Licensee Response to - NRC Integrated Inspection Report Nos. 05000338, 339/2005004 - North Anna Power Station Units 1 & 2
ML060250618
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 01/25/2006
From: Landis K
NRC/RGN-II/DRP/RPB5
To: Grecheck E
Virginia Electric & Power Co (VEPCO)
References
IR-05-004
Download: ML060250618 (3)


See also: IR 05000338/2005004

Text

January 25, 2006

Virginia Electric and Power Company

ATTN: Mr. Eugene S. Grecheck

Vice President

Nuclear Support Services

Innsbrook Technical Center - 2SW

5000 Dominion Boulevard

Glen Allen, VA 23060-6711

SUBJECT: LICENSEE RESPONSE TO - NRC INTEGRATED INSPECTION REPORT NOS.

05000338, 339/2005004 - NORTH ANNA POWER STATION UNITS 1 & 2

Dear Mr. Grecheck:

This refers to your response dated December 9, 2005 to NRC Inspection Report Nos.

05000338, 339/2005004, that was issued on October 28, 2005. Please be informed that we are

reviewing your disagreement with some of the conclusions that were identified in the inspection

report. Specifically, you disagree with our conclusions that the issues associated with flood

protection measures and main turbine auto stop interface valve oil leakage contain aspects

relating to the cross-cutting area of problem identification and resolution. Also, you disagree

with the issues associated with breaker 2-QS-P-1B and Solid State Protection System channel

testing containing aspects relating to the cross-cutting area of human performance.

Additionally, you disagree with the minor violation associated with inadequate corrective actions

for the Unit 1 Turbine Driven Auxiliary Feedwater pump.

The NRC is reviewing the basis for your disagreement, and upon completion of our review, will

advise you of our results by separate correspondence.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

VEPCO 2

Should you have any additional questions, please contact me at (404) 562-4510.

Sincerely,

/RA/

Kerry D. Landis, Chief

Reactor Projects Branch 5

Division of Reactor Projects

Docket Nos.: 50-338/339

License Nos.: NPF 4, NPF 7

cc: C. L. Funderburk, Manager Executive Vice President

Nuclear Licensing and Old Dominion Electric Cooperative

Operations Support Electronic Mail Distribution

Virginia Electric and Power Company

Electronic Mail Distribution County Administrator

Louisa County

Jack Davis P. O. Box 160

Site Vice President Louisa, VA 23093

North Anna Power Station

Virginia Electric and Power Company Lillian M. Cuoco, Esq.

Electronic Mail Distribution Senior Nuclear Counsel

Dominion Nuclear Connecticut, Inc.

Donald Jernigan Electronic Mail Distribution

Site Vice President

Surry Power Station Attorney General

Virginia Electric and Power Company Supreme Court Building

Electronic Mail Distribution 900 East Main Street

Richmond, VA 23219

_________________________

OFFICE DRP:RII

SIGNATURE BBD

NAME BDesai

DATE 01/25/2006

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO