Inspection / Activity Plan 03/01/2005 - 09/30/2006
ML050610746
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/03/2005
From:
NRC/RGN-II/DRP/RPB2
To:
Southern Nuclear Operating Co
Shared Package
ML050610744 List:
References
IR-05-001
Download: ML050610746 (2)


Text

Page 1 of 2 Vogtle 03/03/2005 09:44:41 Inspection / Activity Plan Report 22 03/01/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type MTNTI160 - 2515/160 U-1: PZR PENETRATION NOZZLES 1 1 IP 2515/160 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01] 03/21/2005 03/25/2005 Safety Issues MTN-ISI - U1 INSERVICE INSPECTION 2 1 IP 7111108P Inservice Inspection Activities - PWR 03/23/2005 03/25/2005 Baseline Inspections MTNSGISI - U1 STEAM GENERATOR ISI 2 1 IP 7111108P Inservice Inspection Activities - PWR 03/28/2005 04/01/2005 Baseline Inspections EB1SSDPC - SSDPC PRE-INSPECTION VISIT (CNTMT W/D) 4 1, 2 IP 7111121 Safety System Design and Performance Capability 03/31/2005 03/31/2005 Baseline Inspections OL PREP - INITIAL EXAM PREP 4 1 V23228 VOGTLE/EXAM AT POWER FACILITIES 05/02/2005 05/06/2005 Not Applicable OL EXAM - INITIAL EXAM 4 1 V23228 VOGTLE/EXAM AT POWER FACILITIES 05/16/2005 05/27/2005 Not Applicable EB1SSDPC - SSDPC PRE-INSPECTION VISIT 2 1, 2 IP 7111121 Safety System Design and Performance Capability 07/18/2005 07/22/2005 Baseline Inspections PS1-RP - RADIATION PROTECTION - PRE-INSP VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/08/2005 08/10/2005 Baseline Inspections EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY 6 1, 2 IP 7111121 Safety System Design and Performance Capability 08/15/2005 08/19/2005 Baseline Inspections 1, 2 IP 7111121 Safety System Design and Performance Capability 08/29/2005 09/02/2005 Baseline Inspections PS1-RP - RP PUBLIC BASELINE 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/12/2005 09/16/2005 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 09/12/2005 09/16/2005 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 09/12/2005 09/16/2005 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program 09/12/2005 09/16/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 09/12/2005 09/16/2005 Baseline Inspections PS2-EP - EP INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 09/12/2005 09/16/2005 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 09/12/2005 09/16/2005 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 09/12/2005 09/16/2005 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 09/12/2005 09/16/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 09/12/2005 09/16/2005 Baseline Inspections MTN-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 09/26/2005 09/29/2005 Baseline Inspections MTNTI160 - 2515/160 U-2: PZR PENETRATION NOZZLES 1 2 IP 2515/160 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01] 09/26/2005 09/30/2005 Safety Issues This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Vogtle 03/03/2005 09:44:41 Inspection / Activity Plan Report 22 03/01/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type MTNSGISI - STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 10/03/2005 10/07/2005 Baseline Inspections BR2-FP - FLOOD PROTECTION 1 1, 2 IP 7111106 Flood Protection Measures 10/10/2005 10/14/2005 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 10/17/2005 10/21/2005 Baseline Inspections MTN-MR - MR EFFECTIVENESS 2 1, 2 IP 7111112B Maintenance Effectiveness 01/09/2006 01/13/2006 Baseline Inspections PS2-EP - EP EXERCISE 3 1, 2 IP 7111401 Exercise Evaluation 03/20/2006 03/24/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 03/20/2006 03/24/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/20/2006 03/24/2006 Baseline Inspections MTN-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 04/03/2006 04/07/2006 Baseline Inspections PS1-RP - RP PREINSPECTION VISIT OCCUPATIONAL 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/28/2006 08/30/2006 Baseline Inspections PS1-RP - RP BASELINE OCCUPATIONAL WK1 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 09/18/2006 09/22/2006 Baseline Inspections MTN-ISI - U1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 09/25/2006 09/29/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.