MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) IA-99-247, Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5)1999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML20207C7531999-05-17017 May 1999 Discusses Issue Identified by FPL in Feb 1998 Involving Potential for Fire to Cause Breach of Rc Sys High/Low Pressure Interface Boundary & NRC Decision for Exercise of Enforcement Discretion ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl 1999-09-28
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl ML17229B0851999-04-0505 April 1999 Requests Approval of Encl Relief Request 25 Which Proposes to Use Alternative Requirements of ASME Code Case N-613 in Lieu of Requirements of ASME Section XI Figures IWB-2500-7(a) & IWB-2500-7(b).Action Requested by Aug 1999 ML17309A9791999-03-31031 March 1999 Forwards Revised EPIPs Including Rev 2 to EPIP-00,rev 2 to EPIP-09,rev 2 to EPIP-10 & Rev 10 to HP-207.Summary of Revs Listed ML17309A9761999-03-23023 March 1999 Forwards Revised Epips,Including Rev 4 to EPIP-03, Er Organization Notification/Staff Augmentation, Rev 3 to EPIP-05, Activation & Operation of OSC & Rev 14 to HP-200, HP Emergency Organization. Changes to Epips,Discussed ML17229B0691999-03-19019 March 1999 Transmits TS Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity,Per Soluble Boron Credit ML17229B0721999-03-16016 March 1999 Requests Approval of Enclosed Relief Requests 23 & 24 Re ISI Plan for Second ten-year Interval.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML17229B0481999-03-10010 March 1999 Informs That Util Delivered Matls Requested in Encl 1 of NRC Ltr by Hand on 990308,as Requested by NRC Ltr Dtd 990218 1999-09-25
[Table view] |
Text
CATEGORY 1 REGULATORY INFORMATION DISTRIBUTIO SYSTEM (RIDS)
ACCESSION NBR:9812010108 DOC.DATE: 98/11/22 NOTARIZED: YES DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION STALL,J.A. Florida Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
SUBJECT:
Submits response to GL 98-02, "Loss of Reactor Coolant Inventory & Associated Potential for Loss of Emergency Mitigation Functions While in Shutdown Condition."
DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: General Distribution NOTES:
G RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 LA 1 , PD2-3 PD 1 1 GLEAVES,W 1 1 INTERNAL: ACRS 1 1 ER'- 1 1 NRR/DE/ECGB/A 1 1 NRR/DE/EMCB 1 1 NRR/DRCH/HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRZBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 h
TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13
Fiorida Power gt Light Company, 6351 S. Ocean Drive, Jensen Beach, FL 34957 November 22, 199S L-98-278 10 CFR 50.4 10 CFR 50. 54 (f)
U. S. Nuclear Regulatory'Commission Attn: Document Control Desk Washington, D. C. 20555 RE: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Generic Letter 98-02 Initial Res onse The Florida Power and Light Company (FPL) response to Generic Letter (GL) 98-02, Loss of Reactor Coolant Inventory and Associated Potential for Loss of Entergency Mitigation Functions While in a Shutdown Condition, for St. Lucie Units 1 and 2 is attached.
The NRC issued this generic letter to request that licensees (1) perform an assessment of whether the emergency core cooling systems (ECCS) at this facility include certain design features, such as a common pump suction header, which can render the systems susceptible to common-cause failure as a result of events similar to the Wolf Creek reactor coolant system (RCS) drain-down event of September 17~1994; and (2) submit certain information, coricerning the findings regarding potential pathways for inadvertent RCS drain-down and the suitability of surveillance, maintenance, modification and operating practices and procedures regarding configuration control during reactor shutdown cooling. The requested information will enable NRC staff to verify whether St. Lucie complies with NRC regulatory requirements and conforms with the current licensing bases, with regard to prescribing and accomplishing activities affecting quality per Criterion V of Appendix B to 10 CFR Part 50. The NRC staff was specifically concerned about the controls over the conduct of activities during hot shutdown conditions that may affect the g gtr i safety-related functions of the RHR system and the ECCS, for example, the methods used to verify valve position, the controls in place to assure compliance with plant surveillance, maintenance, modification and operating procedures, and the adequacy of operator training for such activities. The FPL response was requested by November 24, 1998.
FPL has performed the requested GL 98-02 review to assess plant design features which could allow interconnection of piping systems to the normal shutdown cooling flowpath that could either permit RCS drain-down or adversely impact the capability of the safety injection system to perform its design function. Potential valve lineup vulnerabilities were identified for both Unit 1 and Unit 2 that could, if misoperated, result in the scenarios identified in the GL. A procedural and process review has determined that the potential crossties are procedurally controlled prior to the initiation of shutdown cooling.
98<a0<0X08 98<zmQ PDR ADQCK 05000235 1' PORQ r
an FPL Group company
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-98-278 Page 2 The attached information is provided pursuant to the requirements of Section 182a of the Atomic Energy Act of 1954, as amended, and 10 CFR 50.54(f).
Please contact us ifthere are any questions about this submittal.
Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/GRM Attachment cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-98-278 Page 3 STATE OF FLORIDA )
) ss.
COUNTY OF ST. LUCIE )
J. A. Stall being first duly sworn, deposes and says:
That he is Vice President, St. Lucie Plant, for the Nuclear Division of Florida Power &'Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.
J. A. Stall STATE OF FLORIDA COUNTY OF ST. LUCIE Sworn to and subscribed before me this <~ dayof M~<t ~,
by J. A. Stall, who is personally known to me.
19'7E Name of otary Public - State of Florida GEORGE R. MADDEN
!,f ~t;=. W COMMISSION 4 CC S82028
~! EXPIRES: June 17,2000 Bonded ltau Notary PuBdo Undentnltara (Print, type or stamp Commissioned Name of Notary Public)
ct~~f" L 4>>
8 K.~ l I. >4 i t ~- f<
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-98-278 Attachment Page 1 St. Lucie Units 1 and 2 NRC Generic Letter 98-02 Response NRC Request 1:
Perform an assessment of whether your emergency cooling systems include certain design features, such as a common pump suction header, which can render the systems susceptible to common-cause failure as a result of events similar to the Wolf Creek RCS drain-down event of September 17, 1994.
FPL Response 1:
Unit 1 Two trains of ECCS components, each containing one HPSI pump, one CS pump, and one LPSI pump are supplied from a common connection on the RWT which branches into separate suction headers for each train. During Mode 4, only one high pressure safety injection pump is required to be OPERABLE for injection into the RCS with suction from the RWT. The RWT is protected from backflow in the suction lines by check valves.
A review of plant procedures and drawings for operation at hot shutdown (Mode 4 on shutdown cooling) has identified six potential flow paths which could direct flow from the normal shutdown cooling flowpath. A summary of the six flowpaths is provided in Table 1 below:
Table 1 Unit 1, 2 Inches and Greater Branch Connections from SDC Normal Flowpath IsoIation.',Valve(s);,"" ;,'myact:on, 'HPSI if Potential:for RCS',,;,;;:~~X>+@',,",-":
Yrain A/Train 3,:'; ';:Inadvertently'.Left Bio'ivdo'>vn ifInadvertently-"
- Open
- :;,,'., Left Open 1 (To CS V07272/V07271 Flashing in HPSI Through Relief Valves SR-Suction) Pump Suction 07-1A/1B and HPSI Pump Recirc to RWT 2 (To HPSI V3663/V3 662 Flashing in HPSI Through HPSI Pump Recirc Suction) Pump Suction to RWT 3 (LPSI Recirc) V3204/V3205 None Pump Recirc to RWT 4 (SIT/RCS V3459 and V3460 None Pump Discharge to RWT Drain) 5 (To Letdown V03108 and None Through CVCS Relief HX) V02000 Valves 6 (To Purif. V03000/V03001 None Through CVCS Relief Filter) and V02013 Valves
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 I 98-278 Attachment Page 2 Flowpaths 1 and 2 are from the shutdown cooling loop downstream of the SDC heat exchangers.
The first is through the NaOH eductors, to the suction of the containment spray pumps. The suction of the spray pump is common with the suction of the same train high pressure safety injection pump. This flowpath is isolated procedurally by closing valves V07271 and V07272. The procedure requires independent verification that the valves are closed prior to initiating shutdown cooling. The second flowpath is through the normally closed valves V3662 and V3663 to the suction of the high pressure safety injection pumps.
While these flowpaths might impact the operation of the high pressure safety injection pump on the same train as the operating low pressure safety injection pump, flow would be prevented from directly entering the RWT from the suction lines by check valves V07119 and V07120. Flow however may be forced through the high pressure safety injection pump and its recirculation line to the RWT. The high pressure safety injection pump on the other train would be unaffected. The containment spray pump recirculation lines are normally locked closed. Inadvertent misposition of these isolation valves would be identified by either lifting of the relief valve on the containment spray/high pressure safety injection pump suction lines (SR-07-1A and 1B), high level alarms in the RWT (LIS-07-3) and/or pressure indication on the discharge of the high pressure safety injection pumps (PI-3308 and PI-3309).
Flowpaths 3 and 4 involve the ECCS pump recirculation lines to the RWT. These flowpaths would allow the RCS to be pumped to the RWT by the low pressure safety injection pumps. The first recirculation flowpath is the normal low pressure safety injection pump recirculation line. This flowpath is isolated procedurally by closing valves V3204 and V3205. The second recirculation flowpath is through two locked closed valves in series (V3459 and V3460).
For the recirculation cases, inadvertent misposition of the isolation valves would be identified by a high alarm in the RWT (LIS-07-3). A review of the NPSH calculation for the high pressure injection pumps during RCS injection from the RCS indicates that even if the RWT were completely filled with 325 'F water above the Technical Specification volume, sufficient NPSH for the high pressure safety injection pumps would still be available. It should be noted that a scenario similar to the one discussed above for the recirculation lines has previously occurred at St. Lucie Unit 1. RCS inventory was inadvertently diverted to the RWT through an incompletely closed recirculation isolation valve in June 1980 per AEOD/S95-01 and AEOD/E704.
Flowpaths 5 and 6 involve flow to the CVCS system. These flowpaths are through normally locked closed valves V03108 and V02000 or V03000/V03001 and V02013, These flowpaths can be opened for filtration/purification purposes when shutdown cooling loop conditions meet the pressure/temperature requirements of the CVCS system. Neither of these flowpaths would be directed to either the RWT or the suction of the high pressure safety injection pumps. However, introduction of shutdown cooling fluid into the low pressure portion of the CVCS system during the initial stages of the cooldown may provide a flowpath through CVCS system relief valves.
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-98-278 Attachment Page 3 St. Lucie Unit 2:
Two trains of ECCS components, each containing one HPSI pump, one CS pump, and one LPSI pump are supplied from a common connection on the RWT which branches into seperate suction headers for each train. During Mode 4, only one high pressure safety injection pump is required to be OPERABLE for injection into the RCS with suction from the RWT. The RWT is protected from backflow in the suction lines by check valves.
A review of plant procedures and drawings for operation at hot shutdown (Mode 4 on shutdown cooling) has identified four potential flow paths that could direct flow from the normal shutdown cooling flowpath. A summary of the four flowpaths is provided in Table 2 below:
Table 2 Unit 2, 2 Inches and Greater Branch Connections from SDC Normal Flowpath Flowpath Jso1atfon Valve(s) Iinptict on"HPSI if .Potential for RCS
,Train A/Train Inadvertently,Left 'Blois'down.if:
Open Iiiadveitently,Left Open (LPSI None Pump Recirc to RWT B'3767/V3205 1
Recirc) 2 V3460/V3511 and None Pump Discharge to RWT (SIT/RCS V3459 and LCV Drain) 12 3 (To U/S V3712/V03012 and None Through CVCS Relief of Purif. V02000 Valves Filter) 4 (To D/S V03000/V03001 and None Through CVCS Relief of Purif. V02013 Valves Filter)
Flowpaths 1 and 2 involve the ECCS pump recirculation lines to the RWT. These flowpaths would allow the RCS to be pumped to the RWT by the low pressure safety injection pumps, The first recirculation flowpath is the normal low pressure safety injection pump recirculation line. This flowpath is isolated procedurally by closing valves V3767 and V3205. The second recirculation flowpath is through two locked closed valves and one normally closed valve in series (V3511/V3460 and V3459 and LCV-07-12).
For the recirculation cases, inadvertent misposition of the isolation valves would be identified by a high alarm in the RWT (LIS-07-3). A review of the NPSH calculation for the high pressure injection pumps during RCS injection from the RCS indicates that even if the RWT were completely filled with 325 'F water above the Technical Specification volume, sufficient NPSH for the high pressure safety injection pumps would still be available.
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-98-278 Attachment Page 4 Flowpaths 3 and 4 involve flow to the CVCS system. These flowpaths are through normally locked closed valves V3712/V03012 and V02000 or V03000/V03001 and V02013. These flowpaths can'e opened for filtration/purification purposes when shutdown cooling loop conditions meet the pressure/temperature requirements of the CVCS system. Neither of these flowpaths would be directed to either the RWT or the suction of the high pressure safety injection pumps. However, introduction of shutdown cooling fluid into the low pressure portion of the CVCS system during the initial stages of the cooldown may provide a flowpath through CVCS system relief valves.
NRC Request 2:
If this susceptibility is found by the review of request 1, prepare, with consideration of plant-specific design attributes, a description of the features of your Appendix B quality assurance program (for example, the methods used to verify valve position, the controls in place to assure compliance with plant surveillance, maintenance, modification and operating procedures, and the adequacy of operator training for such activities) that provide assurance that the safety-related functions of the RHR system and ECCS will not be adversely affected by activities conducted at hot shutdown (such as occurred at Wolf Creek) Addressees may limit their attention to those
~
surveillance, maintenance, modification and operational activities at hot shutdown during which it is feasible to divert RCS fluid to the RWST, resulting in simultaneous drain-down of the RCS and voiding in the suction header for the RHR and ECC system pumps. Addressees may further limit their response to the consideration of potential configurations and conditions that involve flow paths with pipe diameters equal to or greater than 2 inches. The response to part (2) of the above information request need not be submitted to the NRC. However, responses to parts (1) and (2) of the required information shall be kept in a retrievable licensee system that NRC can verify on an as-needed or sample basis.
FPL Response 2:
FPL has completed a review of the controls in place to assure compliance with plant surveillance, maintenance, modification and operating procedures, and the adequacy of operator training for such activities) that provide assurance that the safety-related functions of the shutdown cooling system and ECCS will not be adversely affected by activities conducted at hot shutdown (such as occurred at Wolf Creek). Adequate operator training is included in Lesson Plans (LP) 4502007, Good Operating Practices 98.6, and LP 0802208, Outage Tasks and Outage Related Events, Process controls are included in ADM 09.04, In-Plant Clearance Orders, and AP 0010145, Shutdown Cooling Controls. The flow paths identified in the response to part 1 have been procedurally identified and valves that could admit reactor coolant system flow to the suction of the ECCS pumps while on shutdown cooling in MODE 4 are either locked closed or closed and independently verified for correct valve position. These procedures include NOP-1-0030127, OP-1-0410020, NOP-1-0410022, NOP-2-0410022, ADM 17.06, and AP-1-0010123.
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-98-278 Attachment Page 5 FPL will retain the descriptions of these controls to assure compliance with plant surveillance, maintenance, modification, and operating procedures, and the adequacy of operator training for such activities) that provide assurance that the safety-related functions of the shutdown cooling system and ECCS will not be adversely affected by activities conducted at hot shutdown.