Text
. . . .
O 1
. \
l VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH April YEAR 1981 (Revised 6-5-81)
APPROVED:
l "Wv 3TATION MA:tAGER 810702 030D m - w -
e e w.. - + .p r--,r,- ,-----n,-,--,9w-w..,, ,~w--w e--v n ev wn-,--me.--n-m-- ,, -.---w ,--,r,- ,er-, --- - ,e-, -,re + ~
OPERATING DATA REPORT DOCKET NO. so-lan DATE c m-o1 COMPLETED BY L L- "GERS TELEPHONE (7n1) 99a-5151 X2510 OPERATING STATUS Notes
- 1. Unit Name: North Anna 1
- 2. Reporting Period:
April 1981 (Revised)
- 3. Licensed Thermal Power (MWt); 2775 _
- 4. Nameplate Rat.ing (Gross MWe): 947
- 5. Design Electrical Rating (Net MWe): 907 898
- 6. Maximum Dependable Capacity (Gross MWe);
850
- 7. Maxirrum Dependable Capacity (Net 5 We);
- 8. If Changes Gecur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reawns:
N/A
- 9. Power Level To Which Restricted,if Any (Net MWe): b/A
- 10. Reasons For Restrictions. If Any: N/A 4
This Month Yr.-to.Date Cumu'.atne
- 11. Hours in Leporting Period 719 2.879 25 440 589.6 589.6 18,562.7
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdt,wn Hours 2.2 2.2 215.3 499.6 499.6 18,147.7
- 14. Hours Generator On.Line
- 45. Unit Reserve Shutdown Hours 0 0 0 1,108,009 1,108,008 46,276,711
- 16. Gross Thermal Energy Generated (MWH) 362,965, 362,965 14,697,877 1 17. Gross Electrical Energy Generated (MWH) 340,146 340,146 13,825,149 i 18. Net Electrical Energy Generated (MWH) 69.5 17.4 71.3
! 19. Unit Service Factor 69.5 37.4 71.3
( 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 55.7 13.9 63.9 l
52.2 13.0 59.9 l 22. Unit Capacity Factor (Using DER Net) 1.4 1.4 5.9
! 23. Unit Forced Outage Rate
! 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:
l
~
N/A _
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
l 26. Units In Test States (Prior to Commercial Operation): Forecast Achie <ed
~
l INITIAL CRITICALITY l INITIAL ELECTRICITY _
COMMERCIAL OPERATION
- l l 14/77i l