FM 6.5 Exhibit 6 Page 1 of 3
-DOCUMENT NUMBER: CR-Ni002-504 REVISION:
1 PAGE:
49 DOCUMENT TITLE:
FINAL REPORTýFOR THE'30T YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE:
30TH YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 02/04/2009 Progress Energy B22.5 3.09 3.0H2.655 574 04 122.57 01 E
BT4 p2.5,34
,Z, :<<*
4
""4s T
2E5 2.65 51534 i
6.19 1.19 120.88 0.98 YES BT1 25 3,54 BT2 2 1.5 3.0 42H 5.5 39.71 3.21 116.41 2.5 YES BT 5 23 39,71,
- '*1**
- :,**
BT 4 625 73.34 D238 695 73.34 3.84 102259 3174 YES BT 6 7
0
-T
-ý 6--5
- =
pthe Freedolli 0t InWTSnOdM A
)g
FM 65 Exhibit 6 Page 2 of 3 DOCUMENT NUMBER:
DOCUMENT TITLE:
PROJECT TITLE:
CR-N1002-504 REVISION:
1 PAGE:
50 FINAL REPORT FOR THE 30M YEAR CONTAINMENT IWL INSPECTION 3 0TM YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 02/04(2009 Pwess Energ 13H33 BT 1 BT 3 2
2 4
2.65 2.65 5.3 1
1,3 121.57 1 1.06 YES BT 1 2
2.65 13H35 53 13 121.77 1.06 YES BT3 2
2.65 BT1 2
2.65 13H38 4
5.3 1.3 121.53 1.06 YES BT 3 2
2.65 BT 4 2
2.65 46H20 5.3 1.3 121.37 1.07 YES BT 6 2
2.65 BT 4 2
2,65 461H23 4
5.3 13 122.63 1.06 YES BT 6 2
2,65 46H20~
4 2.5 1.3 121,37 1437 YES
~BT 6 2
2.65
FM 6.5 Exhibit 6 Page 3 of 3 DOCUMENT NUMBER; CR-N1002-504 REVISION:
1 PAGE:
51 DOCUMENT TITLE:
FINAL REPORT FOR THE 30T YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE:
30"' YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATEý 02/04/2009 Progre*s
'BT62 2
2.65 B T2 2
2.65:;I BT2 2
"2.65*
62H34 45 5.3(
0803 12207
- 0765 YES BT2 2
2.65 LIE
-A-C-P-If a large amount of grease is lost during the inspection, then grease must be replaced by pressure pumping it back into the tendon duct.