Revised Page to Monthly Operating Rept for Apr 1981
ML20008G086
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/05/1981
From: Rogers L
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20008G066 List:
References
NUDOCS 8107020203
Download: ML20008G086 (2)


Text

....

O 1

\\

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH April YEAR 1981 (Revised 6-5-81)

APPROVED:

l "W

3TATION MA:tAGER v

810702 030D m -

w e e w..

- +

.p r--,r,-

,-----n,-,--,9w-w..,,

,~w--w e--v n ev wn-,--me.--n-m--

-.---w

,--,r,-

,er-,

,e-,

-,re + ~

OPERATING DATA REPORT DOCKET NO.

so-lan DATE c m-o1 COMPLETED BY L L-

"GERS TELEPHONE (7n1) 99a-5151 X2510 OPERATING STATUS Notes

1. Unit Name:

North Anna 1

2. Reporting Period:

April 1981 (Revised) 2775

3. Licensed Thermal Power (MWt);

947

4. Nameplate Rat.ing (Gross MWe):

907

5. Design Electrical Rating (Net MWe):

898

6. Maximum Dependable Capacity (Gross MWe);

850

7. Maxirrum Dependable Capacity (Net 5 We);
8. If Changes Gecur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reawns:

N/A

9. Power Level To Which Restricted,if Any (Net MWe):

b/A N/A

10. Reasons For Restrictions. If Any:

4 This Month Yr.-to.Date Cumu'.atne 719 2.879 25 440

11. Hours in Leporting Period
12. Number Of Hours Reactor Was Critical 589.6 589.6 18,562.7 2.2 2.2 215.3
13. Reactor Reserve Shutdt,wn Hours 499.6 499.6 18,147.7
14. Hours Generator On.Line 0

0 0

45. Unit Reserve Shutdown Hours 1,108,009 1,108,008 46,276,711
16. Gross Thermal Energy Generated (MWH) 1
17. Gross Electrical Energy Generated (MWH) 362,965, 362,965 14,697,877 340,146 340,146 13,825,149
18. Net Electrical Energy Generated (MWH) i 69.5 17.4 71.3
19. Unit Service Factor 69.5 37.4 71.3

(

20. Unit Availability Factor 55.7 13.9 63.9 l
21. Unit Capacity Factor (Using MDC Net) 52.2 13.0 59.9 l
22. Unit Capacity Factor (Using DER Net) 1.4 1.4 5.9
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:

l

~

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

l

26. Units In Test States (Prior to Commercial Operation):

Forecast Achie <ed

~

l INITIAL CRITICALITY l

INITIAL ELECTRICITY COMMERCIAL OPERATION l

l 14/77i l