January 29, 2004 Dr. Ronald L. Simard Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708
SUBJECT:
PROPOSAL TO DISCUSS COMBINED LICENSE TOPIC 10 (COL-10), THE 10 CFR PART 52 SUBPART C EMERGENCY PLANNING INSPECTIONS, TESTS, ANALYSES, AND ACCEPTANCE CRITERIA (ITAAC)
Dear Dr. Simard:
This letter provides a proposed draft of Emergency Planning (EP) inspections, tests, analyses, and acceptance criteria (ITAAC), for the purpose of initiating discussion with industry and public stakeholders. This topic is identified as item "COL-10" on the Nuclear Energy Institutes (NEIs) list of generic combined license (COL) issues that NEI provided to the staff during a May 22, 2003, public meeting (
Reference:
NRC Meeting Summary - ADAMS Accession No. ML031970065). The development of EP ITAAC is part of our ongoing NRC-industry public working group, and is associated with the development of the structure and content of prospective COL applications, which would be submitted under Subpart C of 10 CFR Part 52.
The NRC staff, in consultation with the Department of Homeland Security/Federal Emergency Management Agency (DHS/FEMA), crafted the EP ITAAC, which address 15 of the 16 EP planning standards in 10 CFR 50.47(b) and NUREG-0654/FEMA-REP-1, Rev. 1. (The excluded planning standard, 50.47(b)(13), pertains to the development of general plans for recovery and reentry, and was determined to be not applicable to EP ITAAC.) The draft proposed EP ITAAC update earlier versions found in Attachment 2 of SECY-95-090, "Emergency Planning Under 10 CFR Part 52," April 11, 1995, and SECY-02-0067, "Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) for Operational Programs (Programmatic ITAAC)," April 15, 2002. SECY-95-090 included preliminary illustrative EP ITAAC, addressing 2 of the 16 planning standards. As stated in SECY-95-090, [s]ubstantial refinement is needed to fully develop these ITAAC. The enclosed draft EP ITAAC reflect the current collective efforts of NRC and FEMA staff to provide this refinement, and incorporate various lessons learned from previous design certification reviews under Subpart B of 10 CFR Part 52.
The staff would like to meet with NEI and other stakeholders in order to discuss the enclosed EP ITAAC and solicit comments. In addition to comments on the specifics of the attached draft
R. Simard proposed EP ITAAC, the staff would like to discuss the following issues with interested stakeholders:
The enclosure contains high-level generic acceptance criteria. These criteria were adapted from those found in NUREG-0654. It is expected that a COL applicant will be able to provide more detailed EP ITAAC that are site specific at the COL application stage. Such detailed EP ITAAC would satisfy the intent of the proposed generic EP ITAAC that are attached. Is it necessary to capture guidance related to providing detailed EP ITAAC and, if so, what is the best way to capture such guidance?
The offsite acceptance criteria in the enclosure assume state and local government participation. If the state and local officials terminate or limit their cooperation between the time of COL issuance and fuel loading the draft proposed EP ITAAC may no longer be valid. In that case, the EP ITAAC incorporated in the license under 10 CFR 52.97(b)(1) would have to be changed by a license amendment in accordance with 10 CFR 52.97(b)(2)(i). The staff would like to discuss with stakeholders the feasibility of developing offsite EP ITAAC that cover both possibilities (i.e., assuming state and local government participation, and assuming state and local governments do not participate).
The enclosure contains references to emergency plans. The staff attempted to distinguish between issues that should be resolved prior to issuance of a COL from those that can only be resolved after issuance of a COL. For example, the emergency plans and the EP ITAAC will be reviewed and approved prior to granting a COL, while compliance with the ITAAC would be assessed post-licensing, using the ITAAC to verify the implementation of those plans. The staff would like to discuss stakeholder views on the need for clarification of the EP ITAAC in the enclosure to separate those issues that should be resolved prior to issuance of a COL from those that can only be resolved after the COL is issued.
Compliance with some of the ITAAC in the enclosure could be assessed concurrently.
The staff would like to discuss with stakeholders this concurrent review and its implications.
R. Simard Please contact Mr. Joseph Sebrosky (COL Project Manager) at 301-415-1132, if you have any questions regarding the enclosure. I expect that there will be at least one category 3 public meeting so that all interested stakeholders can comment on the form and content of EP ITAAC.
Sincerely,
/RA/
James E. Lyons, Program Director New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Project No. 689 cc: See next page
Enclosure:
as stated
R. Simard Please contact Mr. Joseph Sebrosky (COL Project Manager) at 301-415-1132, if you have any questions regarding the enclosure. I expect that there will be at least one category 3 public meeting so that all interested stakeholders can comment on the form and content of EP ITAAC.
Sincerely,
/RA/
James E. Lyons, Program Director New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Project No. 689 cc: See next page
Enclosure:
as stated Distribution: See next page ACCESSION NO. ML033010403-Pkg.
ML033010411-Response Letter ML033010440-Enclosure
- See Previous concurrence OFC INT:RNRP PM:RNRP SC: IEPB SPA:RNRP SC:RNRP OGC PD:RNRP NAME DDuvigneaud*
JSebrosky EWeiss*
JWilson*
LDudes*
RWeisman* JLyons DATE 12/9/2003 1/28/2004 01/13/2004 12/10/2003 1/5/2004 1/02/2004 1/28/2004 OFFICIAL RECORD COPY
Distribution for Letter to R. Simard dated January 29, 2004 Hard Copy PUBLIC RNRP Rdg JSebrosky LDudes JLyons E-mail JDyer/RBorchardt JCraig BSheron OGC ACRS/ACNW NRR/RNRP MAshley JBlake RGardner CPaulk GMizuno RWeisman JMoore KBarber, OGC DBarss BMusico NIqmbal PQualls TKenyon DCoe MEl-Zeftway
Combination List:
Mr. Charles Brinkman Westinghouse Electric Co.
Washington Operations 12300 Twinbrook Pkwy., Suite 330 Rockville, MD 20852 Mr. David Lochbaum, Nuclear Safety Engineer Union of Concerned Scientists 1707 H Street, NW, Suite 600 Washington, DC 20006-3919 Dr. Gail H. Marcus U.S. Department of Energy Office of Nuclear Energy, Science
& Technology NE-1, Room 5A-143 1000 Independence Avenue, SW Washington, DC 20585 Mr. Paul Gunter Nuclear Information & Resource Service 1424 16th Street, NW, Suite 404 Washington, DC 20036 Mr. James Riccio Greenpeace 702 H Street, NW, Suite 300 Washington, DC 20001 Mr. Ron Simard Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708 Mr. George Alan Zinke Project Manager Nuclear Business Development Entergy Nuclear M-ECH-683 1340 Echelon Parkway Jackson, MS 39213 Mr. Thomas P. Miller U.S. Department of Energy NE-20, Rm. A286 Headquarters-Germantown 19901 Germantown Road Germantown, MD 20874-1290 Ms. Marilyn Kray Vice President, Special Projects Exelon Generation 200 Exelon Way, KSA3-E Kennett Square, PA 19348 Mr. Laurence Parme Manager, GT-MHR Safety & Licensing General Atomics Company P.O. Box 85608 San Diego, CA 92186-5608 Mr. Joseph D. Hegner Lead Engineer - Licensing Dominion Generation Early Site Permitting Project 5000 Dominion Boulevard Glen Allen, VA 23060 Mr. Edward L. Quinn MDM Services Corporations Utility Operations Division 28202 Cabot Road, Suite 205 Laguna Nigual, CA 92677 Lynn Connor Doc-Search Associates 2211 sw 1ST Ave - #1502 Portland, OR 97201 Mr. Paul Leventhal Nuclear Control Institute 1000 Connecticut Avenue, NW Suite 410 Washington, DC 20036 Mr. James F. Mallay, Director Regulatory Affairs FRAMATOME, ANP 3315 Old Forest Road Lynchburg, VA 24501 Mr. W. Edward Cummins AP600 and AP1000 Projects Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355
Mr. Kelly R. Fletcher, Manager Business Development and Advanced Technologies GE Nuclear Energy 175 Curtner Avenue, MC 784 San Jose, CA 95125 Mr. Jack W. Roe SCIENTECH, INC.
910 Clopper Road Gaithersburg, MD 20878 Mr. Stephen P. Frantz Morgan, Lewis, & Bockius, LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Mr. Gary Wright, Manager Office of Nuclear Facility Safety Illinois Department of Nuclear Safety 1035 Outer Park Drive Springfield, IL 62704 Mr. David Ritter Research Associate on Nuclear Energy Public Citizens Critical Mass Energy and Environmental Program 215 Pennsylvania Avenue, SE Washington, DC 20003 Mr. Tom Clements 6703 Gude Avenue Takoma Park, MD 20912 Mr. Horace R. Hall, Commercial Manager Nuclear Business Team UCAR Carbon Company, Inc.
P.O. Box 2170 Clarksburg, West Virginia 26302-2170 Mr. James Blyth Canadian Nuclear Safety Commission 280 Slater Street, Station B P.O. Box 1046 Ottawa, Ontario K1P 5S9 Dr. Atambir S. Rao Project Manager, ESBWR GE Nuclear Energy 175 Curtner Avenue, MC 365 San Jose, CA 95125 USA Mr. Edward F. Sproat, III Vice President - Intl Projects Exelon Generation 200 Exelon Way Kennett Square, PA 19348 Mr. Vince Langman Licensing Manager Atomic Energy of Canada Limited 2251 Speakman Drive Mississauga, Ontario Canada L5K 1B2 Dr. Regis A. Matzie Senior Vice President and Chief Technology Officer Westinghouse Electric Company 2000 Day Hill Road Windsor, CT 06095-0500 Mr. Ed Wallace, General Manager Projects PBMR Pty LTD PO Box 9396 Centurion 0046 Republic of South Africa Mr. Dobie McArthur Director, Washington Operations General Atomics 1899 Pennsylvania Avenue, NW Suite 300 Washington, DC 20006 Vanessa E. Quinn, Section Chief Radiological Emergency Preparedness Branch Nuclear and Chemical Hazards Division Federal Emergency Management Agency/DHS 500 C Street SW Washington, D.C. 20472