Plant Issue Tracking, Crystal River Information for 10/7/09
ML100750274
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/07/2009
From:
NRC/RGN-II
To:
References
FOIA/PA-2010-0010
Download: ML100750274 (2)


Text

Mooify Plant Issue Page I of 2 Crystal River Information for 10/07/2009 (Modify/Update)

Unit 3 status: (no commas, please) iMode 6; GREEN RCS Leak:

9:15mtg. C Yes 6- No Routine Activities / TS Activities:

Significant TS / Issues:

9:15mtg. C Yes

  • No 5F add attachment Risk Significant / Emergent Activities:

The plant is in mode 6, green risk. Reactor head is removed and the water level is 158 feet (23 feet above RV flange) and 101F. Fuel in vessel with time to boil at 367 minutes. The equipment hatch is open. Defueling scheduled to start today at 1100. Schedule shows 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> for complete defuel.

Containment Hydro-demolition of concrete was completed. Licensee planning to perform a modification to support outside lift system as a result crack identified in concrete. A root cause investigation is in progress. Sargent and Lundy is involved with the investigation and corrective actions.

9:15mtg.( Yes C No ..

add ahtachmeat Findings and Observations:

9:15 mtg. C" Yes ( No Site Visits:

A. Alen onsite for 5 week training rotation.

R. Chou is onsite with his SGR team.

Chairman visit planned for October 9th.

http://r2.nrc.gov/webapps/pita/Modifylssue.cfm?iid=15296&sname=Crystal River 10/20/2009

Modify0Plant Issue Page 2 of 2 9:15mtg. C Yes (I No [?

add attachment Other:

9:15mtg. C Yes 0 No update01 Last updated: 10/07/2009 19:02 AM http://r2.nrc.gov/webapps/pita/Modifylssue.cfm?iid= 15296&sname=Crystal River 10/20/2009