O 1
\\
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH April YEAR 1981 (Revised 6-5-81)
APPROVED:
l "W
3TATION MA:tAGER v
810702 030D m -
w e e w..
- +
.p r--,r,-
,-----n,-,--,9w-w..,,
,~w--w e--v n ev wn-,--me.--n-m--
-.---w
,--,r,-
,er-,
,e-,
-,re + ~
OPERATING DATA REPORT DOCKET NO.
so-lan DATE c m-o1 COMPLETED BY L L-
"GERS TELEPHONE (7n1) 99a-5151 X2510 OPERATING STATUS Notes
- 1. Unit Name:
North Anna 1
- 2. Reporting Period:
April 1981 (Revised) 2775
- 3. Licensed Thermal Power (MWt);
947
- 4. Nameplate Rat.ing (Gross MWe):
907
- 5. Design Electrical Rating (Net MWe):
898
- 6. Maximum Dependable Capacity (Gross MWe);
850
- 7. Maxirrum Dependable Capacity (Net 5 We);
- 8. If Changes Gecur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reawns:
N/A
- 9. Power Level To Which Restricted,if Any (Net MWe):
b/A N/A
- 10. Reasons For Restrictions. If Any:
4 This Month Yr.-to.Date Cumu'.atne 719 2.879 25 440
- 11. Hours in Leporting Period
- 12. Number Of Hours Reactor Was Critical 589.6 589.6 18,562.7 2.2 2.2 215.3
- 13. Reactor Reserve Shutdt,wn Hours 499.6 499.6 18,147.7
- 14. Hours Generator On.Line 0
0 0
- 45. Unit Reserve Shutdown Hours 1,108,009 1,108,008 46,276,711
- 16. Gross Thermal Energy Generated (MWH) 1
- 17. Gross Electrical Energy Generated (MWH) 362,965, 362,965 14,697,877 340,146 340,146 13,825,149
- 18. Net Electrical Energy Generated (MWH) i 69.5 17.4 71.3
- 19. Unit Service Factor 69.5 37.4 71.3
(
- 20. Unit Availability Factor 55.7 13.9 63.9 l
- 21. Unit Capacity Factor (Using MDC Net) 52.2 13.0 59.9 l
- 22. Unit Capacity Factor (Using DER Net) 1.4 1.4 5.9
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:
l
~
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
l
- 26. Units In Test States (Prior to Commercial Operation):
Forecast Achie <ed
~
l INITIAL CRITICALITY l
INITIAL ELECTRICITY COMMERCIAL OPERATION l
l 14/77i l