LER 80-027/03L-0:on 800729,during Steady State Power Operation,Leak from Failed Socket Weld Found on Fitting in 1-inch Safety Injection Tank Recirculation Line.Caused by Crack Due to long-term Fatigue Attributed to Vibration
ML19344E575
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/25/1980
From: Harris J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19344E574 List:
References
LER-80-027-03L, LER-80-27-3L, NUDOCS 8009020285
Download: ML19344E575 (2)


Text

l U. S. NUCLE AR ret.,ULATORY COMMISSION l NHC>QRf.1366%

7 77)

LICENSEE EVENT REPORT

( ,) CONTROL BLOCK: l l l l l l l 6

(PLE ASE PRINT OR TYPE ALL REQUIREO IN*ORMATIONI 1

o lij l Cl Tl M l N l S i 2 l@l 0l 0l -l C l 0l 0] 0 l - l 0 l 0 l 250 ]@l 26 4lLICENSE 1l 1l TYPE1l 1[@l40 l

SF CAT 58 lg i 8 9 LICENSEE CCDE 14 15 LICENSE NuYSER CCN'T olil T,y l L @l 0 l 5 l 0 l 0 l0 l3 l3 16 }@l 0 l 7 l C l 9 l 8 l 074 l@l75 018l

, 2l 5 l 8 l 080l@

REpoR f QATE F 8 60 61 DOCKET NUM9ER tia 69 Evt1T DATE EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES h l o l 21 l During steady state power operation, a leak was evident within the containment. A l "

lo t a l I containment entry disclosed a failed socket weld on a fitting in a 1 inch safety i I o !41 l injection tank recirculation line. The leak was isolated and the weld was ground out l l o 13 l l and rewelded. Similar events: 77-10 (3/21/77); 77-37 (9/17/77) [

1 lo is i l I

1o171 1 l

l 0 l8 l l 30 7 8 9 DE CCCE SLBC E CCMPCNENT CODE SL B CO O'E S E l0l9l 7 8 l Cl Bl@ lE l@ l Xl@ lP lIlP lE lX lX l@ W@ lZ l@

9 10 11 12 i3 18 19 20 SEQU ENTI AL OCCURRENCE REPORT REvlSION EVENTvEAR rdPCRT NO. CODE TYPE N C.

LE R. RO OyaEg l218 l0 l l-l l0l2l7l l/l l 0l 3 l lL l l_l l 0l 32

.,, 22 23 24 26 27 28 29 30 31 T KEN AC C ONP NT M T HOURS 22 58 i PC E. SUPPLiE MANLP CTURER lBl@lXI@

n .

IZl@

25 l Zl@

2.

1010101 2r 0 l [J.

_j @ ln Y l@ lN]@

4, lBl1l310l@

u .,

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h 1i i o l l The cause of the leak was a crack caused by long term fatigue attributed to vibration. l ii iii i The long term corrective action for this recirculation line will be a stress I i,i2i l evaluation and hanger rework (if reauired) during the refueling outage. I I

lii al I I

it 14i l

  1. 'cglJ7 sTA  % PCWER OTHE R STATUS dis RY QlSCOVERY CESCRIPTION Ii l51 d@ l 1 l 0 l 0 l@l" NA l lAl@l Ooerator observation l

'2TiviTY 4 Cc'OrtNT aELEASE toc 2 Tion oP RELEASE @

l i l 6 l l Zl @o cP aELEASE[_Z_jgl AuovNT NA cr ACriviTv l @l NA l

PER$cNNEt ExPcSEEES NuveEn TvPe oESCRiPrioN@

l 2 7 1010lOl@lZl@l NA PERSONNEL INJV IES NUveER OESCR PTION l

li js t I 01 01 01 @ l NA 80 7 8 9 11 12

' 'S T PE

" ESCR

'" ^ o'N

  • T '''@ NA l li 191 7 8 9 l Zl@l to 30

'SSUED QE CRl* TION  %

o N 44 _

NA l

LIIIIIIIIII'I '"

7 4,00 85 on t ,1,1, 7,7 7ql o i

ATTACHMENT LER 80-27/3L-0 Millstone Unit 2 Docket No. 50-336 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES During steady state power operation, a leak was evident within the containment due to the frequency of pumping the contaiment sump and a slow decrease in Safety Injection Tank (SIT) Number 1 level. A containment entry disclosed a failed socket weld on a fitting in a 1 inch recirculation line. The leak was isolated and the weld was ground out and rewelded.

Similar events: 77-10 dated 3/21/77; 77-37 dated 9/16/77 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS The cause of the leak was a crack caused by long term fatigue s

attributed to vibration. The leak path was via SIT Number 1 through a leaking drain valve 2-SI-618 caused by a controller malfunction.

The fuses to 2-SI-618 were pulled to fail the valve closed. The valve is a Fisher Type 667-DBQ 1 inch diaphragm control valve rated 1500 PSI. The valve controller will be repaired during the refueling outage.

The long tenn corrective action for the recirculation line cracking will be a stress evaluation of this line and hanger rework (if required) during the refueling outage. The piping is Schedule 40S, Type 304 Stainless Steel,' ASME Class 2.