O VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH January YEAR 1981 (Revised 6-5-81) l l

\

APPROVED:

i i

s hkf je ta/

STATION MANAGER (,

I i

i 81070201%\:

l . - _ . _ - . - - _ . _ . _ _ _ . _ _ . _ _ _ _ , _ _ _ _ _ _ , ,

OPERATING DATA REPORT DOCKET NO. 50-338 DATE 6-5-81 COMPLETED BY L.L. ROGERS TELEPHONE (7031 994-5151 X2510 OPE'tATING STATUS North Anna 1 Notes

1. Unit Name:

January 1981 (Revised)

2. Reporting Period: *
3. Licensed Thermal Power (MWt): 2775
4. Nameplate Rating (Gross MWe): 947
5. Design Electrial Rating (Net MWe): 907
6. Maximum Dependab!e Capacity (Gross MWe): 898
7. Maximum Dependable Capacity (Net MWe): 850
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report. Give Reasons:

Change is due to data review of past operating record.

9. Power Level Tc Which Restricted,if Any (Net MWe): N/A
10. Reasons For Restrictions,if Any: N/A This Month Yr to.Date Cumulative
11. Hours in Reporting Period 744 744 23,305 0 0 17,973.1
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0 0 __ 213.1
14. Hours Generatcr On.Line 0 0 17,648.1
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 0 45,168,703 0,_, 0 14,334,912
17. Gross Electrial Energy Generated (MWH) 0 0 13,485,003 18.* Net Electrical Energy Generated (MWH)
19. Unit Service Factor 0 0 75.7
20. Unit Availability Factor 0 0 75 7
21. Unit Capacity Factor (Using MDC Net) 0 0 68.1
22. Unit Capacity Factor (Using DER Net) _.

0 0 63.8

23. Unit Forced Outage Rate 0 0 5.9
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup: March 5. 1981
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY .

INITIA L ELECTRICITY COMMERCIAL OPERATION (4/771