D O
4 4
.r VIRGINIA ELECTRIC AND POWER COMPANY NORTH f.NNA POWER STATION MONTHLY OPERATING REPORT MONTH February YEAR 1981 (Revised 6-5-81) d i
?
r 4
i APPROVED:
1 i
fh/ e,.'
tt STATION MANAGER
,/
. 6107020 6 6
OPERATING DATA REPORT DOCKET NO. 50-338 DATE 6-5-81 COMPLETED BY L.L.
ROGERS TELEPHONE (7nU A4a-9151 X2510 OPERATING STATUS Notes
- 1. Unit Name:
North Anna 1
- 2. Reporting Period:
February 1981 (Revised) 2775
- 3. Licensed Thermal Power (MWt):
947
- 4. Nameplate Rasing (Gross MWe):
907
- 5. Design Electrical Rating (Net MWe):
898
- 6. Maximum Dependable Capacity (Gross MWe):
850
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted,if Any (Net MWe):
N/A
- 10. Reasons For Restrictions,if Any:
This Month Yr to.Date Cumulative
- 11. Hours in Reportiig Period 672 1.416 91.977
- 12. Number Of }iours Reactor Was Critical 0
0 17,973.1 0
0 213.1
- 13. Reactor Reserve Shutdown Hours 0
0 17,648.1
- 14. Hours Generator On.Line 0
0 0
i
- 15. Unit Resesse Shutdown Hours 0
0 45,168,703 l
- 16. Gross Thermal Energy Generned (MWH) 0 0
1.4,334.912
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH) 0 0
.ll.4A9.001
- 19. Unit Service Factor 0
0 73.6 0
0 73.6 l
- 20. Unit Availability Factor 0
0 66.2
- 21. Unit Capacity Factor (Using MDC Net) 0 0
62.0
- 22. Unit Capacity Factor (Using DER Net) 0 0
5.9
- 21. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
l i
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
March 17, 1981
- 26. Units In Test Status (Prior 1o Commercial Oper: tion):
Forecast Achieved INITIA L CRITICALITY i
INITIAL ELECTRICITY COMMERCIAL OPER ATION (4/77 )
L