MONTHYEARAEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-52, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2024-30, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 AEP-NRC-2024-19, Annual Report of Property Insurance2024-04-0101 April 2024 Annual Report of Property Insurance AEP-NRC-2024-04, License Amendment Request Regarding a Change to Unit 1 Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System2024-03-0606 March 2024 License Amendment Request Regarding a Change to Unit 1 Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System ML24073A2342024-03-0606 March 2024 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors IR 05000315/20230062024-02-28028 February 2024 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2023006 and 05000316/2023006) 2024-09-09
[Table view] Category:Licensee Event Report (LER)
MONTHYEAR05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage AEP-NRC-2024-52, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak AEP-NRC-2024-30, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip 05000316/LER-2017-0012017-05-19019 May 2017 1 OF 5, LER 17-001-00 for Cook, Unit 2 re Containment Hydrogen Skimmer Ventilation Fan #1 Inoperable Longer than Allowed by Technical Specifications 05000316/LER-2016-0022017-02-0909 February 2017 Emergency Diesel Generators Declared Inoperable Due to a Manufacturing Design Issue, LER 16-002-00 for Donald C. Cook Nuclear Plant Unit 2 Regarding Emergency Diesel Generators Declared Inoperable Due to a Manufacturing Design Issue 05000316/LER-2016-0012016-08-31031 August 2016 Manual Reactor Trip Due To Moisture Separator Heater Expansion Joint Failure, LER 16-001-00 for Donald C. Cook Nuclear Plant, Unit 2 Regarding Manual Reactor Trip Due To Moisture Separator Heater Expansion Joint Failure ML16193A3902016-07-15015 July 2016 Donald C. Cook Nuclear Plant Unit 2 - A Loss of Main Condenser Event Occurred Due to a Storm-Induced Debris Damage of the Circulating Water System Pumps in the Forebay (LER-316-2014-003-00) 05000315/LER-2015-0022016-01-18018 January 2016 -Technical Specification Violation due to Inoperable Residual. Heat Removal Pump, LER 15-002-01 for D.C. Cook, Unit 1, Regarding Technical Specification Violation Due to Inoperable Residual Heat Removal Pump 05000316/LER-2015-0012016-01-15015 January 2016 Manual Reactor Trip Due To A Secondary Plant Transient, LER 15-001-01 for D.C. Cook, Unit 2, Regarding Manual Reactor Trip Due to a Secondary Plant Transient ML0528703602005-10-0505 October 2005 Special Report for D. C. Cook Unit 2 Re Unit 2 Reactor Coolant Inventory Tracking System ML0508903452005-03-22022 March 2005 LER 99-001-01 Donald C. Cook Nuclear Plant Unit 2, Regarding Supplemental LER for Degraded Component Cooling Water Flow to Containment Main Steam Line Penetrations ML0210601432002-04-12012 April 2002 LER 02-02-00, Donald C. Cook Nuclear Plant Unit 2, Technical Specification 3.9.4.c Was Violated During Core Alteration ML0209205342002-03-15015 March 2002 LER 99-012-01 for Cook Nuclear Plant, Unit 1 Re Auxiliary Building ESF Ventilation System May Not Be Capable of Maintaining ESF Room Temperature Post-Accident ML9936300511999-12-20020 December 1999 LER 99-S004-00, Intentionally Falsifying Documentation Results in Unauthorized Unescorted Access, on 11/18/99. with Letter Dated 12/20/99 05000315/LER-1999-027, LER 315/99-027-00, Underrated Fuses Used in 250 Vdc System Could Result in Lack of Protective Coordination1999-11-29029 November 1999 LER 315/99-027-00, Underrated Fuses Used in 250 Vdc System Could Result in Lack of Protective Coordination ML18219E1521978-09-27027 September 1978 Submit Licensee Event Report Nos. RO 78-051/03L-0 & RO 78-052/03L-0 ML18219B5201978-09-27027 September 1978 09/27/1978 Letter Enclosure of Licensee Event Report ML18219B5211978-09-19019 September 1978 09/19/1978 Letter Enclosure of Licensee Event Report ML18219E1531978-09-18018 September 1978 Submit Licensee Event Report No. RO 78-050/03L-0 ML18219B5541978-09-18018 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-062/03L-0) ML18219B5551978-09-12012 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-56/03L-1 and RO 78-061/03L-0) ML18219E1541978-09-12012 September 1978 Submit Licensee Event Report No. RO 78-049/03L-0 ML18219E1551978-09-0808 September 1978 Submit Licensee Event Report No. RO 78-048/03L-0 ML18219B5561978-09-0808 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-059/03L-1 and RO 78-060/03L-0) ML18219B5571978-09-0505 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting License Event Report RO 78-059/03L-0 ML18219B5581978-08-30030 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report RO 78-058/03L-0 ML18219B5621978-08-22022 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-056/03L-0 and RO 78-057/03L-0) ML18219B5611978-08-18018 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-052/03L-0, RO 78-053/03L-0, RO 78-054-03L-0 and RO 78-055/03L-0) ML18219E1561978-08-15015 August 1978 Submit Licensee Event Report No. RO 78-047/03L-0 ML18219E1581978-08-14014 August 1978 Submit Licensee Event Report Nos. RO 78-043/03L-1 & RO 78-044/03L-1 ML18219E1571978-08-14014 August 1978 Submit Licensee Event Report Nos. RO 78-045/03L-0 & RO 78-046/03L-0 ML18219E1601978-08-11011 August 1978 Submit Licensee Event Report Nos. 1978-043-03L & 1978-044-03L ML18219B5641978-08-10010 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-051/03L-0) ML18219B5651978-08-0909 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-049/03L-1) ML18219B5661978-08-0808 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-050/03L-0) ML18219B5671978-08-0404 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-049/03L-0) ML18219B5681978-08-0202 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-029/03L-1 and RO 78-048/03L-0) ML18219B5691978-07-21021 July 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-019/03L-1 and RO 78-023/03L-1) ML18219B5701978-07-18018 July 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-047/03L-0) ML18219B5711978-07-11011 July 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-043/03L-0), Submitted Late Due to a Paper Defect ML18219B5721978-07-11011 July 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-034/03L-1, RO 78-044/03L-0, RO 78-045/03L-0, RO 78-046/03L-0) ML18219B5731978-07-0505 July 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-042/03L-0) ML18219B5751978-06-29029 June 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 50-316/78-037), Stating Corrective Actions Taken IR 05000316/19780371978-06-29029 June 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 50-316/78-037), Stating Corrective Actions Taken ML18219B5771978-06-22022 June 1978 D.C. Cook - Submit Licensee Event Report RO 78-036/03L-0 for Unit 2 ML18219B5761978-06-21021 June 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-035/03L-0), a Resubmittal of LER 78-034/03L-0 Dated 6/19/1978 ML18219B5781978-06-19019 June 1978 D.C. Cook - Submit Licensee Event Report RO 50-316/78-034/03L-0 for Unit 2 IR 05000316/19780341978-06-19019 June 1978 D.C. Cook - Submit Licensee Event Report RO 50-316/78-034/03L-0 for Unit 2 ML18219B5221978-06-0606 June 1978 06/06/1978 Letter Licensee Event Report 2024-09-12
[Table view] |
Text
NRC Dl IBUTION FOR PART 50 DOCKET TERIAL (TFMPORARY FORM)
CONTROL NO:
FILE. INCIDENE REPORT FILE FROM'.iana >c >nga ower DATE OF DOC DATE REC'D LTR TWX RPT OTHER
'ridgman, Michigan R.W. Jurgensen 10-29-75 11-3-75 XXX TO: ORIG CC OTHER SENT AEC PDR SENT LOCAL PDR XXX
..Mr. J. Ke ler CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
DESCR IPTION: ENCLOSURES:
Letter trans the following..... 'bnormal Occurrence 7/ 75-70, on 10-7-75, Concerning unoperable Containment Hydrogen Monitoring System Calibration........
.(3'Copies Received.)
PLANT NAME: Cook 0' FOR ACTION/INFORMATiON SAB 11-7-75 BUTLER (L) SCHWENCER (L) ZIEMANN (L) REGAN (E)
W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L) STOLZ (L) DICKER (E) LEAR (L)
W/ Cooies PARR (L)
,.W/ Copies
"'yKNIEL(L)
, NgCopies VASSALLO (L)
W/ Copies PURPLE'(L)
W/ Copies KNIGHTON (E)
W/ Copies YOUNGELOOO (E)'EXD W/ Copies SPE LS W/~Copies
'Q W/ Copies NOT REM%a%
INTERNAL DISTRIBUTION IL TECH REVIEW DENTON LIC ASST A/T IND.
'4- -'"NRO PD BOSCH,POEDER ~~GR II)IIES R.,DI GGS (L) BRAITh4AN) G OGC, ROOMi P-506A ~IA'CCARY GAMMILL H. GEAR IN (L) SALTZMAtII:=; '-' ~
MELTZ GOSSI CK/STAF F
~PLASE BOYD
'~~ SHAO
KNIGHT PAWLICKI STE LLO KASTNER BALI ARD SPANGLER "
E. GOULBOURNE (L)
P. KREUTZER (E)
'.'.LEE (L)
~ M. RUSHBROOK (L)
PLANS MCDONALb MOORE (L) <<-~HOUSTON ENVIRO, S. REED (E) CHAPMAN.
DEYOUNG (L)
SKOVHOLT (L) "- ~ROSS
"-+~NOVAK MULLER DICKER
~. SERVICE (L)
S. Sl-IEPPARD (L)
DUBE (Ltr),
E. COUPE-
"' GOLLER (L) (Ltr) ~IPPOLITO KNIGHTON M. SLATER (E) PETERSON .
P. COLLINS +TEDESCO YOUNGBLOOD H. SMITH (L) HARTFIELD (2)
,,DENISE J. COLLINS BEGAN S. TEETS (L) ~ KLECKER
'.7~)'ij'REG OPR LAMMAS PROJECT I DR G; WILLIAMS(F) EISENHVT>A(ii i ih" i~ I
'WPII E 8 PiEGION Q) 8ENAROYA V. WILSON (L) 'WIGG INTO' II.') ~~ wc '
...-iPi.e<( IGPC/PE (~) z)IPLLMER HARLESS ..R. INGRAM (L) F. >>ILIrIN<S~n,i.
STEELE M DUNCAN ~
EXTERNAl DISTRIBUTION HA'1 LOCAL PD R~~aseph MIchigan PD R-SAN/LA/NY
~1 TIC (ABERNATHY) (1)t2)(10) NATIONALLABS 1 BROOKHAVEN NAT LAB
~l ASLB NSIC (BUCHANAN) 1 1
W. PENNINGTON, Rm E-201 GT CONSULTANTS 1
1 G. ULRIKSON, ORNL 1
NEWMARK/BLUME/AGBABIAN AGMED (RUTH GUSSMAN)
~-~
1 1 Newton Anderson ACRS SEl;T TO LIC -"SST M. Service Rm B-127 GT-SEND ONLY TEN DAY REPORTS 1 J. D. RUNKLES, Rm E-201 GT
tI
'll
~ c
~1>>',,
~
I F'
A~n y t NDIANA 8 MICHIGANPOWER COMPANY DONALD C. COOK NVCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 ggfjp, October 29, 1975 I
Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement
'United States Nuclear Regulatory Commission Reqion III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58 Docket No. 50-315
Dear Mr. Keppler:
Pursuant to the requirements of Appendix A Technical Specifications and the United States Nuclear Regulatory Commission Regulatory Guide 1.16, Revision 3, Section 2.b, the following Abnormal Occurrence Report is submitted:
g'0q Gji+
AO-50-315/75-70 Regulator Sincerely, yy ~L~I
~ 'lant.t.
p Ju en na r n
Cy
+o~~CP
~0 kg~
f 0+. 4p~C
/bab ~S/
cc: R.S. Hunter J.E. Dolan cj~ p~
G.E. Lien R.J. Vollen BPI R. Kilburn R.C. Callen MPSC K.R. Baker RO: III P.W. Steketee, Esq.
R. Walsh, Esq .
G. Charnoff, Esq.
G. Olson PNSRC R.S. Keith Director, IE (30 copies)
Director, MIPC (3 copies) j.2590
0 Lit t=IVUt=t LVLIVI NLI UHI CONTROL BLOCK: ( 'LSB PRINT ALL REQUIRED INFORs'1ATION)
LICENSEE LICENSE EVENT NAME LICENSE NUMSER TYPE TYPE 7 89 T. DCC 14 oo 15 c 0 OO 25 26 I. h l. I.
30
~Qi.
31 32 REPORT REPORT 05 0O3 i.568 CATEGORY TYPE SOURCE OOCKET
[one coM'v ~PO 7 8 57 58 59 60 69 74 75 80 EVENT DESCRIPTION t00g W AX-LE, 7 89 I HCDF h KV '0 'PE&&. y Pbw& P- 7 ME~kI kdDT7'W4.
80 m 'FAYE.P E'.0 'l (6 odYA TONE. HOQLYo C 80
[oO~]
7 8 9 80 Jog 7 8 9 80 CG 7 8 9 PRME 80 SYSTEM CAUSE COMPONENT COMPONENT COMPONENT CODE SUPPUER MANUFACTURER pope ip 17 43 47 "
48
[oOs]
7 8 9 I B%7ibt4 CAUSE DESCRIPTION FCD p 80
+os] -k~l U -C'(. lr- ~ <ICDL. W k S 7 8 9 uzi'zoic, 0 Qo] Rr-~ 730&~ ~j 4 -QF Q E.SU9P .L-.Qfk~i 7 89 80 METHOO OF OISCOVERY OISCOVERY OESCRIPTION Hl8 F E88~J12 hi% wpie~s A o I 7 9 10 13 44 45 46 80 FORM OF ACTMTY COATENT 7 8 RELEASEO s
ux ~
OF RELEASE 10 11 p
AMOUNT OF ACTIVITY 44 45 LOCATION OF RELEASE 80 PERSONNEL EXPOSURES 7 8 9." '11'2 13 80, PERSONNEL INJURIES
+~
7 89 11 12 80 OFFSITE CONSEQUENCES
'~g QA<
7 89 80 LOSS OR DAMAGE TO FACILITY
'QJ 7 89
~
TYPE 10 OESCRIPTION 80 PUBLICITY Q~~]
7 89 80 ADDITIONAL FACTORS
+18 7 89 80 Q~g gh 7 89 80 PHONE:
GPO dbT e ddT
AO-50-3I5/75 7Q Supplement to CAUSE DESCRIPTION when surve i I I ance has been comp I eted and the reschedu I i ng p rocess for missed survei I lance has been formalized. No further problems 'of this type are expected.