O VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH March YEAR 1981 (Revised 6-5-81)
I APPROVED:
i
/
_s d'T y 5TATION MANAGER
[)
- 8107 0 2 0 NT
OPERATINC DATA REIORT DOCKET NO. 50-338 DATE 6-5-81 COMPLETED BY L.L_
PDGERS TELEPHONE (703) 99'-5151 X2510 OPERATING STATUS Notes
- 1. Unit Name:
North Anna 1 March 1961 (Revised)
- 2. Reporting Period:
2775
- 3. Licensed Thermal Power (MWt):
947
- 4. Nameplate RatMg (Gross MWe):
907
- 5. Design Electrical Rating (Net MWe):
898
- 6. Maximum Dependable Capacity (Gross MWe):
850
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To which Restricted,If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,If Any:
N/A This Month Yr.-to.Date Cumulative 744 2,160 24,721
- 11. Hours in Reporting Period 0
0 17,973.1___
- 12. Number Of Hours Reactor Was Critical 0
0 213.1
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 0
0 17,648.1
- 15. Unit Reserve Shutdown Hours 0
0 o
0 0
45,168,703
- 16. Gross Thermal Energy Generated (MWH) 0 0
14,334,912
- 17. Gross Electncal Energy Generated (MWH) 0 0
13,485,003
- 18. Net Electncal Energy Generated (MWH)
- 19. Unit Service Factor 0
0 71.4 0
0 71.4
- 20. Unit Availability 1 actor 0
0 64.2
- 21. Unit Capacity Factor (Using MDC Net) 0 0
60.1
- 22. Unit Capacity Factor (Using DER Net) 0 0
5.9
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Eacht:
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
April 7, 1981
- 26. Units Ir est Status (Prior to Commercial Operation):
Forecast Achieved I
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (0/77 )
__ _