v VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH November YEAR 1980 (Revised 6-5-81) t APPROVED:
l
~p #
STATION MANAGER V
l 8107020 150
~- ----
OPERATING DATA REPORT DOCKET NO. 50-338 DATE 6-5-81 COMPLETED BY T.
T.-
RocrRS TELEPHONE (703; R44-R151 x2510 OPERATING STATUS North Anna Unit 1 Notes
- 1. Unit Name:
November 1980 (Revised)
Line 16 yr-to-date and
- 2. Reporting Period:
2775 cumulative have been adjusted
- 3. Licensed Thennal Power (MWt):
947 f r Burnup over estimation
- 4. Nameplate Rating (Gross MWe):
907 during October.
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted,If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,if Any:
N/A This Month Yr.-to-Date Cumulative 720 8 040 21,817
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Wu Critica!
720 7,155.6 17,320.8 0
64.3 213.1
- 13. Reactor Reserve Shutdown Hours 720 6,943.2 16,996.4
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours 0
0 0
1,793,316 17,346,043 43,962,517
- 16. Gross Tha J Energy Generated (MWH) 582,355 5,585,018 13,931,367
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH) 549,449 S,256.749 13,110.195
- 19. Unit Service Factor 100 86.4 77.9
- 20. Unit Availabi!ity Factor 100 86.4 77.9
- 21. Unit Capacity Factor (Using MDC Net) 89.8 76.9 70.7 84.1 72.1 66.3
- 22. Unit Capacity Factor (Using DER Net) 0 7.5 6.1
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:
Refuelipe TMI and Fire Protection Modifications; December 31, 1980; 6 weeks Maintenance; May 1, 1981; 10 days
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY l
INITIA L ELECTRICITY COMMERCIAL OPERATION W/77 )
i