O VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH March YEAR 1981 (Revised 6-5-81)

I APPROVED:

i

/

_s d'T y 5TATION MANAGER

[)

8107 0 2 0 NT

OPERATINC DATA REIORT DOCKET NO. 50-338 DATE 6-5-81 COMPLETED BY L.L_

PDGERS TELEPHONE (703) 99'-5151 X2510 OPERATING STATUS Notes

1. Unit Name:

North Anna 1 March 1961 (Revised)

2. Reporting Period:

2775

3. Licensed Thermal Power (MWt):

947

4. Nameplate RatMg (Gross MWe):

907

5. Design Electrical Rating (Net MWe):

898

6. Maximum Dependable Capacity (Gross MWe):

850

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To which Restricted,If Any (Net MWe):

N/A

10. Reasons For Restrictions,If Any:

N/A This Month Yr.-to.Date Cumulative 744 2,160 24,721

11. Hours in Reporting Period 0

0 17,973.1___

12. Number Of Hours Reactor Was Critical 0

0 213.1

13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 0

0 17,648.1

15. Unit Reserve Shutdown Hours 0

0 o

0 0

45,168,703

16. Gross Thermal Energy Generated (MWH) 0 0

14,334,912

17. Gross Electncal Energy Generated (MWH) 0 0

13,485,003

18. Net Electncal Energy Generated (MWH)
19. Unit Service Factor 0

0 71.4 0

0 71.4

20. Unit Availability 1 actor 0

0 64.2

21. Unit Capacity Factor (Using MDC Net) 0 0

60.1

22. Unit Capacity Factor (Using DER Net) 0 0

5.9

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Eacht:

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

April 7, 1981

26. Units Ir est Status (Prior to Commercial Operation):

Forecast Achieved I

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (0/77 )

__ _