ML113470430

From kanterella
Revision as of 20:40, 6 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection
ML113470430
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 12/13/2011
From: Hopper G
Reactor Projects Branch 7
To: James Shea
Tennessee Valley Authority
References
Download: ML113470430 (9)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 December 13, 2011 Mr. Joseph Shea Acting Vice President, Nuclear Licensing Tennessee Valley Authority LP 4B 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION

Dear Mr. Shea:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Browns Ferry Nuclear Plant during the weeks of February 6 - 10 and February 20 - 24, 2012. The inspection team will be led by Mr. Gerald Wilson, a Senior Project Engineer from the NRCs Region II office. This inspection will be conducted in accordance with the baseline inspection procedure, Procedure 71152, Problem Identification and Resolution, issued on August 18, 2011.

The biennial PI&R inspection and assessment of the licensees Corrective Action Program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and semiannual trend PI&R reviews.

On December 13, 2011, Mr. Wilson confirmed with Mr. Jim Davenport of your staff, arrangements for the two-week onsite inspection.

The enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than January 17, 2012. Contact Mr. Wilson with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.

If additional documents are needed, they will be requested when identified. Prior to the onsite inspection, Mr. Wilson will discuss with your staff the following inspection support administrative details: availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during the inspection; access to licensee computers; working space; arrangements for site access; and other applicable information.

TVA 2 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mr. Wilson at (404) 997-4613.

Sincerely,

/RA by Ryan Taylor Acting For/

George T. Hopper, Chief Reactor Projects Branch 7 Division of Reactor Projects Docket Nos.: 50-259, 50-260, 50-296 License Nos.: DPR-33, DPR-52, DPR-68

Enclosure:

INFORMATION REQUEST FOR BROWNS FERRY NUCLEAR PLANT PROBLEM IDENTIFICATION & RESOLUTION INSPECTION cc w/encl: (See page 3)

PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.

PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

__ML113470430_________ X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE GJW RCT1 for NAME GWilson GHopper DATE 12/13/2011 12/13/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO TVA 3 cc w/encl: James L. McNees, CHP K. J. Polson Director Site Vice President Office of Radiation Control Browns Ferry Nuclear Plant Alabama Dept. of Public Health Tennessee Valley Authority P. O. Box 303017 Electronic Mail Distribution Montgomery, AL 36130-3017 C.J. Gannon Senior Resident Inspector General Manager U.S. Nuclear Regulatory Commission Browns Ferry Nuclear Plant Browns Ferry Nuclear Plant Tennessee Valley Authority U.S. Nuclear Regulatory Commission Electronic Mail Distribution 10833 Shaw Road Athens, AL 35611-6970 J. E. Emens Manager, Licensing Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Manager, Corporate Nuclear Licensing -

BFN Tennessee Valley Authority Electronic Mail Distribution E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority Electronic Mail Distribution T. A. Hess Tennessee Valley Authority Electronic Mail Distribution Chairman Limestone County Commission 310 West Washington Street Athens, AL 35611 Donald E. Williamson State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 30317 Montgomery, AL 36130-3017

TVA 4 Letter to Joseph W. Shea from George T. Hopper dated December 13, 2011

SUBJECT:

BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION Distribution w/encl:

C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrownsFerry Resource

INFORMATION REQUEST FOR BROWNS FERRY NUCLEAR PLANT PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (FEBRUARY 6 - 10, 2012 AND FEBRUARY 20-24, 2012)

Note: Unless otherwise noted, the information requested below corresponds to documents generated since October 1, 2010. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.

1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to:

a) Corrective action process b) Cause evaluation c) Operating experience program d) Employee concerns program e) Self-assessment program f) Maintenance rule program and implementing procedures g) Operability determination process h) Degraded/non-conforming condition process (e.g., RIS 2005-20) i) System health process or equivalent equipment reliability improvement programs j) Preventive maintenance deferral process If any of the procedures requested above were revised after October 1, 2010, please provide (or have available) copies of all revisions during the onsite inspection.

2. List of top ten risk significant systems, top ten risk significant components for each one of the top ten risk significant systems, and top ten risk significant operator manual actions
3. List of all Problem Evaluation Reports (PERs) initiated including the following information for each PER:

a) PER number b) Brief, but complete problem description c) Priority or level d) Affected system e) Affected component f) Responsible plant department g) PER completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below).

PER # Problem Priority System Component Org Status PER001 A RHR Pump 2 RHR 2-RHR- ENG Open failed flow criteria PMP-A per SR 5.0.5.4 Enclosure

2

4. List of outstanding corrective actions including the following information for each action:

a) Corrective action number b) Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc) c) Brief, but complete corrective action description d) Associated PER number e) Corrective action initiation date f) Number of extensions g) Corrective action due date h) Completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below).

Corrective Type Description PER Initiation Extensions Due Status Action # Date Date AR0034 CAPR Revise PER0058 01/05/08 2 06/15/08 Awaiting Procedure CARB NGK-003-4585 review

5. List of control room deficiencies with a brief description and corresponding PER and/or work order (WO) number
6. List of operator workarounds and operator burdens with a brief description and corresponding PER number
7. List of all currently extended or overdue PERs, sorted by initiation date, with the following information:

a) PER number b) Priority or Significance c) PER title and short description

8. List of all PERs that have been voided, cancelled, or deleted. Please provide the following information for each PER:

a) PER number b) Brief, but complete problem description c) Reason voided, cancelled, or deleted

9. List of all structures, systems, and components (SSCs) which were classified as (a)(1) in accordance with the Maintenance Rule since October 2010. Please include the following information for each system in (a)(1):

a) Date of classification in (a)(1)

Enclosure

3 b) Reason for being placed in (a)(1) c) Planned actions and their status

10. List of Maintenance Preventable Functional Failures (MPFF) of risk significant systems.

Please include actions completed and current status.

11. List of corrective maintenance work orders. Please include the following information for each work order:

a) WO number b) Brief, but complete work description c) Affected system and components d) Date of initiation e) Date of completion (if completed)

If possible, provide this list in a format compatible with spreadsheet software (example shown below).

Work Description System Component Initiation Due Status Order # Date Date WO01345 Replace breaker SI 2A-SI-PMP, 01/05/08 03/15/09 Closed 2A-BKR-08-BB4 BKR-08-BB4 for 2A SI Pump.

12. Corrective action closeout packages, including PERs with description of corrective actions, for all NRC findings and Licensee identified violations (LIVs). Please include a cross reference linking NRC Finding numbers and LIVs to appropriate PER numbers
13. Corrective action closeout packages, including PERs with description of corrective actions, for all licensee event reports (LERs) issued. Please include a cross reference linking LER number to appropriate PER number.
14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.)

and industry operating experience (OE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.) evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g., PER number) for the documents that evaluated the aforementioned OE information.

15. Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the corrective action program
16. Copies of all department self-assessments
17. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment Enclosure

4 reliability trends

18. Copy of the latest Corrective Action Program statistics (if exists) such as the number of PERs initiated by department, human performance errors by department, and others as may be available
19. Copies of any minutes of meetings by the offsite safety review boards/groups. In addition, please provide a list of routine meetings involving the CAP to be held while team is onsite
20. List of PERs related to equipment aging issues in the top ten risk significant systems since August 2007 (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.;

environmental qualification). Please provide the following information for each PER:

a) PER number b) Priority c) PER problem description

21. If performed, please provide any recent self-assessment of the site safety culture completed for 2010.
22. Copies of corrective action program documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods
23. List of all root cause evaluations with a brief description
24. Copy of Probabilistic Risk Assessment importance measures report, if available
25. System Health Reports, system design basis documents, and system description information for the top ten risk significant systems
26. Copy of the safe shutdown procedure
27. List of all corrective actions planned/completed from the 2010 95002
28. List of all Fire Protection Risk Reduction modifications and documentation
29. Copy of risk analysis completed for all identified fire protection issues.

Enclosure