RA-19-0378, Nuclear Regulatory Commission (NRC) Annual Commitment Change Report
ML19282A770 | |
Person / Time | |
---|---|
Site: | McGuire, Mcguire |
Issue date: | 09/19/2019 |
From: | Teresa Ray Duke Energy Carolinas |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RA-19-0378 | |
Download: ML19282A770 (2) | |
Category:Letter type:RA
MONTHYEARRA-24-0185, Snubber Program Plan - Snubber Program Plan Revision, AD-EG-MNS-16182024-08-28028 August 2024
[Table view]Snubber Program Plan - Snubber Program Plan Revision, AD-EG-MNS-1618 RA-24-0193, Supplement to Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)2024-08-28028 August 2024 Supplement to Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) RA-24-0137, Relief Requests for Inservice Testing Plan – Fifth Interval2024-07-0101 July 2024 Relief Requests for Inservice Testing Plan – Fifth Interval RA-24-0030, Duke Energy - Annual Radioactive Effluent Release Report - 20232024-04-29029 April 2024 Duke Energy - Annual Radioactive Effluent Release Report - 2023 RA-24-0083, Annual Report of Changes Pursuant to 10 CFR 50.462024-04-25025 April 2024 Annual Report of Changes Pursuant to 10 CFR 50.46 RA-24-0031, Annual Radiological Environmental Operating Report - 20232024-04-23023 April 2024 Annual Radiological Environmental Operating Report - 2023 RA-24-0094, Request for Approval of Duke Energy Corporation Transition to ANSI/ANS3.1-2014, American National Standard for Selection and Training of Nuclear Power Plant Personnel and Revision 4 of Regulatory Guide 1.8, Rev. 4 Qualification and Traini2024-04-17017 April 2024 Request for Approval of Duke Energy Corporation Transition to ANSI/ANS3.1-2014, American National Standard for Selection and Training of Nuclear Power Plant Personnel and Revision 4 of Regulatory Guide 1.8, Rev. 4 Qualification and Training RA-24-0101, (Mns), Units 1 and 2, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency2024-04-16016 April 2024 (Mns), Units 1 and 2, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations RA-24-0085, Onsite Property Insurance Coverage2024-04-0101 April 2024 Onsite Property Insurance Coverage RA-24-0086, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-04-0101 April 2024 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-24-0067, Independent Spent Fuel Storage Installation (ISFSI)2024-02-29029 February 2024 Independent Spent Fuel Storage Installation (ISFSI) RA-24-0004, End of Cycle 29 (M1R29) Inservice Inspection Summary Report2024-02-21021 February 2024 End of Cycle 29 (M1R29) Inservice Inspection Summary Report RA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)2024-01-10010 January 2024 Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-23-0295, Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval2024-01-0404 January 2024 Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2023-11-0202 November 2023 Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0127, 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record2023-06-28028 June 2023 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations RA-23-0118, Cycle 29, Revision 1, Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 29, Revision 1, Core Operating Limits Report (COLR) RA-23-0117, Report of Changes to Duke Energy McGuire Emergency Plan Annex2023-05-0101 May 2023 Report of Changes to Duke Energy McGuire Emergency Plan Annex RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.462023-04-26026 April 2023 Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 20222023-04-26026 April 2023 Duke Energy Annual Radiological Environmental Operating Report - 2022 RA-23-0046, Annual Radioactive Effluent Release Report - 20222023-04-24024 April 2023 Annual Radioactive Effluent Release Report - 2022 RA-23-0037, Duke Energy - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis)2023-03-30030 March 2023 Duke Energy - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis) RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2023-03-30030 March 2023 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-23-0040, Onsite Property Insurance Coverage2023-03-30030 March 2023 Onsite Property Insurance Coverage RA-23-0036, Biennial Decommissioning Financial Assurance Reports2023-03-30030 March 2023 Biennial Decommissioning Financial Assurance Reports RA-23-0076, Supplement to Response to Request for Additional Information (RAI) Regarding McGuire Nuclear Station Unit 1 Spring, 2022 Outage Steam Generator Tube Inspection Report2023-03-16016 March 2023 Supplement to Response to Request for Additional Information (RAI) Regarding McGuire Nuclear Station Unit 1 Spring, 2022 Outage Steam Generator Tube Inspection Report RA-23-0024, Response to Request for Additional Information (RAI) for Relief Request for RPV Reactor Coolant System Welds2023-02-28028 February 2023 Response to Request for Additional Information (RAI) for Relief Request for RPV Reactor Coolant System Welds RA-23-0065, Report of Changes to McGuire EAL Technical Basis Document2023-02-23023 February 2023 Report of Changes to McGuire EAL Technical Basis Document RA-18-0090, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-02-17017 February 2023 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-02-17017 February 2023 Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-18-0190, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-02-16016 February 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-23-0025, End of Cycle 28 (M1R28) Steam Generator Tube Inspection Report Response to Request for Additional Information (RAI)2023-02-15015 February 2023 End of Cycle 28 (M1R28) Steam Generator Tube Inspection Report Response to Request for Additional Information (RAI) RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI2023-02-0202 February 2023 Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-22-0256, Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-01-23023 January 2023 Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab2022-12-0505 December 2022 Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab RA-22-0312, Report of Changes to McGuire Emergency Plan Annex2022-10-26026 October 2022 Report of Changes to McGuire Emergency Plan Annex RA-22-0303, End of Cycle 28 (M1 R28) Steam Generator Tube Inspection Report2022-10-25025 October 2022 End of Cycle 28 (M1 R28) Steam Generator Tube Inspection Report 2024-08-28 |
Text
Thomas D. Ray, P.E.
Site Vice President J_-,DUKE McGuire Nuclear Station
~ ENERGY Duke Energy MG01VP I 12700 Hagers Ferry Road Huntersville, NC 28078 o: 980.875.4805 f: 980.875.4809 Tom .Ray@duke-energy.com RA-19-0378 September 19, 2019 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Duke Energy Carolinas, LLC (Duke Energy)
McGuire Nuclear Station Docket No. 50-369, 50-370 Renewed License No. NPF-9 and NPF-17 Nuclear Regulatory Commission (NRC) Annual Commitment Change Report This letter serves to document that during the 2018 calendar year, McGuire did not make any NRC commitment changes requiring NRC notification per the guidance defined in NEI 99-04, "Guidelines for Managing NRC Commitments."
Questions regarding this submittal should be directed to Jeff Thomas at (980) 875-4499.
Thomas D, Ray, P.E.
Site Vice President McGuire Nuclear Station www.duke-energy .com
U.S. Nuclear Regulatory Commission Document Control Desk Serial: RA-19-0378 Page 2 cc:
Laura A. Dudes, Regional Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257 Andy Hutto, Senior Resident Inspector U.S. Nuclear Regulatory Commission McGuire Nuclear Station Michael Mahoney, Project Manager U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mailstop 0-881A Rockville, MD 20852 www.duke-energy .com