Text

-

O VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH January YEAR 1981 (Revised 6-5-81) l l

\\

APPROVED:

i i

s hkf je ta/

STATION MANAGER

(,

I i

i 81070201%\\:

l

OPERATING DATA REPORT 50-338 DOCKET NO.

DATE 6-5-81 COMPLETED BY L.L.

ROGERS TELEPHONE (7031 994-5151 X2510 OPE'tATING STATUS North Anna 1 Notes

1. Unit Name:

January 1981 (Revised)

2. Reporting Period:
3. Licensed Thermal Power (MWt):

2775

4. Nameplate Rating (Gross MWe):

947 907

5. Design Electrial Rating (Net MWe):

898

6. Maximum Dependab!e Capacity (Gross MWe):

850

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report. Give Reasons:

Change is due to data review of past operating record.

9. Power Level Tc Which Restricted,if Any (Net MWe):

N/A

10. Reasons For Restrictions,if Any:

N/A This Month Yr to.Date Cumulative 744 744 23,305

11. Hours in Reporting Period 0

0 17,973.1

12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0

0 __

213.1 0

0 17,648.1

14. Hours Generatcr On.Line
15. Unit Reserve Shutdown Hours 0

0 0

0 0

45,168,703

16. Gross Thermal Energy Generated (MWH)
17. Gross Electrial Energy Generated (MWH) 0,_,

0 14,334,912 0

0 13,485,003 18.* Net Electrical Energy Generated (MWH) 0 0

75.7

19. Unit Service Factor 0

0 75 7

20. Unit Availability Factor 0

0 68.1

21. Unit Capacity Factor (Using MDC Net) 0 0

63.8

22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0

0 5.9

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

March 5.

1981

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION (4/771