November 22, 2010

Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION - NRC SECURITY INSPECTION REPORT 05000346/2010202

Dear Mr. Allen:

On October 21, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Davis-Besse Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process.

The enclosed inspection report documents the inspection results, which were discussed on October 28, 2010, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agency-wide Documents Access and Management Systems (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosures will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, markEnclosure(s) transmitted herewith contain(s) . When separated from enclosure(s), this transmittal document is decontrolled. your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Should you have any questions concerning this letter, please contact us. Your cooperation is appreciated.

Sincerely,/RA A. Rayland for/

Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No.: 50-346 License No.: NPF-3

Enclosure:

Inspection Report 05000346/2010202 w/

Attachments:

Supplemental Information, Table of Security Personnel, Exercise One, Exercise Two (SAFEGUARDS)

cc w/encl: M. Parker, Manager Site Protection, Davis-Besse Nuclear Power Station cc w/o encl: J. Lash, FirstEnergy Nuclear Operating Company Director, Fleet Regulatory Affairs, FirstEnergy Nuclear Operating Company D. Pace, FirstEnergy Nuclear Operating Company D.W. Jenkins, FirstEnergy Company Public Utilities Commission of Ohio D. Kucinich, United Sates House of Representatives P. Sena, FirstEnergy Nuclear Operating Company Manager, Site Regulatory Compliance, Davis-Besse Nuclear Power Station K. Fili, FirstEnergy Nuclear Operating Company Manager Fleet Licensing, FirstEnergy Nuclear Operating Company R. Owen, Ohio Department of Health President Board of County Commissioners of Lucas County, One Government Center President of Ottawa County Board of Commissioners, Ottawa County Courthouse D. Moul, FirstEnergy Nuclear Operating Company