 lR lT l@ l A l@20 y @

7 8 9 to 11 12 13 18 19 SEQUENTIAL OCCURRENCE REPORT REVISION EVENT YEAR R EPOR T NO: CODE TYPE NO.

LER

@ yg/ROa l 8l 0l l_l l 0l1l 8l l/l l0l1l lT l l_l l0 l E N '#CIVEN O P IT **"ETE""

M 0 OuRS 22 ^ltI^di 17 E!" ids '"'u"P

$ t?E - uA u"IfEA"lER l23F jgl34F jg l35A[g l A lg 36 3 l/ 0l4l6l l 40 lY lg lY ]g 41 42 l A lg l 8 l1 l 3 l047 lg 43 44 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS lt60i i The cause of the service water header inocerative status was determination that i Ii lii l oiesently installed hanger base-plate succorts did not orovide a factor of safetv i a

it ,2, I greater than two. This resulted in plant operation oer Technical Soecification I iii3 1 3.0~.3, and the plant was placed in cold shutdown within 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Redesign and I iii.i I modification of the service water hanger supports was initiated and is proceeding. I 7 8 9 . 80 STA  % POWER OTHER STATUS IS Y OtSCOVERY OESCRIPTION Ii 15 I lE l@ l1 l 0 l0 l@l NA l l Dl@l Notification From A/E l A TivtTY CO TENT -

KELEASED OP RELEASE ' AMOUNT OP ACTIVITY LOCATION OF RELEASE NA l l NA l 1

I t Is l lZ l @ l Z l@l

~

PERSONNEL EXPOS ES *

  • NUM8ER, TYPE DESCPitPTION 39 NA li i r l l0 l0 l0 l@l Z i@l l

' ' ' ,ERSON~a'iNJES '

NuMsER DESCRIPTION @

[TT7]l0l0l0l@l 7 8 9 11 12 NA 80 l

LOSS OP OR CAMAGE TO PACluTY hA l fit 918 9lZ l@l 7 to 80 2 O esbg @DE CRIPTIONl News release through Public Relations Department l lllllllllllIlk L 7 8 9 'to 68 69 80. -

e

.In k n d'rierinna'O U O OO20%R _ _ . _9nt44717ot

ATTACHMENT LER 80-18/lT-0 Millstone Unit 2 Docket No. 50-336 EVENT DESCRIPTION:

During the on-going hanger base-plate analysis for NRC IE Bulletin 79-02, it was detennined that several service water support hangers did not provide a factor of safety greater than two. Therefo re, both service water headers were declared inoperable which resulted in plant operatinn per Technical Specification 3.0.3 since conditions were in excess of those addressed in the Action Statement of Technical Specification 3.7.4.1. Accordingly, preparations were made to proceed to place the plant in cold shutdown within 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

CAUSE DESCRIPTION AND CORRECTIVE ACTION:

The cause of the inoperable service water headers was a factor of safety of less than 2 on several hanger baseplates. A pipe stress analysis run with the effected hangers removed showed the potential for piping overstress conditions. Work commenced in parallel with the analysis of additional systems identified for further review under Bulletins 79-02 and 79-14 to upgrade all effected hangers to a factor of safety greater than 4. At this time, 7 hangers have been completed on the service water system and additional hanger work is proceeding on the service water headers. Because the piping stress analysis is incomplete, the total number of hangers to be repaired is not known. However, there are hangers identified for analysis by 79-14 on the safety injection system and main steam system. The final results of the hanger modifications will be provided in an update report.