ML13291A024

From kanterella
Revision as of 10:04, 5 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

NRR E-mail Capture - Acceptance of LaSalle LAR Containment Peak Pressure (TACs ME2690 - ME2691)
ML13291A024
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 10/17/2013
From: Nicholas Difrancesco
Plant Licensing Branch III
To: Simpson L
Exelon Corp
References
ME2690, ME2691
Download: ML13291A024 (2)


Text

NRR-PMDAPEm Resource From: DiFrancesco, Nicholas Sent: Thursday, October 17, 2013 9:38 AM To: 'Lisa.Simpson@exeloncorp.com' Cc: DiFrancesco, Nicholas; Tate, Travis; David Gullott (david.gullott@exeloncorp.com)

Subject:

Acceptance of LaSalle LAR Re: Containment Peak Pressure (TACs ME2690 - ME2691)

Ms. Simpson, By letter dated September 5, 2013, Exelon Generation Company, LLC, submitted license amendment request (LAR) for LaSalle County Station, Units 1 and 2 (ADAMS Accession No. ML13249A231). The LAR proposes to revise the LaSalle Technical Specifications (TS) 5.5.13, "Primary Containment Leakage Rate Testing Program," to increase the peak calculated primary containment internal pressure for the design basis loss of coolant accident, Pa.

The purpose of this message is to provide the results of the Nuclear Regulatory Commission (NRC) staff's acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review was also intended to identify whether the applications have any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes requested and follow, as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and has concluded that it provides technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendments in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-1115.

Sincerely, Nicholas DiFrancesco Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 1

Hearing Identifier: NRR_PMDA Email Number: 872 Mail Envelope Properties (Nicholas.DiFrancesco@nrc.gov20131017093800)

Subject:

Acceptance of LaSalle LAR Re: Containment Peak Pressure (TACs ME2690 -

ME2691)

Sent Date: 10/17/2013 9:38:22 AM Received Date: 10/17/2013 9:38:00 AM From: DiFrancesco, Nicholas Created By: Nicholas.DiFrancesco@nrc.gov Recipients:

"DiFrancesco, Nicholas" <Nicholas.DiFrancesco@nrc.gov>

Tracking Status: None "Tate, Travis" <Travis.Tate@nrc.gov>

Tracking Status: None "David Gullott (david.gullott@exeloncorp.com)" <david.gullott@exeloncorp.com>

Tracking Status: None

"'Lisa.Simpson@exeloncorp.com'" <Lisa.Simpson@exeloncorp.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2287 10/17/2013 9:38:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: