Williams Q&A- Request 24 - Q18 RFO15-IWE Exam Liner UT
ML102720821
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/30/2009
From:
Progress Energy Florida
To:
Office of Information Services
References
FOIA/PA-2010-0116
Download: ML102720821 (6)


Text

Facility:.

CR3 WR Originator:

Unit 3

W/0 Type:

PM nner :

BAK Title W/O Task Title Task Dspln CRYSTAL RIVER PLANT NUCLEAR BATCH Project TSK PRI:

3 W/O Dspln:

N ERG BAKER G A E,

SP0182.

RB STRUCT INTEG TENDON SU Q,OM, CONTAINMENT LINER PLATE, PERFO RM UT INSPECTION Q

Q Due By:

09/01/06 Wnrk nrder Pncknag 00681043 09 R-t TTPMCII Date:

11/22/07 i lI~rI lrIi 111 1111 HllIllll liiil III Page:

1 Wnrk Modir Tnck Written Tn Facility CR3 Equipment Work Item Equip. Tag:

Catalog ID:

Name CONTAIN]

Location Crew QIG Resource Type:

PER Cost Centr:

60624D P

centage:

100.000 Proj Unit 3

Component:

Eqt. List:

Alt:

Job Type:

PM Sys:

PMT:

N Review Reqd:

UCR: D UTC :

N MFENT LINER PLATE RB S Resource Code:

QCON Acct No.

Network

Reference:

Qty:

2 Duration:

00 20016571 W0403 2

NurelIar Informatinn RWP Required N

Contain Closure :

N Doc Pkg :

A Mode:

Contain Integrity:

N Q Group QA Grade:

Train Status NCR WArk rdaerYc k InCUonS WORK INSTRUCTIONS:

PERFORM PRE JOB BRIEF IAW AI0607.

DRAW A SIMPLE GRID OF 4 QUADRANTS AND DETERMINE THE AVERAGE LINER THICKNESS READING PER QUADRANT.

PERFORM UT PER NDEP 0427 GUIDELINES.

PROVIDE DATA REPORTS TO RICK PORTMANN LISTING DIMENSIONS (LENGTH

& WIDTH)

ELEVATION AND AZIMUTH FOR EACH UT AREA EXAMINED.

UMENT ALL WORK PERFORMED IN COMPLETION COMMENTS OF THIS W.O.

TASK.

SCAN THE APPROPRIATE SUBTASK BARCODE TO LOG ONTO THE RWP LISTED IN THE REQUIRMENTS/PERMITS SECTION

Facility:

CR3 CRYSTAL RIVER PLANT NUCLEAR WR Or-iginator:

BATCH Unit:

3 Project Wnrk Olrder Package' W/O Type:

PM TSK PRI:

3 W/O Dspln:

N anner :

BAKERG BAKER G A 00681043 09 Title E, SP0182, RB STRUCT INTEG TENDON SU W/O Task

Title:

Q,OM, CONTAINMENT LINER PLATE, PERFO MASTER RM UT INSPECTION Rpt :

TIPMC11 Task Dspln Q

Due By:

09/01/06 Date:

11/22/07 11111111111r I lll ll iii MIAll ll iliiI Page:

2 Wnrk rlrder Tas.k Instraptions Ra wnrk/A401ra val Deficiency Tag No.:

Loc:

Tag Removed:

ReWork Job N

Comments:

Task EnLirammnts REG/REQ VALUE COMMENTS CR3 CLR REQ N

CR3 ISI Y

CR3 LCO N

CR3 NDE REQ Y

UT CR3 0C Y

CR3 REAC MGMT N

CR3 RWP Y

RPR,R15 CR3 RWP NBR 3824 QC ACTIVITIES IN RB CR3 WORK REL N

NOTIFY OWC PRIOR TO WORK START Atithnrizatian Start Permission Date:

Failarpl/Action Takan/Ag Fo&und Failure Category Code (F/NF)

Action Taken Category Code:

As Found Sub Category Code: (1-5) ii'i

Facility:

CR3 CRYSTAL RIVER PLANT NUCLEAR WR Originator:

BATCH Unit 3

Project

1 Wnrk Order Paekage W/O Type:

PM TSK PRI:

3 W/O Dspln:

N anner :

BAKERG BAKER G A 00681043 09 Title E,

SP0182, RB STRUCT INTEG TENDON SU W/O Task

Title:

QOM, CONTAINMENT LINER PLATE, PERFO MASTER RM UT INSPECTION Rpt : TIPMC11 Task Dspln Q

Due By:

09/01/06 Date:

11/22/07 Page:

3 Wark Cpmplatign ituwsre Name Function/Dept.

Date Comments:

67- -e'&te -*-,'

71"4~m~'4-ea~5~-

ftwark ReasonnlCarua COMPONENT FAILED W

INCOMPLETE WORK FROM MAINTENANCE REWORK Date:

Comments:

Completion Cnmments on Work Parformad Completion Comments Required Y

Comments:

Comments:

Facility:

CR3 CRYSTAL RIVER PLANT NUCLEAR WR Originator:

BATCH Unit 3

Project W/O Type:

PM TSK PRI:

3 W/O Dsplr anner :

BAKERG BAKER Title E,

SP0182, RB STRUCT INTEl Task

Title:

Q,OM, CONTAINMENT LINER P N

G A G TENDON SU LATE.

PERFO 9/01/06 Work Order Package 00681043 09 MASTER Rpt :

TIPMC11 Date:

11/22/07 RM UT INSPECTION Q

Due By:

0 Task Dspln I

liii 111111 1Q11l l iri ll f J liJ l i i IIII llll Page:

4 U-.

Camnkatlnn rnmmpntsq an Work Perfarmad Completion Comments Required Y

Comments:

All Sontinued on Additional Sheets? :

4 I

END OF REPORT

      • I*

I II I I I Faci'lity:

CR3 Unit.

3 W/O'Type:

PM P-lanner :

KARG 0 Title Task

Title:

Written To Task Dspln CRYSTAL RIVER PLANT NUCLEAR ED Project :

Priority:

W/O Dspln:

N KARGEL D C E, SP0182, RB STRUCT INTEG TENDON SU Q,OM CONTAINMENT LINER PLATE.

PERFO RM UT INSPECTION Wnrk Order Parkae 00681043 09 Rpt :

TIPMCIA Date:

11/22/2007

-Q Completed By:

I Iliil 111111 111111 BII II lllrIrllhl l II Ill Page:

1 PM R41*tAd Tnfnrmnnt nn PM Early Date:

06/02/05 PM Late Date:

12/01/07 PM Frequency Code:

5Y PM Frequency Days:

1825 PMID-RQ:

00029859 01 I

END OF REPORT

  • I***

I

QA.UT:8Rev 7 Progress Energy CNGG NDE Report # 2007-0142 Page 1 of 1

DIGITAL ULTRASONIC 'TTICKNESS NDE REPORT Plant: 0 BNP 0 CR3

] HNP " RNP WO(._W-Ufnit: EL 1 - 2 (D 3 Date: 11/22/07 Component I Item Tested: Containment Liner dockwiseof hatch 130 elevation bulges NDE Procedure:

3a, 3b, 3c No.:

427 Rev: 7 TR: N/A Component Material:

Expected 0 C/S SA-106

[1 SIS N/A

[I Other (Specify):

N/A Nominal T Range:

j.-1,00" Type Thickness Gauge:

Couplant:

Mfg.: Panametrics Model:36pDL Plus S/N: 002211211 Software Rev. No.:2.07/1.20N Brand: Sonotech Batch No.: 06120E Calibration i Reference Std.:'

L Test Item-Mic./Caliper No.: N/A Primary Cal. Thickness:.1"-1.00' 0$Step BlockS/N:

.QCl118 N C/S 0 S/S El Other (Describe Below)

Cal. Check Thickness:

.tX-1.00" Transducer:

Mfg.: Panametrics Model: D-791-RM S/N: 10052237 Diameter:.314 Freq,: 5 MHz L Single

[

Dual Component Conditions:

Inst. Receiver Gain Setting 35 dB Other Test Conditions: N/A High Temp:

0 Yes 0 No Technique: [0 Single-Echo g Thru-Coat

  • 7-10 mils of SL1 coating on liner plate Coated / Painted: 0 Yes*

0 No Li Multiple-Echo 1-

-tZ*$'

Sketch component or item arid area tested. Indude thickness data.

Varied gain to 80% Full Screen Height. UT done through paint. Requested by engineering to UT containment liner plate at bulge areas 3A. 38 and 3C. Bulge area was identified, bounded and sectioned in quadrants and an average thickness recorded for each quadrant.

wo rze

~d4x-&foAvj /

,e A

Px-l'x""4 TN jap7'

/

-/L/o 7 0BULGE AREA 3A i;,w X 12" BULGE AREA 3B 36'X 12" BULGE AREA 3C 24'X 12' ft-el

,-?&9* &s-;:ril

~'

f~'~a,~-

Ar Li,-~it I

Inspector Kevin M. Kenyon Certification Level I Ltd. A-Scan Date 11/22/07 Inspector NIA Certification Level N/A Date N/A Reviewed By (If Required) i Date NGGM-PM-001 1 APPEND6,A/r