ML20008G079
| ML20008G079 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 06/05/1981 |
| From: | Rogers L VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | |
| Shared Package | |
| ML20008G066 | List: |
| References | |
| NUDOCS 8107020191 | |
| Download: ML20008G079 (2) | |
Text
-
O VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH January YEAR 1981 (Revised 6-5-81) l l
\\
APPROVED:
i i
s hkf je ta/
STATION MANAGER
(,
I i
i 81070201%\\:
l
OPERATING DATA REPORT 50-338 DOCKET NO.
DATE 6-5-81 COMPLETED BY L.L.
ROGERS TELEPHONE (7031 994-5151 X2510 OPE'tATING STATUS North Anna 1 Notes
- 1. Unit Name:
January 1981 (Revised)
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
2775
- 4. Nameplate Rating (Gross MWe):
947 907
- 5. Design Electrial Rating (Net MWe):
898
- 6. Maximum Dependab!e Capacity (Gross MWe):
850
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report. Give Reasons:
Change is due to data review of past operating record.
- 9. Power Level Tc Which Restricted,if Any (Net MWe):
N/A
- 10. Reasons For Restrictions,if Any:
N/A This Month Yr to.Date Cumulative 744 744 23,305
- 11. Hours in Reporting Period 0
0 17,973.1
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0
0 __
213.1 0
0 17,648.1
- 14. Hours Generatcr On.Line
- 15. Unit Reserve Shutdown Hours 0
0 0
0 0
45,168,703
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrial Energy Generated (MWH) 0,_,
0 14,334,912 0
0 13,485,003 18.* Net Electrical Energy Generated (MWH) 0 0
75.7
- 19. Unit Service Factor 0
0 75 7
- 20. Unit Availability Factor 0
0 68.1
- 21. Unit Capacity Factor (Using MDC Net) 0 0
63.8
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0
0 5.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
March 5.
1981
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION (4/771