Revised Page to Monthly Operating Rept for Nov 1980
ML20008G068
Person / Time
Site: North Anna 
Issue date: 06/05/1981
From: Rogers L
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20008G066 List:
References
NUDOCS 8107020150
Download: ML20008G068 (2)


Text

.-

v VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH November YEAR 1980 (Revised 6-5-81) t APPROVED:

l

~p #

STATION MANAGER V

l 8107020 150

~- ----

OPERATING DATA REPORT DOCKET NO. 50-338 DATE 6-5-81 COMPLETED BY T.

T.-

RocrRS TELEPHONE (703; R44-R151 x2510 OPERATING STATUS North Anna Unit 1 Notes

1. Unit Name:

November 1980 (Revised)

Line 16 yr-to-date and

2. Reporting Period:

2775 cumulative have been adjusted

3. Licensed Thennal Power (MWt):

947 f r Burnup over estimation

4. Nameplate Rating (Gross MWe):

907 during October.

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted,If Any (Net MWe):

N/A

10. Reasons For Restrictions,if Any:

N/A This Month Yr.-to-Date Cumulative 720 8 040 21,817

11. Hours in Reporting Period
12. Number Of Hours Reactor Wu Critica!

720 7,155.6 17,320.8 0

64.3 213.1

13. Reactor Reserve Shutdown Hours 720 6,943.2 16,996.4
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours 0

0 0

1,793,316 17,346,043 43,962,517

16. Gross Tha J Energy Generated (MWH) 582,355 5,585,018 13,931,367
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH) 549,449 S,256.749 13,110.195
19. Unit Service Factor 100 86.4 77.9
20. Unit Availabi!ity Factor 100 86.4 77.9
21. Unit Capacity Factor (Using MDC Net) 89.8 76.9 70.7 84.1 72.1 66.3
22. Unit Capacity Factor (Using DER Net) 0 7.5 6.1
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:

Refuelipe TMI and Fire Protection Modifications; December 31, 1980; 6 weeks Maintenance; May 1, 1981; 10 days

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY l

INITIA L ELECTRICITY COMMERCIAL OPERATION W/77 )