Enclosure, Hatch, Inspection/Activity Plan, Report 22 - 03/01/2009 - 06/30/2010
ML090630144
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/04/2009
From:
Division Reactor Projects II
To:
Shared Package
ML090630128 List:
References
Download: ML090630144 (3)


Text

Page 1 of 2 Hatch 03/04/2009 09:17:02 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL EXAM PREP 6 1 03/30/2009 04/03/2009 V23311 HATCH/APRIL 2009 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 4 1 04/20/2009 04/24/2009 V23311 HATCH/APRIL 2009 EXAM AT POWER FACILITIES EB1-CDBI - COMPONENT DESIGN BASIS INSPECTION 9 1, 2 04/20/2009 04/24/2009 IP 7111121 Component Design Bases Inspection 1, 2 05/04/2009 05/08/2009 IP 7111121 Component Design Bases Inspection 1, 2 05/18/2009 05/22/2009 IP 7111121 Component Design Bases Inspection 1, 2 06/01/2009 06/05/2009 IP 7111121 Component Design Bases Inspection OL EXAM - INITIAL EXAM - WEEK 2 4 1 04/27/2009 05/01/2009 V23311 HATCH/APRIL 2009 EXAM AT POWER FACILITIES PI&R - PRE INSPECTION 1 1, 2 08/31/2009 09/04/2009 IP 71152B Identification and Resolution of Problems PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 6 1, 2 10/05/2009 10/09/2009 IP 71152B Identification and Resolution of Problems 1, 2 10/19/2009 10/23/2009 IP 71152B Identification and Resolution of Problems OL EXAM - INITIAL EXAM PREP 7 1 10/05/2009 10/09/2009 V23320 HATCH/OCTOBER 2009 EXAM AT POWER FACILITIES PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 10/12/2009 10/16/2009 IP 7111401 Exercise Evaluation 1, 2 10/12/2009 10/16/2009 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 10/12/2009 10/16/2009 IP 71151 Performance Indicator Verification OL EXAM - INITIAL EXAM - WEEK 1 5 1 10/26/2009 10/30/2009 V23320 HATCH/OCTOBER 2009 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 5 1 11/02/2009 11/06/2009 V23320 HATCH/OCTOBER 2009 EXAM AT POWER FACILITIES PSB1-RP - RP PUBLIC RADIATION PROTECTION BASELINE 3 1, 2 01/25/2010 01/29/2010 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 1, 2 01/25/2010 01/29/2010 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1, 2 01/25/2010 01/29/2010 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1, 2 01/25/2010 01/29/2010 IP 71151 Performance Indicator Verification PSB1-RP - RP GROUNDWATER PROTECTION 1 1, 2 02/01/2010 02/05/2010 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative EB3 HS - HEAT SINK INSPECTION 1 1, 2 02/22/2010 02/26/2010 IP 7111107T Heat Sink Performance This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Hatch 03/04/2009 09:17:02 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RP ACCESS CONTROLS 1 1, 2 03/08/2010 03/12/2010 IP 7112101 Access Control to Radiologically Significant Areas EB1-MODS - MODIFICATIONS-10CFR50.59 2 1, 2 05/17/2010 05/21/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 05/24/2010 05/28/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 1 of 1 07200036 - SOUTHERN NUCLE 03/04/2009 09:27:48 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ISFSI - ISFSI PREOPERATIONAL INSPECTION 1 1 06/01/2009 07/15/2009 IP 60854 Preoperational Testing Of An ISFSI ISFSI - ISFSI PAD CONSTRUCTION 2 1 04/01/2010 06/30/2010 IP 60853 On-Site Fabrication Of Components And Construction On An ISFSI This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure