ML12328A107

From kanterella
Revision as of 11:23, 6 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRR E-mail Capture - FW: Inquiry Concerning Backup Power Generators - Contact Information Added
ML12328A107
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 11/21/2012
From: Feintuch K
Division of Operating Reactor Licensing
To: Browning T
Florida Power & Light Co
References
Download: ML12328A107 (3)


Text

NRR-PMDAPEm Resource From: Feintuch, Karl Sent: Wednesday, November 21, 2012 10:22 PM To: 'Browning, Tony'

Subject:

FW: inquiry concerning backup power generators - contact information added Below Mr. Faust provided contact information, which was omitted from his initial message.

From: RidsNrrPMDuaneArnold Resource [1]

Sent: Wednesday, November 21, 2012 4:43 PM To: Feintuch, Karl

Subject:

FW: inquiry concerning backup power generators From: Faust, William E[SMTP:WILLIAM.FAUST@ACEGROUP.COM]

Sent: Wednesday, November 21, 2012 4:42:30 PM To: RidsNrrPMDuaneArnold Resource

Subject:

RE: inquiry concerning backup power generators Auto forwarded by a Rule My contact information should have been appended to my message:

Bill Faust Senior Risk Analyst Enterprise Risk Management (ERM)

ACE Group Tel. 215.640.1249 From: Faust, William E Sent: Wednesday, November 21, 2012 4:20 PM To: 'RidsNrrPMDuaneArnold.Resource@nrc.gov'

Subject:

inquiry concerning backup power generators ACE is researching sundry aspects of nuclear power plants. You are probably aware that the Fukushima power plant problems in Japan arose, in part, from the flooding of backup power generators. Please advise me whether the backup power generators for your two power plants reactors are in watertight structures or, if not, at what height they are located. I found nothing online and NRC staff advised me that contacting the power plants project manager would probably be the most expeditious means to obtain this information.

Thanks and I look forward to the courtesy of your reply.

ACE is a global provider of insurance products. The ERM unit is in its Corporate Actuary department.

This email is intended for the designated recipient(s) only, and may be confidential, non-public, proprietary, protected by the attorney/client or other privilege. Unauthorized reading, distribution, copying or other use of this communication is prohibited and may be unlawful. Receipt by anyone other than the intended recipient(s) should not be deemed a waiver of any privilege or protection. If you are not the intended recipient or if you 1

believe that you have received this email in error, please notify the sender immediately and delete all copies from your computer system without reading, saving, or using it in any manner. Although it has been checked for viruses and other malicious software (malware), we do not warrant, represent or guarantee in any way that this communication is free of malware or potentially damaging defects. All liability for any actual or alleged loss, damage, or injury arising out of or resulting in any way from the receipt, opening or use of this email is expressly disclaimed.

2

Hearing Identifier: NRR_PMDA Email Number: 542 Mail Envelope Properties (26E42474DB238C408C94990815A02F099978B803D8)

Subject:

FW: inquiry concerning backup power generators - contact information added Sent Date: 11/21/2012 10:22:16 PM Received Date: 11/21/2012 10:22:00 PM From: Feintuch, Karl Created By: Karl.Feintuch@nrc.gov Recipients:

"'Browning, Tony'" <Tony.Browning@fpl.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 2828 11/21/2012 10:22:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: