Text

_ _..

D O

4 4

.r VIRGINIA ELECTRIC AND POWER COMPANY NORTH f.NNA POWER STATION MONTHLY OPERATING REPORT MONTH February YEAR 1981 (Revised 6-5-81) d i

?

r 4

i APPROVED:

1 i

fh/ e,.'

tt STATION MANAGER

,/

. 6107020 6 6

OPERATING DATA REPORT DOCKET NO. 50-338 DATE 6-5-81 COMPLETED BY L.L.

ROGERS TELEPHONE (7nU A4a-9151 X2510 OPERATING STATUS Notes

1. Unit Name:

North Anna 1

2. Reporting Period:

February 1981 (Revised) 2775

3. Licensed Thermal Power (MWt):

947

4. Nameplate Rasing (Gross MWe):

907

5. Design Electrical Rating (Net MWe):

898

6. Maximum Dependable Capacity (Gross MWe):

850

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted,if Any (Net MWe):

N/A

10. Reasons For Restrictions,if Any:

This Month Yr to.Date Cumulative

11. Hours in Reportiig Period 672 1.416 91.977
12. Number Of }iours Reactor Was Critical 0

0 17,973.1 0

0 213.1

13. Reactor Reserve Shutdown Hours 0

0 17,648.1

14. Hours Generator On.Line 0

0 0

i

15. Unit Resesse Shutdown Hours 0

0 45,168,703 l

16. Gross Thermal Energy Generned (MWH) 0 0

1.4,334.912

17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH) 0 0

.ll.4A9.001

19. Unit Service Factor 0

0 73.6 0

0 73.6 l

20. Unit Availability Factor 0

0 66.2

21. Unit Capacity Factor (Using MDC Net) 0 0

62.0

22. Unit Capacity Factor (Using DER Net) 0 0

5.9

21. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

l i

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

March 17, 1981

26. Units In Test Status (Prior 1o Commercial Oper: tion):

Forecast Achieved INITIA L CRITICALITY i

INITIAL ELECTRICITY COMMERCIAL OPER ATION (4/77 )

L