Category:Letter type:RC
MONTHYEARRC-22-0004, (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System2022-01-14014 January 2022 (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System RC-18-0157, (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-28028 December 2018 (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0149, ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-21021 December 2018 ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0136, (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683)2018-12-12012 December 2018 (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683) RC-18-0144, (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 252018-11-20020 November 2018 (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 25 RC-18-0126, (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-01692018-11-0909 November 2018 (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-0169 RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...2018-10-0808 October 2018 (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ... RC-18-0067, (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.22018-10-0808 October 2018 (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2 RC-18-0123, NRC Request for Information Baseline Radiation Safety Inspection2018-10-0404 October 2018 NRC Request for Information Baseline Radiation Safety Inspection RC-18-0117, (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment2018-09-28028 September 2018 (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment RC-18-0112, (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.32018-09-27027 September 2018 (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.3 RC-18-0119, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-09-19019 September 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0118, (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange2018-09-14014 September 2018 (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange RC-18-0116, (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information2018-09-11011 September 2018 (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information RC-18-0113, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-31031 August 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0091, License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions2018-08-29029 August 2018 License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions RC-18-0111, License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-24024 August 2018 License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0100, (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information2018-08-22022 August 2018 (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information RC-18-0105, (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water ..2018-08-14014 August 2018 (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water .. RC-18-0102, Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error2018-08-10010 August 2018 Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0098, (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-07-30030 July 2018 (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0085, (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-01262018-07-23023 July 2018 (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-0126 RC-18-0090, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request...2018-07-12012 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request... RC-18-0089, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-11011 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0084, Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Requ2018-07-0303 July 2018 Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Reques RC-18-0082, Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-0303 July 2018 Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0079, Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error2018-06-29029 June 2018 Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0074, Change of the Commitment Date of DRIB/105A&B Door Submittal2018-06-18018 June 2018 Change of the Commitment Date of DRIB/105A&B Door Submittal RC-18-0060, (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error2018-05-30030 May 2018 (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report2018-05-18018 May 2018 (Vcsns), Unit 1 - Annual Commitment Change Summary Report RC-18-0063, Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation2018-05-0202 May 2018 Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation RC-18-0056, (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors2018-04-25025 April 2018 (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors RC-18-0059, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report RC-18-0046, License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information2018-04-19019 April 2018 License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information RC-18-0036, (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information2018-04-0202 April 2018 (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information RC-18-0041, Report of Status of Decommissioning Funding2018-03-28028 March 2018 Report of Status of Decommissioning Funding RC-17-0175, Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error2018-01-31031 January 2018 Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error RC-18-0006, Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-01-25025 January 2018 Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-17-0169, Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-00192017-12-11011 December 2017 Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-0019 RC-17-0182, (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status2017-12-11011 December 2017 (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status RC-17-0172, Notification of Personnel Changes2017-11-30030 November 2017 Notification of Personnel Changes RC-17-0161, Submittal of Change of the Commitment Date of DRIB/105A&B Door2017-11-28028 November 2017 Submittal of Change of the Commitment Date of DRIB/105A&B Door RC-17-0135, Annual Commitment Change Summary Report2017-11-0303 November 2017 Annual Commitment Change Summary Report RC-17-0123, Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds2017-10-30030 October 2017 Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds RC-17-0140, Transmittal of 10 CFR 50.59 Biennial Report2017-10-23023 October 2017 Transmittal of 10 CFR 50.59 Biennial Report RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change2017-10-0606 October 2017 (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change RC-17-0134, Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 12017-09-27027 September 2017 Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 1 RC-17-0126, Reply to a Notice of Violation, Per Inspection Report 05000395/20170022017-09-0606 September 2017 Reply to a Notice of Violation, Per Inspection Report 05000395/2017002 RC-17-0112, Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days2017-09-0101 September 2017 Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days RC-17-0069, (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description2017-08-30030 August 2017 (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description 2022-01-14
[Table view] Category:Technical Specifications
MONTHYEARML24180A0062024-08-0505 August 2024 Issuance of Amendment No. 227 to Modify Technical Specification 3.8.3.1 to Increase Completion Time for 120-Volt A.C. Vital Busses ML23317A2242023-11-0909 November 2023 (Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23208A0722023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML23012A0152023-02-21021 February 2023 Issuance of Amendment No. 224 to Change Nozzle Blockage Testing Requirement for Reactor Building Spray System ML22269A4372022-09-26026 September 2022 Correction to Issuance of Amendment Related to Surveillance Requirement 4.0.5, Associated Basis, and Bases 3/4.4.2, 3/4.4.6, and 3/4.4.10 ML22269A4342022-09-26026 September 2022 VC Summer Correction Letter to Amendment 166 - Enclosure - ML22115A1042022-04-22022 April 2022 License Amendment Request- Technical Specifications Nozzle Blockage Testing Requirement Change for Reactors Building Spray System ML21319A2622021-12-28028 December 2021 Issuance of Amendment No. 220 to Relocate Unit Staff Qualifications from Technical Specification to Quality Assurance Program Description ML21280A3282021-10-0707 October 2021 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions ML20156A3032020-06-0404 June 2020 License Amendment Request Update of Analytical Method to the Core Operating Limits Report with the Full Spectrum Loss of Coolant Accident Approach ML18253A1152018-10-0505 October 2018 Issuance of Amendment No. 212 Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit ML18092B5102018-03-29029 March 2018 (VCSNS) - Administrative License Amendment Request to Correct the Typographical Error in TS Table 6.2-1 Minimum Shift Crew RC-17-0175, Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error2018-01-31031 January 2018 Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error ML17206A4122017-10-0404 October 2017 Issuance of Amendment TSTF-411, Revision 1, Surveillance Test Interval Extensions for Components of the Reactor Protection System (WCAP-15376-P-A). ML16104A2952016-05-0606 May 2016 Issuance of Amendment to Adopt TSTF-523, Revision 2 ML16063A0902016-03-0909 March 2016 Issuance of Exigent Amendment Regarding Technical Specification 3.7.1.2 ML15208A0292015-10-15015 October 2015 Issuance of Amendment ML15170A0872015-08-18018 August 2015 Issuance of Amendment to Revise the Radiation Emergency Plan ML15063A3552015-04-13013 April 2015 Issuance of Amendment to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6 ML14287A2892015-02-11011 February 2015 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) ML14122A3092014-05-29029 May 2014 Issuance of Amendment 198 Regarding the Cyber Security Plan Implementation Schedule Milestone 8 ML14030A3742014-03-11011 March 2014 Issuance of Amendment for Technical Specification Change Related to Control Room Emergency Filtration System ML13354B6432014-02-0606 February 2014 Issuance of Amendment for the Technical Specification Change Related to Snubber Surveillance Requirements ML13326A2042014-02-0505 February 2014 Issuance of Amendment Extending Integrated Leak Rate Test Interval RC-13-0034, License Amendment Request - LAR (11-02281) Technical Specification Change to Add an Exception to Specification 3.0.4 in Technical Specification 3/4.7.6 Control Room Emergency Filtration System (CREFS)2013-04-0303 April 2013 License Amendment Request - LAR (11-02281) Technical Specification Change to Add an Exception to Specification 3.0.4 in Technical Specification 3/4.7.6 Control Room Emergency Filtration System (CREFS) RC-13-0047, License Amendment Request - LAR 12-03567, Application to Revise Tech Specs to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using Consolidated Line Item Improvement..2013-04-0202 April 2013 License Amendment Request - LAR 12-03567, Application to Revise Tech Specs to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using Consolidated Line Item Improvement.. ML12146A0172012-05-30030 May 2012 Issuance of Amendment on Beacon Core Monitoring and Operations Support System RC-11-0063, License Amendment Request - LAR 11-01774, Application to Eliminate License Condition 2.G.1 Requiring Reporting of Violations of Section 2.C of the Operating License Using the Consolidated Line Item Improvement Process (CLIIP)2011-08-23023 August 2011 License Amendment Request - LAR 11-01774, Application to Eliminate License Condition 2.G.1 Requiring Reporting of Violations of Section 2.C of the Operating License Using the Consolidated Line Item Improvement Process (CLIIP) RC-11-0104, License Amendment Request - LAR (10-03107) Proposed Change in Administrative Controls Section to Allow the Use of Westinghouse WCAP-12472-P-A, Addendum 1-A2011-08-11011 August 2011 License Amendment Request - LAR (10-03107) Proposed Change in Administrative Controls Section to Allow the Use of Westinghouse WCAP-12472-P-A, Addendum 1-A RC-11-0062, V. C. Summer, License Amendment Request - LAR 04-02961, License Amendment Request for Slave Relay Surveillance Testing2011-04-18018 April 2011 V. C. Summer, License Amendment Request - LAR 04-02961, License Amendment Request for Slave Relay Surveillance Testing RC-11-0006, License Amendment Request - LAR-10-03108, Proposed Change to Relocate Administrative Control Requirements Related to Quality Assurance and Submittal of Quality Assurance Program Description (QAPD)2011-03-18018 March 2011 License Amendment Request - LAR-10-03108, Proposed Change to Relocate Administrative Control Requirements Related to Quality Assurance and Submittal of Quality Assurance Program Description (QAPD) RC-10-0092, License Amendment Request (LAR 10-02033), Changes to Emergency Diesel Generator Surveillance Test Requirements2010-11-11011 November 2010 License Amendment Request (LAR 10-02033), Changes to Emergency Diesel Generator Surveillance Test Requirements ML1001103772010-03-22022 March 2010 Issuance of Amendment Regarding: Use of Optimized Zirlo Fuel Rod Cladding RC-08-0007, License Amendment Request - LAR 03-01931-20, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2008-01-17017 January 2008 License Amendment Request - LAR 03-01931-20, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0713705092007-05-15015 May 2007 Technical Specifications, Issuance of Amendment Regarding Steam Generator Tube Integrity RC-06-0199, License Amendment Request - LAR 05-3262, Changes to Emergency Diesel Generator Specification2006-11-21021 November 2006 License Amendment Request - LAR 05-3262, Changes to Emergency Diesel Generator Specification ML0630700682006-11-0202 November 2006 Technical Specifications Pages Re Alternate AC Power Supply ML0630000262006-10-24024 October 2006 Technical Specifications, Implementing Approved Changes in Probabilistic Risk Analysis of the RPS and ESFAS Test Times and Completion Times. ML0627002792006-09-0707 September 2006 V.C. Summer, Tech Spec Pages for Amendment 176 Regarding Best Estimate Loss-of-Coolant Accident Analyses Methodology RC-06-0084, License Amendment Request - LAR 05-3594, Steam Generator Tube Integrity2006-05-24024 May 2006 License Amendment Request - LAR 05-3594, Steam Generator Tube Integrity ML0614204982006-05-0404 May 2006 Technical Specifications, Administrative Controls ML0535300472005-12-13013 December 2005 Enclosure, Amd MC7375, Reactor Coolant System Pressure-Temperature Limits ML0522402792005-08-10010 August 2005 Operating License, License Amendment Request- LAR 04-0440, Emergency Feedwater System Pump Testing Criteria RC-05-0090, License Amendment Request Re Reactor Coolant System - Heatup/Cooldown Curves2005-06-22022 June 2005 License Amendment Request Re Reactor Coolant System - Heatup/Cooldown Curves ML0513902262005-05-0909 May 2005 Enclosure, Amd MC3308, Extending the Inspection Interval for Reactor Coolant Pump Flywheels RC-05-0041, License Amendment Request (LAR 03-1931-24) Adoption of TS Task Force (TSTF) Traveler-287, Revision 5, Ventilation System Envelope Allowed Outage Time2005-03-0909 March 2005 License Amendment Request (LAR 03-1931-24) Adoption of TS Task Force (TSTF) Traveler-287, Revision 5, Ventilation System Envelope Allowed Outage Time ML0410404932004-04-0505 April 2004 Technical Specifications, Revision to Allowed Outage Time for Engineered Safety Features Actuation System Instrumentation ML0334503692003-12-15015 December 2003 Tech Spec Pages for Amendment 165 One-Time Extension of Steam Generator Inspection Interval ML0330400312003-10-29029 October 2003 Technical Specification Pages for Virgil C. Summer Nuclear Station, Unit 1, Amendment No. 165 2024-08-05
[Table view] |