ML20024J329

From kanterella
Revision as of 01:35, 12 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 94-027-00:on 940903,determined That Channel B Linear Range Nuclear Instrument Inoperable as Result of Connector J6 Being Disconnected from Jack.Connector J6 Reinstalled.W/ 941003 Ltr
ML20024J329
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/03/1994
From: Lutzi P, Miller D
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-94-027-01, LER-94-27-1, MP-94-569, NUDOCS 9410130341
Download: ML20024J329 (4)


Text