Revised Page to Monthly Operating Rept for Apr 1981
ML20008G086
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/05/1981
From: Rogers L
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20008G066 List:
References
NUDOCS 8107020203
Download: ML20008G086 (2)


Text

. . . .

O 1

. \

l VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH April YEAR 1981 (Revised 6-5-81)

APPROVED:

l "Wv 3TATION MA:tAGER 810702 030D m - w -

e e w.. - + .p r--,r,- ,-----n,-,--,9w-w..,, ,~w--w e--v n ev wn-,--me.--n-m-- ,, -.---w ,--,r,- ,er-, --- - ,e-, -,re + ~

OPERATING DATA REPORT DOCKET NO. so-lan DATE c m-o1 COMPLETED BY L L- "GERS TELEPHONE (7n1) 99a-5151 X2510 OPERATING STATUS Notes

1. Unit Name: North Anna 1
2. Reporting Period:

April 1981 (Revised)

3. Licensed Thermal Power (MWt); 2775 _
4. Nameplate Rat.ing (Gross MWe): 947
5. Design Electrical Rating (Net MWe): 907 898
6. Maximum Dependable Capacity (Gross MWe);

850

7. Maxirrum Dependable Capacity (Net 5 We);
8. If Changes Gecur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reawns:

N/A

9. Power Level To Which Restricted,if Any (Net MWe): b/A
10. Reasons For Restrictions. If Any: N/A 4

This Month Yr.-to.Date Cumu'.atne

11. Hours in Leporting Period 719 2.879 25 440 589.6 589.6 18,562.7
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdt,wn Hours 2.2 2.2 215.3 499.6 499.6 18,147.7
14. Hours Generator On.Line
45. Unit Reserve Shutdown Hours 0 0 0 1,108,009 1,108,008 46,276,711
16. Gross Thermal Energy Generated (MWH) 362,965, 362,965 14,697,877 1 17. Gross Electrical Energy Generated (MWH) 340,146 340,146 13,825,149 i 18. Net Electrical Energy Generated (MWH) 69.5 17.4 71.3

! 19. Unit Service Factor 69.5 37.4 71.3

( 20. Unit Availability Factor

21. Unit Capacity Factor (Using MDC Net) 55.7 13.9 63.9 l

52.2 13.0 59.9 l 22. Unit Capacity Factor (Using DER Net) 1.4 1.4 5.9

! 23. Unit Forced Outage Rate

! 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:

l

~

N/A _

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

l 26. Units In Test States (Prior to Commercial Operation): Forecast Achie <ed

~

l INITIAL CRITICALITY l INITIAL ELECTRICITY _

COMMERCIAL OPERATION

  • l l 14/77i l