MONTHYEARML24018A0862024-02-0101 February 2024 Examination Confirmation Letter No. 50-288/Ol-24-02, Reed College ML24017A0312024-01-18018 January 2024 Reed College, Examination Confirmation Letter 50-288/Ol-24-01 ML23289A1562023-10-25025 October 2023 Reed College 2022 Financial Test for Self-Guarantee for Decommissioning Funding ML23263B1622023-09-20020 September 2023 Reed Research Reactor 2022-2023 Annual Report ML23163A0132023-07-18018 July 2023 Examination Result Letter No. 50-288/OL-23-03, Reed College ML23163A0122023-07-18018 July 2023 Examination Report Letter No. 50-288/OL-23-03, Reed College ML23165A2312023-06-14014 June 2023 Reed Research Reactor (Docket No. 50-288/License No. R-112) 2022 Financial Assurance Update ML23139A1322023-05-16016 May 2023 Reed Research Reactor (Docket No. 50-288/License No. R-112) 2022 Financial Assurance ML23053A2402023-03-0606 March 2023 Examination Confirmation Letter No. 50-288/OL-23-03, Reed College ML23024A1732023-02-27027 February 2023 Examination Confirmation Letter No. 50-288/OL-23-02, Reed College ML23020A9372023-01-20020 January 2023 Reed College, Letter Intended to Fulfill the 14-day Written Report Requirement of Technical Specification 6.7.2, Special Reports, Following Operation in Violation of Limiting Conditions of Operation ML22241A1382022-09-0606 September 2022 Us Nuclear Regulatory Commission Staff Review Re Reed College 2021 Financial Test for Self-Guarantee for Decommissioning Funding ML22230B8022022-08-18018 August 2022 Annual Report for Reed College (Docket 50-288, License No. R-112) for the Period July 1, 2021 Through June 30, 2022 ML22229A5632022-08-17017 August 2022 Reed Research Reactor 2021-2022 Annual Report ML22199A2932022-07-28028 July 2022 Examination Confirmation Letter No. 50-288. OL-23-01, Reed College IR 05000288/20222022022-06-15015 June 2022 Reed College - U.S. Nuclear Regulatory Commission Routine Safety Inspection Report No. 05000288/2022202 IR 05000288/20222012022-06-14014 June 2022 Cover Letter - Reed College Nuclear Regulatory Commission Inspection Report No. 05000288/2022201 (Public) ML22019A1022022-02-0707 February 2022 Examination Confirmation Letter No. 50-288/OL-22-02, Reed College ML21258A3962021-10-0404 October 2021 U. S. Nuclear Regulatory Commission Staff Review Re Reed College 2020 Financial Test for Self-Guarantee for Decommission Funding NRC Ltr Rrr 2020 Financial Self Guarantee Draft ML21242A2362021-09-0808 September 2021 Reed College Regarding U.S. Nuclear Regulatory Commission Staff Review and Approval of the Revised Reed Research Reactor Requalification Plan ML21224A2032021-08-16016 August 2021 Examination Confirmation Letter No. 50-288/OL-22-01, Reed College ML21216A4392021-08-0404 August 2021 Reed College - Reed Research Reactor, Annual Report, July 1, 2020 - June 30, 2021 ML21174A1942021-06-23023 June 2021 Revised Reed Research Reactor Requalification Plan in ML21160A1792021-06-0808 June 2021 Reed College, Submitting Information Inadvertently Omitted from Letter Dated October 28, 2020 (ML21014A437) ML21202A1792021-06-0808 June 2021 Reed College - Submitting Information Inadvertently Omitted from Letter Dated October 28, 2020 (ML21014A437) IR 05000288/20212012021-06-0303 June 2021 Reed College U.S. Nuclear Regulatory Commission Routine Safety Inspection Report 05000288/2021201 ML21028A0922021-01-27027 January 2021 Examination Confirmation Letter No. 50-288/OL-21-02, Reed College ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20304A3152020-10-28028 October 2020 Self-report of a Violation of Reed Research Reactor'S Requalification Plan ML21014A4372020-10-28028 October 2020 Reed College - Financial Assurance for Reed Institute Dba Reed College and Financial Statements for the Reed Institute June 30, 2020 and 2011 9 ML20290A6802020-10-27027 October 2020 U.S. Nuclear Regulatory Commission Staff Review Reed College 2019 Financial Assurance (Self-Guarantee)(EPID No. L-2019-LLL-0034 ML20265A3972020-09-21021 September 2020 Reed College - Response to Notice of Violation 05000288/2020201 ML20266G5442020-09-21021 September 2020 Reed College - Change of Management Staff ML20247J6032020-09-0303 September 2020 Examination Confirmation Letter No. 50-288/OL-21-001, Reed College IR 05000288/20202012020-09-0202 September 2020 Reed College - U.S. Nuclear Regulatory Commission Routine and Confirmatory Order Follow-Up Inspection Report No. 05000288/2020201 ML20216A6772020-08-0303 August 2020 Reed Research Reactor Annual Report July 1, 2019 -- June 30, 2020 (Rev. 1) ML20189A3002020-07-0808 July 2020 Completion of Required Actions Under Confirmatory Order EA-19-071 Related to U.S. Nuclear Regulatory Commission Investigation Reports 4-2016-022 and 4-2017-023 ML20175A8322020-06-23023 June 2020 Reed College - Change of Management Staff ML20162A1902020-06-10010 June 2020 Reed College - Actions Under Confirmatory Order EA-19-071 ML20136A4062020-04-27027 April 2020 Transmittal of Proposed Security Plan at Reed College ML20098F1312020-04-0202 April 2020 NRC Reed TR 20200402 Request for Rvw Officials Ellis and Sams 4.2.20 ML20108F5312020-04-0101 April 2020 Reed College, Notification of Personnel Change Update ML20010G1772020-01-14014 January 2020 Examination Confirmation Letter No. 50-288/OL-20-02, Reed College ML19317D7912019-10-30030 October 2019 Financial Assurance and Financial Statements for the Reed Institute June 30, 2019 and 2018 ML19282A3882019-10-0202 October 2019 Reed College - Requesting Termination of Quality Assurance Program Approval Form for Radioactive Material Packages No. 0949, Revision 0, Docket No.71-0949 IR 05000288/20192012019-08-16016 August 2019 Reed College - U.S. Nuclear Regulatory Commission Security Inspection Report 05000288/2019201 ML19225C1642019-07-31031 July 2019 Transmittal of Security Plan at Reed College ML19211C0072019-07-24024 July 2019 Reed College, Transmittal of Annual Report July 1, 2018 - June 30, 2019 ML19155A1752019-06-13013 June 2019 U.S. Nuclear Regulatory Commission Staff Review Reed College 2018 Financial Assurance (Self-Guarantee) Docket No. 50 288 ML23130A2532019-04-29029 April 2019 Reed College, Management Change Update 2024-02-01
[Table view] |
Text
MA REED COLLEGE REACTOR FACILITY 3203 Southeast Woodstock Boulevard September 21, 2011 Portland, Oregon 97202-8199 Document Control Desk telephone U.S. Nuclear Regulatory Commission 503/777-7222 Washington, DC 20555-0001 fax Docket: 50-288 503/777-7274 License No: R- 112 e..uil RE: Clarifications in Response to phone calls on July 7, 2011, and July 15,2011 reactor@reed.edu web The following is a clarification as requested in phone calls on July 7, 2011 and http://reactor.reed.edu July 15, 2011.
RIA 36. Demonstrate that there is no room-to-room leakage that results in an inhalation exposure to an individual in the psychology building. Confirm that the assumptions are sufficiently conservative. Link the evacuation time in the Emergency Plan to the postulated doses.
RRR response:
The reactor facility is connected to the psychology building via a single door.
Additionally, there are 4 intervening spaces and a flight of stairs prior to the connecting door. During normal ventilation operations, the leak rate from the psychology building into the reactor facility was measured using TSITM VelociCalc calibrated Sept 2010. The leak rate around the closed locked door ranged from 3 cfm to 300 cfm (0.001-0.142 m 3/s). When the ventilation system is operating in isolation mode, the leak rate into the reactor facility will increase. If both the psychology building and the reactor facility lose power to their respective HVAC systems, there is no pressure differential to drive room-to-room leakage.
Any room-to-room leakage would be the result of random motion.
However in the unlikely event that the cladding on a single fuel element fails in air and the air flow reverses direction, i.e. air leaks from the reactor facility into the psychology building, the total effective dose equivalent resulting from room to room leakage to an individual standing at the connecting doorway was estimated using two leak rates. The TEDE for varying exposure durations are in the Table 1.
Table 1. The TEDE for varying exposure durations Leak 0.00154 m 3/sec 0.142 m3/s rate: 3.26 ft3/m 300 ft3/m Time (mrem) (mrem) 1 minute 9.01E-15 4.92E-7 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 5.82E-6 0.128 J day 1.66 3.09 1 week 21.6 21.6 30 days 92.6 92.6 10 CFR 20 requires the general population TEDE to be below 100 mremlyear and less than 2 mrem in an hour. A fuel cladding failure in air at Reed College cannot generate 2 mrem in a single hour dose at the connecting door between the reactor facility and the psychology building. Additionally, the 100 mrem threshold is reached at 32 days. Based on these estimated doses, immediate evacuation of the psychology building is unnecessary. Table 2 contains duration of exposure to reach regulatory limits for the general population.
Table 2. Exposure time required to reach regulatory dose limits for the general public as a result of a cladding failure in air.
0.00154 m3 /sec 0.142 mj/s Leak rate: 3.26 ft3/m 300 ft3/m 2 mrem 26.18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> 15.56 hours6.481481e-4 days <br />0.0156 hours <br />9.259259e-5 weeks <br />2.1308e-5 months <br /> 100 mrem 32.39 days 32.39 days Methodology and Assumptions The following assumptions were used:
" The cladding failure occurs at time=0 and the individual is continuously standing at the doorway.
" The rooms between the reactor bay and the stairway were modeled as a series of ideal continuous stirred-tank reactor (Levenspiel 1999).
o The exiting concentration of the isotope is assumed to be the average concentration of the isotope, in the space.
- The source term is the highest burned element as described in the May 2011 response to the request for additional information.
- The concentration for the isotope of interest was converted into TEDE using DOE /EH-0071.
- The model does not take credit for radioactive decay, which would further reduce the postulated dose.
- Locations and room designations are consistent with Figure 1 of the RRR Security Plan' dated (07/22/09).
- Table 3 contains abbreviations and parameters used to estimate the dose.
The equation used to determine the concentration of each isotope at the connecting door is:
CicD(t) = Ci,B (1 - e-J )(1--
- e-ITcR - e-' IT, )(1 - e-"Tc )(1 - e-1TBR C=concentration of the isotope i=isotope of interest It = the time from the initiation of the event Tr = the residence time where V
Q V = free air volume Q = leak rate Table 3. Abbreviations and parameters used for estimating the dose to an individual located at the connection door.
Abbreviation Location Free Residence time Residence time volume Q=0.00154 m 3/sec Q=0.142 m3/sec (m3 (seconds) (seconds)
CD Connecting door - G -
B Reactor bay - C008 300 194805 2113 CR Control room 59 C006 38312 415 H Exit Hallway 43 27922 303 C Classroom C005B 100 64935 704 BR Break room +Lab +Sump 67 C003+C004+C005 43506 472 Chemical Reaction Engineering, 0. Levenspiel, John Wiley & Sons, 1999.
"Internal dose conversion factors for calculation of dose to the public," DOE/EH-0071, U.S. Department of Energy, Washington, D.C., 1988 I declare under penalty of perjury that the foregoing is true and correct.
Executed on 4K Z/ 2.41/
Melinda P. Krahenbuhl, Ph.D.
Director, Reed Research Reactor.