Enclosure - Emergency Planning - 10 CFR Part 52, Subpart C, Combined Licenses (Cols) for Nuclear Power Plants - Inspections, Tests, Analyses, & Acceptance Criteria (ITAAC)
ML033010440
Person / Time
Site: Nuclear Energy Institute
Issue date: 01/29/2004
From: Lyons J
NRC/NRR/DRIP/RNRP
To: Simard R
Nuclear Energy Institute
Duvigneaud D, NRR/DRIP/RNRP,301-415-1137
Shared Package
ML033010403 List:
References
Download: ML033010440 (19)


Text

EMERGENCY PLANNING 10 CFR Part 52, Subpart C, Combined Licenses (COLs) for Nuclear Power Plants Inspections, Tests, Analyses, & Acceptance Criteria (ITAAC)

D R A F T (12/15/03) B.MUSICO.doc Program Requirements1 Inspections, Tests, Analyses (ITAs)2,3 Acceptance Criteria4 A. Assignment of Responsibility - Organization Control - 10 CFR 50.47(b)(1)

Primary responsibilities for emergency response A.1.e5 Verification of implementation of A.1.e The licensee has provided for 24-hour per day by the nuclear facility licensee, and by state and emergency plans and/or inspections of emergency response, including 24-hour per day local organizations within the emergency emergency plan implementing procedures, staffing of communication links.

planning zones (EPZs) have been assigned, the including staffing rosters.

emergency responsibilities of the various supporting organizations have been specifically *A.1.e6 Verification of implementation of *A.1.e The state and local organizations7 have established, and each principle response emergency plans and/or inspections of provided for 24-hour per day emergency response, organization has staff to respond and to augment emergency plan implementing procedures, including 24-hour per day staffing of communication its initial response on a continuous basis. including staffing rosters. links.

1 The Program Requirements represent the 16 planning standards from 10 CFR 50.47(b) and Section II of NUREG-0654/FEMA-REP-1. The corresponding Acceptance Criteria are adaptations of various evaluation criteria from NUREG-0654, and encompass emergency planning (EP) program requirements that, by their nature, might not be met when the combined license (COL) application is submitted. In addition, applicable requirements from Appendix E of 10 CFR Part 50 are also included. The applicability of specific acceptance criteria will depend on the current status of the proposed site, as well as the content of the COL application. For example, an existing reactor site might already satisfy an acceptance criterion, such that the specific program requirement could be fully evaluated from the COL application, without the need for an ITAAC. NUREG-0654 evaluation criteria not included in this acceptance criteria listing would need to be fully addressed in the COL application.

2 The listed Inspections, Tests, and Analyses (ITAs) represent general verification methods for determining whether the various emergency planning acceptance criteria have been met. The COL application should provide specific inspections, tests and analyses (as appropriate), which will correspond to actual plans, procedures, organizations, etc.as well as to as-built/in-place facilities, systems, equipment and capabilitiesassociated with the proposed reactor design and site.

3 Pursuant to 10 CFR 52.97(b)(1), the licensee shall perform the inspections, tests and analyses (ITAs). The NRC, in accordance with 10 CFR 52.99, will ensure that the required (onsite) ITAs are performed by the licensee, and that the prescribed acceptance criteria are met. The NRC may also perform independent inspections as part of its verification and finding that the acceptance criteria are met. The Federal Emergency Management Agency (FEMA) has oversight for the offsite ITAs, to ensure that the prescribed acceptance criteria are met.

4 Any acceptance criteria changes would be addressed in accordance with 10 CFR 52.97(b)(2)(i).

5 The alphanumeric designations used in this guidance table of emergency planning ITAAC correspond to those in NUREG-0654/FEMA-REP-1.

6 Shaded/* ITAs and Acceptance Criteria correspond to offsite emergency planning ITAAC evaluated by FEMA.

7 The offsite acceptance criteria assume state and local government participation. However, in the event state and local government organizations do not participate, the NRC and FEMA would apply 10 CFR 50.47(c)(1) to determine whether the acceptance criteria have been met. Supplement 1 to NUREG-0654/FEMA-REP-1 (Criteria for Utility Offsite Planning and Preparedness) would be used as guidance associated with a utility plan.

1

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria A.4 Verification of implementation of A.4 The licensee is capable of continuous (24-hour) emergency plans and/or inspections of operations for a protracted period.

emergency plan implementing procedures, including staffing rosters, and as-built/in-place facilities, systems, equipment and capability.

  • A.4 Verification of implementation of *A.4 The state and local organizations are capable of emergency plans and/or inspections of continuous (24-hour) operations for a protracted emergency plan implementing procedures, period.

including staffing rosters, and as-built/in-place facilities, systems, equipment and capability.

B. Onsite Emergency Organization 10 CFR 50.47(b)(2)

On-shift facility licensee responsibilities for B.5 Verification of implementation of B.5 The licensees minimum on-shift staffing levels emergency response are unambiguously defined, emergency plans and/or inspections of are as indicated in Table B-1 of NUREG-0654/

adequate staffing to provide initial facility acci- emergency plan implementing procedures, FEMA-REP-1 (or equivalent8). The licensee is able to dent response in key functional areas is maintain- including staffing rosters, and staffing augment on-shift capabilities within a short period ed at all time, timely augmentation of response augmentation capability. after declaring an emergency, as shown in Table B-1.

capabilities is available, and the interfaces among various onsite response activities and offsite B.7 Verification of implementation of B.7 The licensee is able to augment plant staff, as support and response activities are specified. emergency plans and/or inspections of specified in Table B-1 of NUREG-0654/FEMA-REP-emergency plan implementing procedures, 1 (or equivalent), with corporate management, including staffing rosters, and staffing administrative, and technical support personnel.

augmentation capability.

C. Emergency Response Support and Resources 10 CFR 50.47(b)(3)

Arrangements for requesting and effectively C.1.c Verification of implementation of C.1.c The licensee has made provisions for incorpor-using assistance resources have been made, emergency plans and/or inspections of ating the federal response capability into its operation arrangements to accommodate state and local emergency plan implementing procedures. plan, including specific licensee, state and local 8

NUREGs, Regulatory Guides, Branch Technical Positions (BTPs), EPA recommendations, and Red Cross Multi-Media training are not required, as they are not substitutes for regulations. Methods and solutions different from those set out in such guidance will be acceptable if they provide a basis for the findings requisite to the issuance or continuance of a license by the NRC.

2

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria staff at the licensees near-site Emergency resources available to support the federal response; Operations Facility have been made, and other e.g., air fields, command posts, telephone lines, radio organizations capable of augmenting the planned frequencies, and telecommunications centers.

response have been identified.

  • C.1.c Verification of implementation of *C.1.c The state has made provisions for incorpor-emergency plans and/or inspections of ating the federal response capability into its operation emergency plan implementing procedures. plan, including specific licensee, state and local resources available to support the federal response; e.g., air fields, command posts, telephone lines, radio frequencies, and telecommunications centers.

D. Emergency Classification System 10 CFR 50.47(b)(4)

A standard emergency classification and action D.1 Verification of implementation of D.1 The licensee has established an emergency level scheme, the bases of which include facility emergency plans and/or inspections of classification and emergency action level scheme, as system and effluent parameters, is in use by the emergency plan implementing procedures, set forth in Appendix 1 to NUREG-0654/FEMA-REP-nuclear facility licensee, and state and local including communication with state and 1 or NEI 99-019 (as allowed by Regulatory Guide response plans call for reliance on information local government authorities. 1.10110). The emergency action levels (EALs) have provided by facility licensees for determinations been discussed and agreed on by the applicant and of minimum initial offsite response measures. state and local government authorities. The specific instruments, parameters or equipment status is shown for establishing each emergency class, in the in-plant emergency procedures. The plan identifies the para-meter values and equipment status for each emergency class. [10 CFR Part 50, App. E, IV.B, IV.C]

  • D.1 Verification of implementation of *D.1 The emergency classification and emergency emergency plans and/or inspections of action level scheme (i.e., emergency action emergency plan implementing procedures, levels/EALs) have been discussed and agreed on by including communication with state and the applicant and state and local government local government authorities. authorities. [10 CFR Part 50, App. E, IV.B, IV.C]

9 NEI 99-01, Methodology for Development of Emergency Action Levels, Revision 4, January 2003.

10 Regulatory Guide (RG) 1.101, Emergency Planning and Preparedness for Nuclear Power Reactors, Revision 4, July 2003.

3

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria

  • D.4 Verification of implementation of *D.4 Each state and local organization has emergency plans and/or inspections of procedures in place that provide for emergency emergency plan implementing procedures. actions to be taken, which are consistent with the emergency actions recommended by the COL, taking into account local offsite conditions that exist at the time of the emergency.

E. Notification Methods and Procedures 10 CFR 50.47(b)(5)

Procedures have been established for notification, E.2 Verification of implementation of E.2 The licensee has established procedures for by the licensee, of state and local response emergency plans and/or inspections of alerting, notifying, and mobilizing emergency organizations and for notification of emergency emergency plan implementing procedures, response personnel, and has the capability to notify personnel by all organizations; the content of including the as-built/in-place notification responsible state and local governmental agencies initial and follow-up messages to response systems and capability. within 15 minutes after declaring an emergency. [10 organizations and the public has been establish- CFR Part 50, App. E, IV.D.3]

ed; and means to provide early notification and clear instruction to the populace within the plume *E.2 Verification of implementation of *E.2 The state and local organizations have exposure pathway EPZ have been established. emergency plans and/or inspections of established procedures for alerting, notifying, and emergency plan implementing procedures, mobilizing emergency response personnel.

including the as-built/in-place notification systems and capability.

E.6 Verification of implementation of E.6 The licensee has demonstrated that emergency plans and/or inspections of administrative and physical means have been emergency plan implementing procedures, established for alerting and providing prompt including the as-built/in-place notification instructions to the public within the plume exposure systems and capability. pathway EPZ. [10 CFR Part 50, App. E, IV.D.3]

  • E.6 Verification of implementation of *E.6 The state and local officials have the capability emergency plans and/or inspections of to make a public notification decision promptly on emergency plan implementing procedures, being informed by the licensee of an emergency including the as-built/in-place public condition. [10 CFR Part 50, App. E, IV.D.3]

notification systems and capability.

  • E.6 The state and local organizations have established the administrative and physical means for alerting and providing prompt instructions to the public within the plume exposure pathway EPZ, and 4

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria have the capability to essentially complete the initial notification within about 15 minutes. [10 CFR Part 50, App. E, IV.D.3]

F. Emergency Communications 10 CFR 50.47(b)(6)

Provisions exist for prompt communications F.1 Verification of implementation of F.1 The licensee has provided for at least one onsite among principal response organizations to emergency plans and/or inspections of and one offsite communication system, including emergency personnel and to the public. emergency plan implementing procedures, reliable primary and backup means of communication, including the as-built/in-place systems, a backup power source for each system, and the equipment and capability. systems are compatible with one another. [10 CFR Part 50, App. E, IV.E.9]

  • F.1 Verification of implementation of *F.1 The state and local response organizations have emergency plans and/or inspections of established reliable primary and backup means of emergency plan implementing procedures, communication, and the systems are compatible with including test results, and as-built/in-place one another.

systems, equipment and capability.

F.1.a The licensee has provided, at a minimum, a telephone link and alternate, including 24-hour per day staffing of communication links that initiate emergency response actions.

  • F.1.a The state and local organizations have provided, at a minimum, a telephone link and alternate, including 24-hour per day staffing of communication links that initiate emergency response actions.

F.1.b The licensee has provided for communications with contiguous state/local governments within the emergency planning zones (EPZs). [10 CFR Part 50, App. E, IV.E.9.a]

  • F.1.b The state and local response organizations have provided for communications with contiguous state/local governments within the emergency 5

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria planning zones (EPZs). [10 CFR Part 50, App. E, IV.E.9.a]

F.1.c The licensee has provided for communications, as needed, with federal emergency response organizations. [10 CFR Part 50, App. E, IV.E.9.b]

  • F.1.c The state and local response organizations have provided for communications, as needed, with federal emergency response organizations. [10 CFR Part 50, App. E, IV.E.9.b]

F.1.d The licensee has provided for communications among the control room, TSC, EOF, principal state and local emergency operations centers (EOCs), and radiological monitoring/field assessment teams. [10 CFR Part 50, App. E, IV.E.9.c]

  • F.1.d The state and local response organizations have provided for communications among the control room, TSC, EOF, principal state and local emergency operations centers (EOCs), and radiological monitoring/field assessment teams. [10 CFR Part 50, App. E, IV.E.9.c]

F.1.e The licensee has made provisions for alerting or activating emergency personnel in each response organization.

  • F.1.e The state and local response organizations have provided for alerting or activating emergency personnel in each response organization.

F.1.f The licensee has made provisions for communicationsfrom the control room, TSC and EOFto the NRC headquarters and regional office 6

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria EOCs (including establishment of the Emergency Response Data System (ERDS) between the onsite computer system and the NRC Operations Center).

[10 CFR Part 50, App. E, IV.E.9.d, VI.1]

F.2 Inspection of the as-built/in-place F.2 A licensee coordinated communication link for systems, equipment and capability. fixed and mobile medical support facilities exists.

  • F.2 Inspection of the as-built/in-place *F.2 Coordinated state and local communication systems, equipment and capability. links for fixed and mobile medical support facilities exists.

F.3 Inspection of the emergency F.3 The licensee has implemented a periodic test communications system test results. program for its entire emergency communications system. [10 CFR Part 50, App. E, IV.E.9.a-d]

  • F.3 Inspection of the emergency *F.3 The state and local organizations have communications system test results. implemented a periodic test program for their entire emergency communications systems. [10 CFR Part 50, App. E, IV.E.9.a-c]

G. Public Education and Information 10 CFR 50.47(b)(7)

Information is made available to the public on a G.1 Inspection of the public information G.1 The licensee has provided for a coordinated, periodic basis on how they will be notified and program, including information provided to periodic (at least annually) dissemination of what their initial actions should be in an the public. information to the public regarding how they will be emergency (e.g., listening to a local broadcast notified and what their actions should be in an station and remaining indoors), the principal emergency. This information includes, but is not points of contact with the news media for necessarily limited to:

dissemination of information during an emergency (including the physical location or a. education information on radiation; locations) are established in advance, and b. contact for additional information; procedures for coordinated dissemination of c. protective measures, e.g., evacuation routes and information to the public are established. relocation centers, sheltering, respiratory protection, radioprotective drugs; and

d. special needs of the handicapped.

7

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria

  • G.1 Inspection of the public information *G.1 The state and local organizations have provided program, including information provided to for a coordinated, periodic (at least annually) the public. dissemination of information to the public regarding how they will be notified and what their actions should be in an emergency. This information includes, but is not necessarily limited to:
a. education information on radiation;
b. contact for additional information;
c. protective measures, e.g., evacuation routes and relocation centers, sheltering, respiratory protection, radioprotective drugs; and
d. special needs of the handicapped.

G.2 Inspection of the public information G.2 The public information program provides the program. permanent and transient adult population within the plume exposure EPZ an adequate opportunity to become aware of the information.

  • G.2 Inspection of the public information *G.2 The public information program provides the program. permanent and transient adult population within the plume exposure EPZ an adequate opportunity to become aware of the information.

G.3.b Inspection of facility and space G.3.b The licensee has provided space, which may provided for the news media. be used for a limited number of the news media.

G.5 Inspection of programs conducted, G.5 The licensee has conducted coordinated including information provided to the news programs to acquaint news media with emergency media. plans, informa-tion concerning radiation, and points of contact for release of public information in an emergency.

  • G.5 Inspection of programs conducted, *G.5 The state and local organizations have including information provided to the news conducted coordinated programs to acquaint news media. media with emergency plans, information concerning 8

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria radiation, and points of contact for release of public information in an emergency.

H. Emergency Facilities and Equipment 10 CFR 50.47(b)(8)

Adequate emergency facilities and equipment to H.1 Inspection of the as-built/in-place H.1 The licensee has established a Technical Support support the emergency response are provided and TSC, including systems, equipment and Center (TSC), in accordance with NUREG-0696 (or maintained. capability. equivalent). [10 CFR Part 50, App. E, IV.E.8]

H.1 Inspection of the as-built/in-place H.1 The licensee has established an onsite (onsite) OSC, including systems, equipment Operations Support Center (OSC) (assembly area), in and capability. accordance with NUREG-0696 (or equivalent).

H.2 Inspection of the as-built/in-place H.2 The licensee has established an Emergency EOF, including systems, equipment and Operations Facility (EOF), in accordance with capability. NUREG-0696 (or equivalent).

  • H.3 Inspection of the as-built/in-place *H.3 The state and local organizations have emergency operations centers, including established an emergency operations center (EOC) for systems, equipment and capability. use in directing and controlling response functions.

H.4 Verification of implementation of H.4 The licensee has provided for timely activation emergency plans and/or inspections of and staffing of the facilities and centers described in emergency plan implementing procedures, the plan.

including staffing rosters, and the as-built/

in-place facilities, systems, equipment and capability.

  • H.4 Verification of implementation of *H.4 The state and local organizations have provided emergency plans and/or inspections of for timely activation and staffing of the facilities and emergency plan implementing procedures, centers described in the plan.

including staffing rosters, and the as-built/

in-place facilities, systems, equipment and capability.

9

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria H.5 Verification of implementation of H.5 The licensee has identified and established emergency plans and/or inspections of monitoring systems that are to be used to initiate emergency plan implementing procedures, emergency measures, in accordance with Appendix 1 including the as-built/in-place facilities, of NUREG-0654/FEMA-REP-1 (or equivalent), as systems, equipment and capability. well as those to be used for conducting assessment of the emergency. The equipment includes:

a. geophysical phenomena monitors (e.g., meteorological, hydrologic, seismic);
b. radiological monitors (e.g., process, area, emergency, effluent, wound and portable monitors and sampling equipment);
c. process monitors (e.g., reactor coolant system pressure and temperature, containment pressure and temperature, liquid levels, flow rates, status or lineup of equipment components); and
d. fire and combustion products detectors.

H.6 Verification of implementation of H.6 The licensee has made provisions to acquire data emergency plans and/or inspections of from, or for emergency access to, offsite monitoring emergency plan implementing procedures, and analysis equipment, including:

including the as-built/in-place facilities, systems, equipment and capability. a. geophysical phenomena monitors (e.g., meteorological, hydrologic, seismic);

b. radiological monitors, including rate-meters and sampling devices. Dosimetry shall be provided and shall meet, as a minimum, the NRC Radio-logical Assessment Branch Technical Position (BTP) for the Environmental Radiological Monitoring Program (or equivalent); and
c. laboratory facilities (fixed or mobile).

H.7 Verification of implementation of H.7 The licensee, where appropriate, has provided emergency plans and/or inspections of offsite radiological monitoring equipment in the emergency plan implementing procedures, vicinity of the nuclear facility.

including the as-built/in-place offsite 10

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria radiological monitoring equipment.

  • H.7 Verification of implementation of *H.7 The state and local organizations, where appro-emergency plans and/or inspections of priate, have provided offsite radiological monitoring emergency plan implementing procedures, equipment in the vicinity of the nuclear facility.

including the as-built/in-place offsite radiological monitoring equipment.

H.8 Verification of implementation of H.8 The licensee has provided meteorological instru-emergency plans and/or inspections of mentation and procedures, which satisfy the criteria in emergency plan implementing procedures, Appendix 2 of NUREG-0654/FEMA-REP-1 (or including the as-built/in-place facilities, equivalent), and provisions to obtain representative systems, equipment and capability. current meteorological information from other sources.

H.9 Verification of implementation of H.9 The licensee has provided for an onsite emergency plans and/or inspections of Operations Support Center (OSC) (assembly area),

emergency plan implementing procedures, which has adequate capacity and supplies, including including the as-built/in-place OSC, (for example) respiratory protection, protective including systems, equipment and clothing, portable lighting, portable radiation capability. monitoring equipment, cameras and communications equipment for personnel present in the assembly area.

[10 CFR Part 50, App. E, IV.E.1]

H.10 Verification of implementation of H.10 The licensee has made provisions to inspect, emergency plans and/or inspections of inventory and operationally check emergency equip-emergency plan implementing procedures, ment/instruments at least once each calendar quarter including completed inventories, and after each use. There are reserves of instruments/

operational test results, and as-built/in-place equipment sufficient to replace those which are systems, equipment and capability. removed from emergency kits for calibration or repair.

Calibration of equipment is at intervals recommended by the supplier of the equipment. [10 CFR Part 50, App. E, IV.E.1]

11

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria

  • H.10 Verification of implementation of *H.10 The state and local organizations have made emergency plans and/or inspections of provisions to inspect, inventory and operationally emergency plan implementing procedures, check emergency equipment/ instruments at least once including completed inventories, each calendar quarter and after each use. There are operational test results, and as-built/in-place reserves of instruments/ equipment sufficient to systems, equipment and capability. replace those which are removed from emergency kits for calibration or repair. Calibration of equipment is at intervals recommended by the supplier of the equipment.

H.12 Verification of implementation of H.12 The licensee has established a central point emergency plans and/or inspections of (preferably associated with the licensees near-site emergency plan implementing procedures, EOF) for the receipt and analysis of all field including the as-built/in-place central point monitoring data and coordination of sample media.

for receipt/analysis/coordination of field monitoring data and sampling media.

  • H.12 Verification of implementation of *H.12 The state and local organizations, have emergency plans and/or inspections of established a central point (preferably associated with emergency plan implementing procedures, the licensees near-site EOF) for the receipt and including the as-built/in-place central point analysis of all field monitoring data and coordination for receipt/analysis/coordination of field of sample media.

monitoring data and sampling media.

I. Accident Assessment 10 CFR 50.47(b)(9)

Adequate methods, systems, and equipment for I.1 Verification of implementation of I.1 The plant system and effluent parameter values assessing and monitoring actual or potential emergency plans and/or inspections of characteristic of a spectrum of off-normal conditions offsite consequences of a radiological emergency emergency plan implementing procedures, and accidents, plant parameter values or other condition are in use. including the as-built/in-place facilities, information that corresponds to the example initiating systems, equipment and capability. conditions of Appendix 1 of NUREG-0654/FEMA-REP-1 (or equivalent) set at the COL stage, and the corresponding emergency class have been included in the appropriate facility emergency procedures, which specify the kinds of instruments being used and their capabilities.

12

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria I.2 Verification of implementation of I.2 Onsite capability and resources, to provide initial emergency plans and/or inspections of values and continuing assessment throughout the emergency plan implementing procedures, course of an accident, include post-accident sampling including the as-built/in-place facilities, capability or sampling contingency plans, radiation systems, equipment and capability. and effluent monitors, in-plant iodine instrumentation, and containment radiation monitoring, in accordance with NUREG-0737 and Supplement 1 to NUREG-0737 (or equivalents). [10 CFR Part 50, App. E, IV.E.2; Model Safety Evaluation11]

I.3.a-b Verification of implementation of I.3.a-b The licensee has established methods and emergency plans and/or inspections of techniques to be used for determining the source term emergency plan implementing procedures, of releases of radioactive material within plant including the as-built/in-place systems, systems, and the magnitude of the release of equipment and capability. radioactive materials based on plant system parameters and effluent monitors. [10 CFR Part 50, App. E, IV.E.2; Model Safety Evaluation]

I.4 Verification of implementation of I.4 The licensee has established the relationship emergency plans and/or inspections of between effluent monitor readings, and onsite and emergency plan implementing procedures, offsite exposures and contamination for various including the as-built/in-place systems, meteorological conditions; and has provided for equipment and capability. equipment to continuously assess the impact of the release of radioactive materials to the environment.

[10 CFR Part 50, App. E, IV.E.2]

I.5 Inspection of the as-built EOF, nearsite I.5 The licensee has the capability of acquiring and EOF, TSC, Control Room, and offsite NRC evaluating meteorological information, sufficient to center. Verification of implementation of meet the criteria of Appendix 2 of NUREG-0654/

emergency plans and/or inspections of FEMA-REP-1 (or equivalent). There are provisions emergency plan implementing procedures, for access to meteorological information by at least including the as-built/in-place the nearsite EOF, the TSC, the Control Room and an meteorological data systems/intercon- offsite NRC center. The licensee has made available 11 NRC Federal Register notice (65 FR 65018), October 31, 2000, Notice of Availability for Referencing in License Amendment Applications - Model Safety Evaluation on Technical Specification Improvement to Eliminate Requirements on Post Accident Sampling Systems Using the Consolidated Line Item Improvement Process.

13

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria nections, equipment and capabilities. to the state suitable meteorological data processing interconnections, which will permit independent analysis by the state, of facility generated data in those states with the resources to effectively use this information.

I.6 Verification of implementation of I.6 The licensee has implemented the methodology emergency plans and/or inspections of for determining the release rate and projected doses if emergency plan implementing procedures, the instrumentation used for assessment is off-scale or including the as-built/in-place systems, inoperable.

equipment and capability.

I.7 Verification of implementation of I.7 The licensee has described the capability and emergency plans and/or inspections of resources for field monitoring within the plume emergency plan implementing procedures, exposure EPZ, which are an intrinsic part of the including as-built/in-place systems, concept of operations for the facility.

equipment and capability.

  • I.7 Verification of implementation of *I.7 The state and local organizations have described emergency plans and/or inspections of the capability and resources for field monitoring emergency plan implementing procedures, within the plume exposure EPZ, which are an intrinsic including the as-built/in-place systems, part of the concept of operations for the facility.

equipment and capability.

I.8 Verification of implementation of I.8 The licensee, where appropriate, has provided emergency plans and/or inspections of methods, equipment and expertise to make rapid emergency plan implementing procedures, assessments of the actual or potential magnitude and including the as-built/in-place systems, locations of any radiological hazards through liquid or equipment and capability. gaseous release pathways. This includes activation, notification means, field team composition, transportation, communication, monitoring equipment and estimated deployment times.

  • I.8 Verification of implementation of *I.8 The state or local organizations, where emergency plans and/or inspections of appropriate, have provided methods, equipment and emergency plan implementing procedures, expertise to make rapid assessments of the actual or 14

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria including the as-built/in-place systems, potential magnitude and locations of any radiological equipment and capability. hazards through gaseous release pathways. This includes activation, notification means, field team composition, transportation, communication, monitoring equipment and estimated deployment times.

I.9 Verification of implementation of I.9 The licensee has a capability to detect and emergency plans and/or inspections of measure radioiodine concentrations in air in the plume emergency plan implementing procedures, exposure EPZ, as low as 10-7 µCi/cc (microcuries per including the as-built/in-place systems, cubic centimeter) under field conditions. Interference equipment and capability. from the presence of noble gas and background radiation does not decrease the stated minimum detectable activity.

  • I.9 Verification of implementation of *I.9 The state or local organizations have a capability emergency plans and/or inspections of to detect and measure radioiodine concentrations in air emergency plan implementing procedures, in the plume exposure EPZ, as low as 10-7 µCi/cc including the as-built/in-plant systems, (microcuries per cubic centimeter) under field equipment and capability. conditions. Interference from the presence of noble gas and background radiation does not decrease the stated minimum detectable activity.

I.10 Verification of implementation of I.10 The licensee has established means for relating emergency plans and/or inspections of the various measured parameters (e.g., contamination emergency plan implementing procedures, levels, water/air activity levels) to dose rates for key including the as-built/in-place facilities, isotopes (i.e., those given in Table 3 of NUREG-0654/

systems, equipment and capability. FEMA-REP-1) (or equivalent) and gross radioactivity measurements. Provisions have been made for estimating integrated dose from the projected and actual dose rates, and for comparing these estimates with the protective action guides (PAGs). The detail-ed provisions are described in separate procedures.

15

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria

  • I.10. Verification of implementation of *I.10. The state or local organizations have emergency plans and/or inspections of established means for relating the various measured emergency plan implementing procedures, parameters (e.g., contamination levels, water and air including the as-built/in-place facilities, activity levels) to dose rates for key isotopes (i.e.,

systems, equipment and capability. those given in Table 3 of NUREG-0654/FEMA-REP-

1) (or equivalent) and gross radioactivity mea-surements. Provisions have been made for estimating integrated dose from the projected and actual dose rates, and for comparing these estimates with the protective action guides (PAGs). The detail-ed provisions are described in separate procedures.
  • I.11 Verification of implementation of *I.11 The state or local organizations have made emergency plans and/or inspections of arrangements to locate and track the airborne emergency plan implementing procedures, radioactive plume, using any or all federal, state, and including the as-built/in-place facilities, local resources.

systems, equipment and capability.

J. Protective Response 10 CFR 50.47(b)(10)

A range of protective actions has been developed J.1 Verification of implementation of J.1 The licensee has established the means and time for the plume exposure pathway EPZ for emer- emergency plans and/or inspections of required to warn or advise onsite individuals, gency workers and the public. In developing this emergency plan implementing procedures, including those in areas controlled by the operator, range of actions, consideration has been given to including the as-built/in-place facilities, including:

evacuation, sheltering, and, as a supplement to systems, equipment and capability.

these, the prophylactic use of potassium iodide a. employees not having emergency assignments; (KI), as appropriate. Guidelines for the choice of b. visitors; protective actions during an emergency, c. contractor and construction personnel; and consistent with federal guidance, are developed d. other persons who may be in the public access and in place, and protective actions for the areas on or passing through the site or within the ingestion exposure pathway EPZ appropriate to owner controlled area.

the locale have been developed.

J.3 Verification of implementation of J.3 The licensee has provided for radiological emergency plans and/or inspections of monitoring of people evacuated from the site.

emergency plan implementing procedures, including the as-built/in-place facilities, systems, equipment and capability.

16

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria J.4 Verification of implementation of J.4 The licensee has provided for the evacuation of emergency plans and/or inspections of onsite non-essential personnel in the event of a Site or emergency plan implementing procedures, General Emergency, and has provided a decontam-including the as-built/in-place facilities, ination capability at, or near, the monitoring point for systems, equipment and capability. people evacuated from the site.

J.5 Verification of implementation of J.5 The licensee has provided a capability to account emergency plans and/or inspections of for all individuals onsite at the time of an emergency, emergency plan implementing procedures, and ascertain the names of missing persons within 30 including the as-built/in-place facilities, minutes of the start of an emergency, and can account systems, equipment and capability. for all onsite individuals continuously thereafter.

J.6 Verification of implementation of J.6 For individuals remaining or arriving onsite emergency plans and/or inspections of during an emergency, the licensee has made emergency plan implementing procedures, provisions for individual respiratory protection, use of including the as-built/in-place facilities, protective clothing, and use of radioprotective drugs systems, equipment and capability. (e.g., individual thyroid protection).

  • J.9 Verification of implementation of *J.9 The state and local organizations have emergency plans and/or inspections of established a capability for implementing protective emergency plan implementing procedures, measures based upon protective guides and other including the as-built/in-place facilities, criteria, and consistent with the Environmental systems, equipment and capability. Protection Agency (EPA) recommendations (or equivalent) regarding exposure resulting from the passage of radioactive airborne plumes.

J.10.c Verification of implementation of J.10.c The licensees plans to implement protective emergency plans and/or inspections of measures for the plume exposure pathway (EPZ) emergency plan implementing procedures, include the means for notifying all segments of the including the as-built/in-place systems, transient and resident populations.

equipment and capability.

17

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria

  • J.10 Verification of implementation of *J.10 The state and local organizations have the emergency plans and/or inspections of means to implement protective measures for the emergency plan implementing procedures, plume exposure pathway (EPZ) including:

including the as-built/in-place facilities, systems, equipment and capability. a. means for notifying all segments of the transient and resident population;

b. means for protecting those persons whose mobility may be impaired due to such factors as institutional or other confinement;
c. provisions for the use of radioprotective drugs, particularly for emergency workers and institutionalized persons within the plume exposure EPZ whose immediate evacuation may be infeasible or very difficult, including quantities, storage, and means of distribution;
h. relocation centers in host areas which are at least 5 miles, and preferably 10 miles, beyond the boundaries of the plume exposure EPZ; and
k. identification and availability of means for dealing with potential impediments (e.g.,

seasonal impassability of roads) to use of evacuation routes, and contingency measures.

  • J.11 Inspection of maps and facility lists. *J.11 The state or local organizations maintain maps for recording survey and monitoring data, key land use data (e.g., farming), dairies, food processing plants, water sheds, water supply intake and treatment plants and reservoirs. Provisions for maps showing detailed crop information may be by including reference to their availability and location and a plan for their use. The maps start at the facility and include all of the 50-mile ingestion pathway EPZ. Up-to-date lists are maintained of the name and location of all facilities that regularly process milk products and other large amounts of food or agricultural products originating in the ingestion pathway EPZ, but located 18

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria elsewhere.

  • J.12 Verification of implementation of *J.12 The state or local organizations have the means emergency plans and/or inspections of for registering and monitoring evacuees at reception emergency plan implementing procedures, centers. The resources available (i.e., trained including as-built/in-place facilities, personnel and equipment) are capable of monitoring, systems, equipment and capability. within about a 12-hour period, 20% of that portion of the plume EPZ allocated to the reception center.

[FEMA-REP-1412]

K. Radiological Exposure Control 10 CFR 50.47(b)(11)

Means for controlling radiological exposures, in K.2 Verification of implementation of K.2 The licensee has provided an onsite radiation an emergency, are established for emergency emergency plans and/or inspections of protection program to be implemented during workers. The means for controlling radiological emergency plan implementing procedures, emergencies, and has included methods to implement exposures shall include exposure guidelines including as-built/in-place facilities, exposure guidelines.

consistent with EPA Emergency Worker and systems, equipment and capability.

Lifesaving Activity PAGs.

K.3.a Verification of implementation of K.3.a The licensee has made provisions for 24-hour-emergency plans and/or inspections of per-day capability to determine the doses received by emergency plan implementing procedures, emergency personnel involved in any nuclear including as-built/in-place facilities, accident, including volunteers. The licensee has made systems, equipment and capability. provisions for equipment at the site for personnel monitoring, including distribution of dosimeters (both self-reading and permanent record devices). [10 CFR Part 50, App. E, IV.E.1]

  • K.3.a Verification of implementation of *K.3.a The state or local organizations have made emergency plans and/or inspections of provisions for 24-hour-per-day capability to determine emergency plan implementing procedures, the doses received by emergency personnel involved including as-built/in-place facilities, in any nuclear accident, including volunteers. The systems, equipment and capability. state or local organizations have made provisions for distribution of dosimeters, both self-reading and permanent record devices.

12 FEMA-REP-14, Radiological Emergency Preparedness Exercise Manual, Exercise Objective 18 (21), Reception Center - Monitoring, Decontamination, and Registration.

19

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria K.3.b Verification of implementation of K.3.b The licensee has ensured that dosimeters are emergency plans and/or inspections of read at appropriate frequencies, and has provided for emergency plan implementing procedures, maintaining dose records for emergency workers including as-built/in-place facilities, involved in any nuclear accident.

systems, equipment and capability.

  • K.3.b Verification of implementation of *K.3.b The state or local organizations have ensured emergency plans and/or inspections of that dosimeters are read at appropriate frequencies, emergency plan implementing procedures, and have provided for maintaining dose records for including as-built/in-place facilities, emergency workers involved in any nuclear accident.

systems, equipment and capability.

K.5.b Verification of implementation of K.5.b The licensee has established (as appropriate) emergency plans and/or inspections of the means for radiological decontamination of emergency plan implementing procedures, emergency personnel and woundsincluding including as-built/in-place facilities, facilities, equipment, instruments and suppliesand systems, equipment and capability. for waste disposal. [10 CFR Part 50, App. E, IV.E.3]

  • K.5.b Verification of implementation of *K.5.b The state or local organizations have emergency plans and/or inspections of established (as appropriate) the means for radiological emergency plan implementing procedures, decontamination of emergency personnel and including as-built/in-place facilities, woundsincluding facilities, equipment, instruments systems, equipment and capability. and suppliesand for waste disposal.

K.6 Verification of implementation of K.6 The licensee has provided onsite contamination emergency plans and/or inspections of control measures, including area access control, and emergency plan implementing procedures, drinking water and food supplies.

including as-built/in-place facilities, systems, equipment and capability.

K.7 Verification of implementation of K.7 The licensee has provided the capability for emergency plans and/or inspections of decontaminating relocated onsite personnel, including emergency plan implementing procedures, providing for extra clothing and decontaminants including as-built/in-place facilities, suitable for the type of contamination expected, with systems, equipment and capability. particular attention given to radioiodine contamination of the skin.

20

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria L. Medical and Public Health Support 10 CFR 50.47(b)(12)

Arrangements are made for medical services for L.1 Verification of implementation of L.1 The licensee has arranged for local and backup contaminated, injured individuals. emergency plans and/or inspections of hospital and medical services having the capability for emergency plan implementing procedures, evaluation of radiation exposure and uptake, including including as-built/in-place facilities, assurance that persons providing these services are systems, equipment and capability. adequately prepared to handle radiation emergencies, including contaminated persons. [10 CFR Part 50, App. E, IV.E.5, IV.E.7]

  • L.1 Verification of implementation of *L.1 The state or local organizations have arranged emergency plans and/or inspections of for local and backup hospital and medical services emergency plan implementing procedures, having the capability for evaluation of radiation including as-built/in-place facilities, exposure and uptake, including assurance that persons systems, equipment and capability. providing these services are adequately prepared to handle radiation emergencies, including contaminated individuals. [10 CFR Part 50, App. E, IV.E.5, IV.E.7]

L.2 Verification of implementation of L.2 The licensee has provided for onsite first aid emergency plans and/or inspections of capability, including facilities and medical supplies.

emergency plan implementing procedures, [10 CFR Part 50, App. E, IV.E.4]

including as-built/in-place facilities, systems, equipment and capability.

L.4 Verification of implementation of L.4 The licensee has arranged for transporting emergency plans and/or inspections of victims of radiological accidents, including emergency plan implementing procedures, contaminated injured individuals, from the site to including as-built/in-place systems, offsite medical support facilities. [10 CFR Part 50, equipment and capability. App. E, IV.E.6]

  • L.4 Verification of implementation of *L.4 The state or local organizations have arranged emergency plans and/or inspections of for transporting victims of radiological accidents to emergency plan implementing procedures, medical support facilities.

including as-built/in-place systems, equipment and capability.

21

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria M. Recovery and Reentry Planning and Post-Accident Operations - 10 CFR 50.47(b)(13)

General plans for recovery and reentry are developed. N/A N/A N. Exercises and Drills 10 CFR 50.47(b)(14)

Periodic exercises are (will be) conducted to Test of the emergency response capabilities, N.1.a The exercise was conducted as set forth in evaluate major portions of emergency response including direct inspection (observation) of NRC rules, and tested the integrated capability of the capabilities, periodic drills are (will be) exercise activities. emergency preparedness plans and organizations. [10 conducted to develop and maintain key skills, [For all licensee Acceptance Criteria.] CFR Part 50, App. E, IV.F.2.a]

and deficiencies identified as a result of exercises or drills are (will be) corrected. *Test of the emergency response *N.1.a The exercise was conducted as set forth in capabilities, including direct inspection FEMA rules, and tested the integrated capability of (observation) of exercise activities. the emergency preparedness plans and organizations.

[For all state/local Acceptance Criteria.] [10 CFR Part 50, App. E, IV.F.2.a]

N.1.a The exercise simulated an emergency onsite that resulted in offsite radiological releases, necessitating response by offsite authorities. [10 CFR Part 50, App. E, IV.F.2.a]

  • N.1.a The exercise simulated an emergency onsite that resulted in offsite radiological releases, necessitating response by offsite authorities. [10 CFR Part 50, App. E, IV.F.2.a]

N.1.b The exercise included mobilization of state and local personnel and resources, adequate to verify the capability to respond to an accident scenario necessitating response. [10 CFR Part 50, App. E, IV.F.2.a]

  • N.1.b The exercise included mobilization of state and local personnel and resources, adequate to verify the capability to respond to an accident scenario necessitating response.[10 CFR Part 50, App. E, IV.F.2.a]

22

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria N.1.b The licensee provided for a critique of the exercise by federal and state observers/evaluators. [10 CFR Part 50, App. E, IV.F.2.g]

  • N.1.b The state and local organizations provided for a critique of the exercise by federal and state observers/evaluators. [10 CFR Part 50, App. E, IV.F.2.g]

N.4 Official observers from federal, state or local governments observed, evaluated, and critiqued the exercise at the conclusion of the exercise. The critique evaluated the ability of the organizations to respond, as called for in the plan. A formal evaluation resulted from the critique. [10 CFR Part 50, App. E, IV.F.2.g]

  • N.4 Official observers from federal, state or local governments observed, evaluated, and critiqued the exercise at the conclusion of the exercise. The critique evaluated the ability of the organizations to respond, as called for in the plan. A formal evaluation resulted from the critique. [10 CFR Part 50, App. E, IV.F.2.g]

N.5 The licensee established means for evaluating observer and participant comments on areas needing improvement, including emergency plan procedural changes, and for assigning responsibility for implementing corrective actions. The licensee established management control used to ensure that corrective actions are implemented. [10 CFR Part 50, App. E, IV.F.2.g]

23

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria

  • N.5 The state and local organizations established means for evaluating observer and participant comments on areas needing improvement, including emergency plan procedural changes, and for assigning responsibility for implementing corrective actions.

The state and local organizations established management control used to ensure that corrective actions are implemented. [10 CFR Part 50, App. E, IV.F.2.g]

O. Radiological Emergency Response Training 10 CFR 50.47(b)(15)

Radiological emergency response training is Inspection of training, including training O.1 The licensee has assured the training of provided to those who may be called on to assist procedures and records, and verification of appropriate individuals. [10 CFR Part 50, App. E, in an emergency. actual training and capabilities through IV.F.1]

observation, questioning, or testing select trainees or organizations.

[For all licensee Acceptance Criteria.]

  • Inspection of training, including training *O.1 The state and local organizations have assured procedures and records, and verification of the training of appropriate individuals.

actual training and capabilities through observation, questioning, or testing select trainees or organizations.

[For all state/local Acceptance Criteria.]

O.1.a The licensee has provided an opportunity for site specific emergency response training for those offsite emergency organizations that may be called upon to provide assistance in the event of an emergency. [10 CFR Part 50, App. E, IV.F.1]

  • O.1.b The state and local organizations have participated in, and received, training. Where mutual aid agreements exist between local agencies such as fire, police and ambulance/rescue, the training was offered to the other departments that are members of the mutual aid district.

24

Program Requirements Inspections, Tests, Analyses (ITAs) Acceptance Criteria O.3 Training for individuals assigned to licensees first aid teams included courses equivalent to Red Cross Multi-Media. [10 CFR Part 50, App. E, IV.F.1.vi]

P. Responsibility for the Planning Effort:

Development, Periodic Review, and Distribution of Emergency Plans 10 CFR 50.47(b)(16)

Responsibilities for plan development and review P.4 Inspection of emergency plan and P.4 The licensee has certified its plan and agreements and for distribution of emergency plans are agreements, including certifications. as current.

established, and planners are properly trained.

  • P.4 Inspection of emergency plans and *P.4 The state and local organizations have certified agreements, including certifications. their plans and agreements as current.

P.5 Inspection (inquiry) of organizations P.5 The licensee has forwarded its emergency and individuals with responsibility for response plans to all organizations and appropriate implementation of the plans. individuals with responsibility for implementation of the plans.

  • P.5 Inspection (inquiry) of organizations *P.5 The state and local organizations have and individuals with responsibility for forwarded their emergency response plans to all implementation of the plans. organizations and appropriate individuals with responsibility for implementation of the plans.
      1. END ###