ML17216A762

From kanterella
Revision as of 13:50, 4 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Redacted Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Figure 13.1-2 Through Figure 13.5-2
ML17216A762
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/19/2016
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16357A167 List:
References
Download: ML17216A762 (8)


Text

LGS UFSAR Figure 13.1-1 Deleted

VICE PRESIDENT PLANT MANAGER MANAGER MANAGER DIRECTOR MANAGER HUMAN DIRECTOR REGULATORY SITE ORGANIZATIONAL RESOURCES TRAINING ASSURANCE ENGINEERING EFFECTIVENESS EXPERIENCE ASSESSMENT DIRECTOR MANAGER DIRECTOR DIRECTOR WORK RADIATION MAINTENANCE PLANT OPERATIONS MANAGEMENT PROTECTION SR. MANAGER MANAGER SR. MANAGER PLANT OPERATIONS MANAGER- MANAGER MANAGER OPERATIONS ENGINEERING TRAINING REACTOR ENGINEERING CHEMISTRY/

NUCLEAR SUPPORT/SERVICES RADWASTE SECURITY SR. MANAGER MANAGER MANAGER MANAGER DESIGN MAINTENANCE &

OUTAGES OPERATIONS ENGINEERING TECHNICAL TRAINING SUPPORT MANAGER I&C MAINTENANCE MANAGER MANAGER MANAGER MANAGER TRAINING ONLINE WORK OPERATIONS PROGRAMS SUPPORT CONTROL SERVICES MANAGER MECHANICAL/ELECTRICAL MAINTENANCE MANAGER SHIFT OPERATIONS SUPPLY SUPERINTENDENT MANAGEMENT (SOS)

MANAGER MAINTENANCE PLANNING SHIFT MANAGERS MANAGER MAINTENANCE SUPPORT SHIFT SHIFT TECHNICAL SUPERVISORS ADVISOR (SRO)

MANAGER CMO OPERATORS LIMERICK GENERATING STATION (INCLUDES ROS)

THE DIRECTOR- PLANT OPERATIONS, AN UNITS 1 AND 2 OPERATIONS MANAGER OR THE SHIFT UPDATED FINAL SAFETY ANALYSIS REPORT OPERATIONS SUPERINTENDENT SHALL HOLD THE SRO LICENSE ORGANIZATION CHART LIMERICK GENERATING STATION FIGURE 13.1-2 Rev. 18 09/16

VICE PRESIDENT PLANT MANAGER MANAGER MANAGER RADIATION CHEMISTRY/

PROTECTION RADWASTE MANAGER FIELD MANAGER OPERATIONAL RADWASTE/ CHEMISTRY RADIOLOGICAL OPERATIONS TECH. SUPPORT CHEMISTRY ENVIRONMENTAL PROGRAMS ENGINEERING MANAGER SUPERVISOR SUPERVISOR SUPERVISOR HEALTH EFFLUENT INSTRUMENT RADIOLOGICAL TECHNICAL TECHNICAL TECHNICAL PHYSICS MONITORING PHYSICIST ENGINEERS SUPPORT SUPPORT SUPPORT SUPERVISORS PHYSICIST HEALTH RESPIRATORY TECHNICAL PHYSICS PROTECTION SUPPORT TECHNICIANS PHYSICIST SPECIALIST RESPIRATORY DOSIMETRY DOSIMETRY LIMERICK GENERATING STATION PROTECTION PHYSICIST CLERKS UNITS 1 AND 2 HP TECHNICIANS UPDATED FINAL SAFETY ANALYSIS REPORT ORGANIZATION CHART RADIATION PROTECTION/

CHEMISTRY ORGANIZATION FIGURE 13.1-3 Rev. 15 09/10

LGS UFSAR Figure 13.1-4 Deleted

VICE PRESIDENT LGS DIRECTOR TRAINING MANAGER MANAGER MANAGER MAINTENANCE OPERATIONS TRAINING

& TECHNICAL TRAINING SUPPORT TRAINING LIMERICK GENERATING STATION UNITS 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT TRAINING ORGANIZATION FIGURE 13.2-1 Rev. 15, 09/10

Security Related Information Figure withheld Under 10 CFR 2.390

Security Related Information Figure withheld Under 10 CFR 2.390

Security Related Information Figure withheld Under 10 CFR 2.390