Public Meeting with Entergy Operations, Inc to Discuss the Nrc'S Assessment of Safety Performance at Arkansas Nuclear One for the Period of January 1 Through December 31, 2013
ML14218A227
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/06/2014
From: Cale Young
NRC Region 4
To:
Entergy Operations
Werner G
References
Download: ML14218A227 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 August 6, 2014

SUBJECT:

PUBLIC MEETING WITH ENTERGY OPERATIONS, INC.

FACILITY: Arkansas Nuclear One DOCKET: 50-313; 50-368 DATE AND TIME: September 3, 2014 6:00 p.m. - 8:00 p.m.

LOCATION: Lakepoint Conference Center 61 Lake Point Lane Russellville, AR 72802 PURPOSE: This is the end-of-cycle public meeting between the NRC and the Entergy Operations, Inc., to present and discuss the NRCs assessment of safety performance at Arkansas Nuclear One for the period of January 1 through December 31, 2013.

CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

PARTICIPANTS: NRC Troy Pruett, Acting Director, Division of Reactor Projects Greg Werner, Chief, Project Branch E Brian Tindell, Senior Resident Inspector, Arkansas Nuclear One Abin Fairbanks, Resident Inspector, Arkansas Nuclear One Matt Young, Resident Inspector, Arkansas Nuclear One LICENSEE Jeremy Browning, Site Vice President Terry Evans, General Manager, Plant Operations Dale James, Director, Regulatory Affairs Stephenie Pyle, Regulatory Assurance Manager Other Entergy/ANO representatives.

MEETING CONTACT: Cale Young, Senior Project Engineer, NRC Region IV (817) 200-1250 Cale.Young@nrc.gov

Entergy Operations, Inc. The Nuclear Regulatory Commission provides reasonable accommodations to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., Braille, large print, or a different language), please notify the NRCs meeting contact listed above. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRCs public Web site at: http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

To receive a summary of meetings and other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html. Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

ADAMS ACCESSION NUMBER: ML14218A227