Category:License-Operator
MONTHYEARML23249A1002023-09-0606 September 2023 Requalification Program Inspection ML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23005A1062023-01-0505 January 2023 Requalification Program Inspection ML23017A1122022-12-0505 December 2022 Final QA Related Forms ML22235A7202022-06-14014 June 2022 Administrative Files ML22299A0102022-05-11011 May 2022 Final Qa/Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML20115E4612022-02-14014 February 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22045A9412022-02-14014 February 2022 Senior Reactor and Reactor Operator Initial License Examinations ML22025A3722022-01-25025 January 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21307A2872021-11-0303 November 2021 September 8, 2021, NRC Generic Fundamentals Examination Results for Limerick Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21231A1052021-08-19019 August 2021 Requalification Program Inspection ML21257A4462021-08-18018 August 2021 Final QA Related Forms (Folder 1) ML21105A5352021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Limerick Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21105A6592021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Peach Bottom Atomic Power Station, Units 2 and 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) LG-21-019, 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2)2021-04-0909 April 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21062A1952021-03-0303 March 2021 Revised Written Examination (Parent Questions File) (Regional Audit Corrective Action)(Folder 2) ML21050A0842021-02-19019 February 2021 Final Qa/Related Forms (Folder 1) ML21050A1192021-02-19019 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21050A1812021-02-19019 February 2021 Revised NRC Comments on Draft Licensee-Developed Written Exam (Regional Audit Corrective Action)(Folder 2) ML21050A2272021-02-19019 February 2021 Revised Final Written Examination with Answer Key (401-5 Format)(Regional Audit Corrective Action)(Folder 3) ML21043A2072021-02-12012 February 2021 Handouts to Applicants (Folder 3) ML21043A2202021-02-12012 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21040A4712021-02-0909 February 2021 Revised Form ES-301-5 (Regional Audit Corrective Action)(Folder 1) ML21040A4832021-02-0909 February 2021 Revised Form ES-401-4 (Regional Audit Corrective Action)(Folder 2) ML21012A0542021-01-12012 January 2021 Requalification Program Inspection ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20261H4032020-09-17017 September 2020 Senior Reactor and Reactor Operator Initial License Examinations ML21056A2232020-06-30030 June 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20184A2472020-06-30030 June 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20184A2482020-06-30030 June 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20260H1632020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20260H1642020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20260H1652020-06-30030 June 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20260H1662020-06-30030 June 2020 Draft Written Examination (Folder 2), Test Answer Key ML20260H1672020-06-30030 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21056A2202020-06-30030 June 2020 Final Qa/Related Forms (Folder 1) ML21056A2212020-06-30030 June 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20147A1662020-05-26026 May 2020 Operator Licensing Examination Approval ML20105A1822020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Peach Bottom Atomic Power Station, Units 2 and 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20105A1472020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Limerick Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19325C1432019-11-19019 November 2019 Operator Licensing Examination Approval ML19275E4622019-09-30030 September 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19120A3312019-04-29029 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Peach Bottom Atomic Power Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19107A3822019-04-17017 April 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19079A0232019-03-19019 March 2019 Licensed Operator Positive Fitness-For-Duty Test 2023-09-06
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23017A1122022-12-0505 December 2022 Final QA Related Forms ML22235A7202022-06-14014 June 2022 Administrative Files ML22299A0102022-05-11011 May 2022 Final Qa/Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML20115E4612022-02-14014 February 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22045A9412022-02-14014 February 2022 Senior Reactor and Reactor Operator Initial License Examinations ML22025A3722022-01-25025 January 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21257A4462021-08-18018 August 2021 Final QA Related Forms (Folder 1) LG-21-019, 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2)2021-04-0909 April 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21062A1952021-03-0303 March 2021 Revised Written Examination (Parent Questions File) (Regional Audit Corrective Action)(Folder 2) ML21050A0842021-02-19019 February 2021 Final Qa/Related Forms (Folder 1) ML21050A1192021-02-19019 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21050A1812021-02-19019 February 2021 Revised NRC Comments on Draft Licensee-Developed Written Exam (Regional Audit Corrective Action)(Folder 2) ML21050A2272021-02-19019 February 2021 Revised Final Written Examination with Answer Key (401-5 Format)(Regional Audit Corrective Action)(Folder 3) ML21043A2072021-02-12012 February 2021 Handouts to Applicants (Folder 3) ML21043A2202021-02-12012 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21040A4712021-02-0909 February 2021 Revised Form ES-301-5 (Regional Audit Corrective Action)(Folder 1) ML21040A4832021-02-0909 February 2021 Revised Form ES-401-4 (Regional Audit Corrective Action)(Folder 2) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20261H4032020-09-17017 September 2020 Senior Reactor and Reactor Operator Initial License Examinations ML21056A2212020-06-30030 June 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20184A2472020-06-30030 June 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20184A2482020-06-30030 June 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20260H1632020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20260H1642020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20260H1652020-06-30030 June 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20260H1662020-06-30030 June 2020 Draft Written Examination (Folder 2), Test Answer Key ML20260H1672020-06-30030 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21056A2202020-06-30030 June 2020 Final Qa/Related Forms (Folder 1) ML21056A2232020-06-30030 June 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20147A1662020-05-26026 May 2020 Operator Licensing Examination Approval ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19325C1432019-11-19019 November 2019 Operator Licensing Examination Approval ML19275E4622019-09-30030 September 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19107A3822019-04-17017 April 2019 Senior Reactor and Reactor Operator Initial License Examinations ML18323A3152018-11-19019 November 2018 Operator Licensing Examination Approval ML18128A0062018-05-0707 May 2018 Senior Reactor and Reactor Operator Initial License Examinations RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18116A0542018-04-25025 April 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18067A4302018-03-27027 March 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML18079A5462018-03-27027 March 2018 Final Qa/Related Forms (Folder 1) ML18079A8122018-03-27027 March 2018 Final Qa/Related Forms - Form ES-401-6 and Form ES-401-9 (Folder 1) ML18088A6622018-03-27027 March 2018 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML18088A6642018-03-27027 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18067A4172018-03-0808 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18067A4162018-03-0808 March 2018 Draft Written Examination (Folder 2) 2023-06-27
[Table view] |
Text
J. Caruso & G. Johnson 5/11/05 LIMERICK & PEACH BOTTOM LSRO EXAM OPERATING EXAM COMMENTS Limerick JPMs 0 JPM2700- 1)Confused by initiating cue. Wouldnt the applicant normally prepare this checklist himself? Shouldnt cue indicate - Review the FHDs Checklist provided as the on-coming FHD? 2) Is the intent to have the applicant complete pages 2 and 3 of the checklist? Dont understand task, please explain. 3) Typo step la. ....Rod Block ...4)
Maybe we should provide page 1 without pages 2 and 3 (e.g. the note after step#23 TS 3.9.2 provides one of the answers (at least one with audible alarm in the CR) this really doesnt test understanding - direct look-up). 5) Licensee did not provide handouts for final JPM; also still typo in step l a Handouts received and validated with JPM. Typo fixed e JPM 2701 Stay Time Calculation - This is a very simple math problem doesnt test understanding only ability to do simple calculation. Please attempt to enhance task this is really a GET level question/task not license level. Rich agreed.
JPM significantly improved with additional complexities that discriminate at LSRO level.
0 JPM 2014 CCTAS revision - 1) Please list applicable procedure steps in the standard so that JPM steps and procedure steps can be correlated. 2) step 3.3.5 , writes the approving RE initials at the change... How and when does he get the RESapproval??
Procedure steps added as appropriate. Additional cues added for RE input.
0 JPM 2063 Moving Dummy Fuel Bundle - 1) General Comment for all JPMs - Initiating cue should indicated that the applicant is assigned as the FHD or RPO. Are we going to have an RPO assigned to assist or does the examiner act as the FHD? Who will that person be? 2) Please list applicable procedure steps in the standard so that JPM steps and procedure steps can be correlated. 3) Why arent steps 2, 3, and 4 critical? 4) Cue preceding JPM step #17 provide RE authorized change to the CCTAS for the exam to support cue.
Initiating cues for position being tested added to all applicable JPMs. Cues added as necessary. Steps 2 , 3 and 4 are simply communications and not critical.
0 JPM 2045 Moving Dummy Fuel Bundle from Fuel Pool to Prep Machine - 1) Initiating cue should indicated that the applicant is assigned as the FHD or RPO. 2) Cue- CCTAS not required - why? 3) Why are JPM steps 7, 8 and 13 marked N/A? 4) Please mark JPM step #17 with the applicable procedure step, 3.1 3.3.
Initiating cues added. Discussed CCTAS requirements with licensee and agree not required for this move. JPM steps 7,8 and 13 done by FHD, not applicant (RPO).
0 JPM 2029 Install Rod Pos. Test Box - 1) Is this a required task for LSROs - who normally performs this task? 2) Is this task really safety significant 3) What are we really testing with this task?
Confirmed task is LSRO applicable. If task done incorrectly could result in Tech Spec violation.
0 JPM 2060 Respond to Alarm - no comments.
0 JPM 2053 Response in unexpected rise in SRM count rate, JPM steps f and g critical??
After discussions determined steps f abd g not critical.
0 JPM 2061 Transfer Spent Fuel in Pool, Response to Dropped Fuel 1) Initiating cue add the word ....seven spent fuel bundles...2) Why are JPM steps 2-6 and 9-13 N/A? 3)
Who is the spotter for this JPM? 4) How would he normally contact the SSV?
Added spent to cues. Steps 9-73 not done by applicant. Spotter is a third person (not being examined) 0 JPM 2062 EAL Classification - very similar to the PB EAL call can one of these calls be modified??
Although the initiating event for each is a decreasing fuel pool level, it was determined this was acceptable since Limerick EAL is based on Rad Levels with a resulting ALERT and PB based on Fuel Pool Level with a resulting UE .
Peach Bottom JPMs JPM NLSR03037 Semi-Automatic Fuel Transfer within Spent Fuel Pool 1) Step 9 will the dummy fuel actuate the hoist loaded light? 2) Didnt see the copy of the approved CCTAS for transfer.
Determined hoist loaded light will light. Final CCTAS will be provided after RE on security agreement.
JPM 3019 Fuel Move within Spent Fuel Pool - Hoist Loaded light Extinguished 1) JPM Step 1 why are you starting in the right location instead of having applicant position the bridge?
Set up changed to have bridge moved away from final location JPM NLSR03048 Functional Test of Refuel Interlocks 1) Is this an LSRO JTA didnt see it on the list - is this really performed by LSROs or at an least RO task or do I&C do this (Rich said okay if RO task)? 2) I assume this is all simulation but the JPM says candidate lifts leads?? Ex. JPM step 2.
Determined this is an LSRO task. JPM changed to clearly indicate the lead lifting is simulated.
JPM 3049 This JPM is very simplistic and doesnt test LSRO understanding there is really only one critical step to turn the ARM off and check downscale and white light illuminated.
This JPM was replaced with one involving FHD turnover checklist. Replacement JPM is discriminatory at LSRO level. Verified against OP-PB-112-101-1011. Will
validate the morning of the exam before any applicants go up on bridge.