Proposal to Discuss COL-10, the 10 CFR Part 52 Subpart C Emergency Planning ITAAC
ML033010411
Person / Time
Site: Nuclear Energy Institute
Issue date: 01/29/2004
From: Lyons J
NRC/NRR/DRIP/RNRP
To: Simard R
Nuclear Energy Institute
Duvigneaud D, NRR/DRIP/RNRP,301-415-1137
Shared Package
ML033010403 List:
References
Download: ML033010411 (8)


Text

January 29, 2004 Dr. Ronald L. Simard Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708

SUBJECT:

PROPOSAL TO DISCUSS COMBINED LICENSE TOPIC 10 (COL-10), THE 10 CFR PART 52 SUBPART C EMERGENCY PLANNING INSPECTIONS, TESTS, ANALYSES, AND ACCEPTANCE CRITERIA (ITAAC)

Dear Dr. Simard:

This letter provides a proposed draft of Emergency Planning (EP) inspections, tests, analyses, and acceptance criteria (ITAAC), for the purpose of initiating discussion with industry and public stakeholders. This topic is identified as item "COL-10" on the Nuclear Energy Institutes (NEIs) list of generic combined license (COL) issues that NEI provided to the staff during a May 22, 2003, public meeting (

Reference:

NRC Meeting Summary - ADAMS Accession No. ML031970065). The development of EP ITAAC is part of our ongoing NRC-industry public working group, and is associated with the development of the structure and content of prospective COL applications, which would be submitted under Subpart C of 10 CFR Part 52.

The NRC staff, in consultation with the Department of Homeland Security/Federal Emergency Management Agency (DHS/FEMA), crafted the EP ITAAC, which address 15 of the 16 EP planning standards in 10 CFR 50.47(b) and NUREG-0654/FEMA-REP-1, Rev. 1. (The excluded planning standard, 50.47(b)(13), pertains to the development of general plans for recovery and reentry, and was determined to be not applicable to EP ITAAC.) The draft proposed EP ITAAC update earlier versions found in Attachment 2 of SECY-95-090, "Emergency Planning Under 10 CFR Part 52," April 11, 1995, and SECY-02-0067, "Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) for Operational Programs (Programmatic ITAAC)," April 15, 2002. SECY-95-090 included preliminary illustrative EP ITAAC, addressing 2 of the 16 planning standards. As stated in SECY-95-090, [s]ubstantial refinement is needed to fully develop these ITAAC. The enclosed draft EP ITAAC reflect the current collective efforts of NRC and FEMA staff to provide this refinement, and incorporate various lessons learned from previous design certification reviews under Subpart B of 10 CFR Part 52.

The staff would like to meet with NEI and other stakeholders in order to discuss the enclosed EP ITAAC and solicit comments. In addition to comments on the specifics of the attached draft

R. Simard proposed EP ITAAC, the staff would like to discuss the following issues with interested stakeholders:

C The enclosure contains high-level generic acceptance criteria. These criteria were adapted from those found in NUREG-0654. It is expected that a COL applicant will be able to provide more detailed EP ITAAC that are site specific at the COL application stage. Such detailed EP ITAAC would satisfy the intent of the proposed generic EP ITAAC that are attached. Is it necessary to capture guidance related to providing detailed EP ITAAC and, if so, what is the best way to capture such guidance?

C The offsite acceptance criteria in the enclosure assume state and local government participation. If the state and local officials terminate or limit their cooperation between the time of COL issuance and fuel loading the draft proposed EP ITAAC may no longer be valid. In that case, the EP ITAAC incorporated in the license under 10 CFR 52.97(b)(1) would have to be changed by a license amendment in accordance with 10 CFR 52.97(b)(2)(i). The staff would like to discuss with stakeholders the feasibility of developing offsite EP ITAAC that cover both possibilities (i.e., assuming state and local government participation, and assuming state and local governments do not participate).

C The enclosure contains references to emergency plans. The staff attempted to distinguish between issues that should be resolved prior to issuance of a COL from those that can only be resolved after issuance of a COL. For example, the emergency plans and the EP ITAAC will be reviewed and approved prior to granting a COL, while compliance with the ITAAC would be assessed post-licensing, using the ITAAC to verify the implementation of those plans. The staff would like to discuss stakeholder views on the need for clarification of the EP ITAAC in the enclosure to separate those issues that should be resolved prior to issuance of a COL from those that can only be resolved after the COL is issued.

C Compliance with some of the ITAAC in the enclosure could be assessed concurrently.

The staff would like to discuss with stakeholders this concurrent review and its implications.

R. Simard Please contact Mr. Joseph Sebrosky (COL Project Manager) at 301-415-1132, if you have any questions regarding the enclosure. I expect that there will be at least one category 3 public meeting so that all interested stakeholders can comment on the form and content of EP ITAAC.

Sincerely,

/RA/

James E. Lyons, Program Director New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Project No. 689 cc: See next page

Enclosure:

as stated

R. Simard Please contact Mr. Joseph Sebrosky (COL Project Manager) at 301-415-1132, if you have any questions regarding the enclosure. I expect that there will be at least one category 3 public meeting so that all interested stakeholders can comment on the form and content of EP ITAAC.

Sincerely,

/RA/

James E. Lyons, Program Director New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Project No. 689 cc: See next page

Enclosure:

as stated Distribution: See next page ACCESSION NO. ML033010403-Pkg.

ML033010411-Response Letter ML033010440-Enclosure *See Previous concurrence OFC INT:RNRP PM:RNRP SC: IEPB SPA:RNRP SC:RNRP OGC PD:RNRP NAME DDuvigneaud* JSebrosky EWeiss* JWilson* LDudes* RWeisman* JLyons DATE 12/9/2003 1/28/2004 01/13/2004 12/10/2003 1/5/2004 1/02/2004 1/28/2004 OFFICIAL RECORD COPY

Distribution for Letter to R. Simard dated January 29, 2004 Hard Copy PUBLIC RNRP Rdg JSebrosky LDudes JLyons E-mail JDyer/RBorchardt JCraig BSheron OGC ACRS/ACNW NRR/RNRP MAshley JBlake RGardner CPaulk GMizuno RWeisman JMoore KBarber, OGC DBarss BMusico NIqmbal PQualls TKenyon DCoe MEl-Zeftway

Combination List:

Ms. Marilyn Kray Mr. Charles Brinkman Vice President, Special Projects Westinghouse Electric Co. Exelon Generation Washington Operations 200 Exelon Way, KSA3-E 12300 Twinbrook Pkwy., Suite 330 Kennett Square, PA 19348 Rockville, MD 20852 Mr. Laurence Parme Mr. David Lochbaum, Nuclear Safety Engineer Manager, GT-MHR Safety & Licensing Union of Concerned Scientists General Atomics Company 1707 H Street, NW, Suite 600 P.O. Box 85608 Washington, DC 20006-3919 San Diego, CA 92186-5608 Dr. Gail H. Marcus Mr. Joseph D. Hegner U.S. Department of Energy Lead Engineer - Licensing Office of Nuclear Energy, Science Dominion Generation

& Technology Early Site Permitting Project NE-1, Room 5A-143 5000 Dominion Boulevard 1000 Independence Avenue, SW Glen Allen, VA 23060 Washington, DC 20585 Mr. Edward L. Quinn Mr. Paul Gunter MDM Services Corporations Nuclear Information & Resource Service Utility Operations Division 1424 16th Street, NW, Suite 404 28202 Cabot Road, Suite 205 Washington, DC 20036 Laguna Nigual, CA 92677 Mr. James Riccio Lynn Connor Greenpeace Doc-Search Associates 702 H Street, NW, Suite 300 2211 sw 1ST Ave - #1502 Washington, DC 20001 Portland, OR 97201 Mr. Ron Simard Mr. Paul Leventhal Nuclear Energy Institute Nuclear Control Institute Suite 400 1000 Connecticut Avenue, NW 1776 I Street, NW Suite 410 Washington, DC 20006-3708 Washington, DC 20036 Mr. George Alan Zinke Mr. James F. Mallay, Director Project Manager Regulatory Affairs Nuclear Business Development FRAMATOME, ANP Entergy Nuclear 3315 Old Forest Road M-ECH-683 Lynchburg, VA 24501 1340 Echelon Parkway Jackson, MS 39213 Mr. W. Edward Cummins Mr. Thomas P. Miller AP600 and AP1000 Projects U.S. Department of Energy Westinghouse Electric Company NE-20, Rm. A286 P.O. Box 355 Headquarters-Germantown Pittsburgh, PA 15230-0355 19901 Germantown Road Germantown, MD 20874-1290

175 Curtner Avenue, MC 365 San Jose, CA 95125 USA Mr. Kelly R. Fletcher, Manager Mr. Edward F. Sproat, III Business Development and Advanced Vice President - Intl Projects Technologies Exelon Generation GE Nuclear Energy 200 Exelon Way 175 Curtner Avenue, MC 784 Kennett Square, PA 19348 San Jose, CA 95125 Mr. Vince Langman Mr. Jack W. Roe Licensing Manager SCIENTECH, INC. Atomic Energy of Canada Limited 910 Clopper Road 2251 Speakman Drive Gaithersburg, MD 20878 Mississauga, Ontario Canada L5K 1B2 Mr. Stephen P. Frantz Morgan, Lewis, & Bockius, LLP Dr. Regis A. Matzie 1111 Pennsylvania Avenue, NW Senior Vice President and Washington, DC 20004 Chief Technology Officer Westinghouse Electric Company Mr. Gary Wright, Manager 2000 Day Hill Road Office of Nuclear Facility Safety Windsor, CT 06095-0500 Illinois Department of Nuclear Safety 1035 Outer Park Drive Mr. Ed Wallace, General Manager Springfield, IL 62704 Projects PBMR Pty LTD Mr. David Ritter PO Box 9396 Research Associate on Nuclear Energy Centurion 0046 Public Citizens Critical Mass Energy Republic of South Africa and Environmental Program 215 Pennsylvania Avenue, SE Mr. Dobie McArthur Washington, DC 20003 Director, Washington Operations General Atomics Mr. Tom Clements 1899 Pennsylvania Avenue, NW 6703 Gude Avenue Suite 300 Takoma Park, MD 20912 Washington, DC 20006 Mr. Horace R. Hall, Commercial Manager Vanessa E. Quinn, Section Chief Nuclear Business Team Radiological Emergency Preparedness UCAR Carbon Company, Inc. Branch P.O. Box 2170 Nuclear and Chemical Hazards Division Clarksburg, West Virginia 26302-2170 Federal Emergency Management Agency/DHS Mr. James Blyth 500 C Street SW Canadian Nuclear Safety Commission Washington, D.C. 20472 280 Slater Street, Station B P.O. Box 1046 Ottawa, Ontario K1P 5S9 Dr. Atambir S. Rao Project Manager, ESBWR GE Nuclear Energy