Category:Emergency Preparedness-Emergency Plan and Post Exercise Evaluation (FEMA Evaluation)
MONTHYEARML18313A0362018-10-23023 October 2018 After Action Report/Improvement Plan for Exercise Conducted on July 31, 2018 ML18313A0352018-10-23023 October 2018 Transmittal of the Final After Action Report for the July 31, 2018, Plume Phase Exercise of the Offsite Radiological Emergency Plans, Site-Specific to the Cooper Nuclear Station ML1027803492010-09-22022 September 2010 FEMA, Submittal of Final Report July 21, 2010, Exercise of the Offsite Radiological Emergency Response Plans Site-Specific to the Cooper Nuclear Station 2018-10-23
[Table view] Category:Emergency Preparedness-FEMA Correspondence to NRC
MONTHYEARML18313A0352018-10-23023 October 2018 Transmittal of the Final After Action Report for the July 31, 2018, Plume Phase Exercise of the Offsite Radiological Emergency Plans, Site-Specific to the Cooper Nuclear Station ML1201704792004-09-21021 September 2004 FEMA Cooper Nuclear Station, Final Exercise Report, Exercise Date - September 21, 2004 2018-10-23
[Table view] Category:Letter
MONTHYEARML24250A2052024-10-0808 October 2024 Issuance of Amendment No. 278 Regarding Revision to Technical Specification Table 3.3.2.1-1 and Transfer of Minimum Critical Power Ratio Values to Core Operating Limit Report ML24227A0822024-09-0303 September 2024 Summary of Regulatory Audit in Support of License Amendment Request to Modify the High Pressure Coolant Injection Low Flow Value IR 05000298/20240052024-08-22022 August 2024 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2024005) IR 05000298/20240022024-07-25025 July 2024 Integrated Inspection Report 05000298/2024002 ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24197A1462024-07-15015 July 2024 NRC Region IV Ltr to Cooper Nuclear Station Re FEMA Level 1 Finding IR 05000298/20243012024-07-12012 July 2024 NRC Examination Report 05000298/2024301 ML24134A1782024-07-0303 July 2024 Issuance of Amendment No. 276 Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil and Starting Air, to Allow for Cleaning, Inspection and Any Needed Repairs During Refuel Outage 33 ML24197A0682024-06-24024 June 2024 FEMA Ltr to Missouri State Emergency Management Agency - Level 1 Finding, 24 June 2024 ML24192A0112024-06-13013 June 2024 2024-06-Post Exam Comments IR 05000298/20244012024-06-0404 June 2024 Security Baseline Inspection Report 05000298/2024401 ML24151A1082024-05-30030 May 2024 NRC Initial Operator Licensing Examination Approval 05000298/2024301 ML24137A0942024-05-17017 May 2024 Regulatory Audit Plan in Support of License Amendment Request to Modify Allowable Value Regarding Technical Specification for High Pressure Coolant Injection Pump Discharge Low Flow IR 05000298/20240012024-05-0303 May 2024 Integrated Inspection Report 05000298/2024001 ML24129A0952024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000298/20240102024-04-24024 April 2024 Comprehensive Engineering Team Inspection Report 05000298/2024010 ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML24093A2282024-04-0202 April 2024 Notice of Enforcement Discretion for Cooper Nuclear Station IR 05000298/20240902024-04-0101 April 2024 – Notice of Violation, NRC Inspection Report 05000298/2024090 IR 05000298/20230062024-02-28028 February 2024 Annual Assessment Letter for Cooper Nuclear Station - Report 05000298/2023006 IR 05000298/20230042024-02-12012 February 2024 Integrated Inspection Report 05000298/2023004 IR 05000298/20230122024-02-12012 February 2024 NRC Inspection Report 05000298/2023012 ML24033A3092024-02-12012 February 2024 Summary of Regulatory Audit Regarding the Relief Request RC3-02 Regarding Drywell Head Bolting ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23311A1122023-11-0909 November 2023 Project Manager Assignment ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23102A0282023-04-19019 April 2023 U.S. Nuclear Regulatory Commission Presentation at the May 8, 2023, Brownville Village Meeting IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 ML23041A1622023-02-10010 February 2023 Licensed Operator Positive Fitness-for-Duty Test Request for Additional Information IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 IR 05000298/20220112022-12-23023 December 2022 License Renewal Phase 4 Inspection Report 05000298/2022011 ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements IR 05000298/20220032022-10-27027 October 2022 Integrated Inspection Report 05000298/2022003 ML22304A0052022-10-26026 October 2022 Surveillance Capsule Location (Re-insertion Into the Reactor Vessel) IR 05000298/20223022022-10-20020 October 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022302 2024-09-03
[Table view] |
Text
U.S. Department of Homeland Security FEMA Region VII .
11224 Holmes Road Kansas City, MO 64131 FEMA October 23, 2018 Mr. Kriss Kennedy Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511
Dear Mr. Kennedy:
Enclosed is a copy of the Final After Action Report for the July 31, 2018, Plume Phase exercise of.
the offsite radiological emergency response plans, site-specific to the Cooper Nuclear Station. The participants in this exercise included numerous organizations from the States of Nebraska and
Region VII staff. Copies of the final report will be provided to the States of Nebraska and Missouri.
Then; were no Level I Findings identified during this exercise. There was one Level 2 Finding and two Planning Issues identified in Nebraska. No issues were identified in Missouri. The Level 2 Finding and the two Planning Issues have been subsequently corrected and are now closed.
- Based on the results of this exercise, the offsite radiological emergency response plans and preparedness for the States of Missouri and Nebraska and the affected local jurisdictions, site-specific to the Cooper Nuclear Station, can be implemented and are adequate to provide reasonable assurance that appropriate measures can be taken offsite to protect the health and safety of the public in the event of a radiological emergency at the site. Therefore, the Title 44 CFR, Part 350 approval of the offsite radiological emergency response plans and preparedness for the States o£Missouri and J\fob!aska, site-:specific to the Cooper Nuclear Station, granted on May 26, 1983, will remain in effect.
If you have any questions or concerns regarding the report, please contact Mr. Tom Morgan, Regional Assistance Committee Chair, at (816) 808-2756 or by email
. Thomas,Morgan5@fema.dhs.gov.
Sincerely, .*. .
pALJ L J I; Digitally signed by
. j\PAULJTAYLOR l-** Dat~:)018.10.31 TAYLOB d 14:13:45 -05'00' Paul Tayfor Regional Administrator www.fema.gov
Enclosure
- .cc: Document Conttbl'Desk, NRC HQ<
Robert Lewis, N~C NSJR:
Vanessa Quinn/F.EMA:J-I;Q REP Kerri~ Bates;'FEM.A HQ1~,EP *
Jun Stcmgh, NP.PD ,*. : ..
. *. . ." .\ '
- '~-- \',. .,' ;~ /
www.fema.gov