Letter Sequence Draft Other |
---|
|
|
|
Similar Documents at Salem |
---|
Category:License-Operator
MONTHYEARML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23208A2462023-05-23023 May 2023 Final QA Related Forms ML22175A2012022-03-30030 March 2022 Final QA Related Forms (Folder 1) ML22207B8342022-03-30030 March 2022 Form ES-201-2 (Folder 1) ML22116A1922022-03-30030 March 2022 Post Exam Comments and NRC Resolutions (Folder 1) ML22175A1682022-02-11011 February 2022 Final Written Examination and Operating Test Outlines (Folder 3) ML22175A1522022-02-11011 February 2022 Amended Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML22175A1892022-02-11011 February 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22175A1932022-02-11011 February 2022 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML22116A1772022-02-11011 February 2022 Final Operating Test (Sections a, B, and C) (Folder 3) ML22116A1822022-02-11011 February 2022 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML22175A1742022-02-11011 February 2022 Handouts to Applicants (Summary) (Folder 3) ML22175A1782021-11-29029 November 2021 Draft Written Examination (Folder 2) ML22175A1772021-11-29029 November 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML22175A1972021-11-18018 November 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML22175A1942021-09-23023 September 2021 NRC Comments on Draft Licensee-Developed Operating Test Outlines (Folder 2) NTD-21-060, Draft Written Examination and Operating Test Outlines (Folder 2)2021-09-0303 September 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2702021-01-12012 January 2021 Final Qa/Related Forms (Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20301A6322020-10-27027 October 2020 Handouts to Applicants (Folder 3) ML20300A5562020-10-26026 October 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20297A3062020-10-23023 October 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20297A2792020-10-23023 October 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20296A4302020-10-22022 October 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20296A4322020-10-22022 October 2020 Draft Written Examination (Folder 2) ML20279A4372020-10-13013 October 2020 September 9, 2020, NRC Generic Fundamentals Examination for Salem Nuclear Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20240A3182020-08-27027 August 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20240A3222020-08-27027 August 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19289C4412019-10-15015 October 2019 September 4, 2019, NRC Generic Fundamentals Examination Results for Salem Nuclear Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19211C2552019-07-30030 July 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML19004A1222019-01-0303 January 2019 Initial Operator Licensing Operating Test Approval ML18135A2482018-05-21021 May 2018 Draft Written Examination (Folder 2) ML18135A2162018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML18135A3012018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) NTD-18-043, Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18107A2302018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Salem Nuclear Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18135A2252018-03-20020 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18074A0522018-03-0909 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18074A0552018-03-0909 March 2018 Final Operating Test (Section a, B, and C) (Folder 3) ML18134A1372018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 SRO (Folder 1) ML18074A0542018-03-0909 March 2018 Handouts to Applicants (Folder 3) ML18134A1282018-03-0909 March 2018 Final Qa/Related Forms (Forms 1) ML18149A4942018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 RO (Folder 1) ML18074A0532018-03-0909 March 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18025A8582018-01-22022 January 2018 Initial Operator Licensing Written Examination Approval ML18017A8212018-01-17017 January 2018 Initial Operator Licensing Test Approval 2023-08-21
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23208A2462023-05-23023 May 2023 Final QA Related Forms ML22116A1922022-03-30030 March 2022 Post Exam Comments and NRC Resolutions (Folder 1) ML22207B8342022-03-30030 March 2022 Form ES-201-2 (Folder 1) ML22175A2012022-03-30030 March 2022 Final QA Related Forms (Folder 1) ML22175A1742022-02-11011 February 2022 Handouts to Applicants (Summary) (Folder 3) ML22116A1772022-02-11011 February 2022 Final Operating Test (Sections a, B, and C) (Folder 3) ML22175A1522022-02-11011 February 2022 Amended Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML22175A1682022-02-11011 February 2022 Final Written Examination and Operating Test Outlines (Folder 3) ML22175A1932022-02-11011 February 2022 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML22175A1892022-02-11011 February 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22116A1822022-02-11011 February 2022 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML22175A1772021-11-29029 November 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML22175A1782021-11-29029 November 2021 Draft Written Examination (Folder 2) ML22175A1972021-11-18018 November 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML22175A1942021-09-23023 September 2021 NRC Comments on Draft Licensee-Developed Operating Test Outlines (Folder 2) NTD-21-060, Draft Written Examination and Operating Test Outlines (Folder 2)2021-09-0303 September 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2702021-01-12012 January 2021 Final Qa/Related Forms (Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20301A6322020-10-27027 October 2020 Handouts to Applicants (Folder 3) ML20300A5562020-10-26026 October 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20297A2792020-10-23023 October 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20297A3062020-10-23023 October 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20296A4322020-10-22022 October 2020 Draft Written Examination (Folder 2) ML20296A4302020-10-22022 October 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20240A3222020-08-27027 August 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20240A3182020-08-27027 August 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19211C2552019-07-30030 July 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19004A1222019-01-0303 January 2019 Initial Operator Licensing Operating Test Approval ML18135A2482018-05-21021 May 2018 Draft Written Examination (Folder 2) ML18135A3012018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML18135A2162018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) NTD-18-043, Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18135A2252018-03-20020 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18134A1372018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 SRO (Folder 1) ML18149A4942018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 RO (Folder 1) ML18074A0542018-03-0909 March 2018 Handouts to Applicants (Folder 3) ML18074A0552018-03-0909 March 2018 Final Operating Test (Section a, B, and C) (Folder 3) ML18074A0522018-03-0909 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18074A0532018-03-0909 March 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18134A1282018-03-0909 March 2018 Final Qa/Related Forms (Forms 1) ML18025A8582018-01-22022 January 2018 Initial Operator Licensing Written Examination Approval ML18017A8212018-01-17017 January 2018 Initial Operator Licensing Test Approval ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18135A3332017-12-11011 December 2017 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML17201A0612017-07-19019 July 2017 Senior Reactor and Reactor Operator Initial License Examinations - Salem Nuclear Generating Station IR 05000272/20173022017-06-29029 June 2017 Senior Reactor Operator Retake License Examination Report 05000272/2017302 and 05000311/2017302 ML17249A1322017-06-0707 June 2017 Final Qa/Related Forms (Folder 1) ML17174B2102017-06-0606 June 2017 Final Outlines (Folder 3) 2023-05-23
[Table view] |
Text
ES-401 Written Examination Review Worksheet Form ES-401-9
--------
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOD (F/H) (1-5) Stem Cues T/F Creel. Partial Job- Minutia #1 Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward KIA Only 1 F N U Overlap with SRO #16. replaced question.
Modified Choices C and D to enhance discriminatory value.
2 H N E Added additional information to justification section.
Recategorized as memory level, not higher order.
3 F X N U Modified stem and distracters to make distracters credible.
Modified stem, added information relating to A TWS condition to 4 H B E enhance credibility of the 'two-pump' choices. Modified choices to improve discriminatory value.
(Draft 0#18) 5 M N E Question replaced because of overlap with tested knowledge in Questions 29 and 56.
(Draft Q#5) 6 F B E Minor distractor wording change. Changed value in distractor to improve plausibility. Added to justification to explain why motor temp may not be increasing with 10 flow alarm.
(Draft Q#6) 7 F B E Replaced one implausible distractor, reordered choices.
(Draft 0#7) 8 H B E Removed "references provided" statement from the stem. Modified choice values to prevent overlap between choices.
(Draft 0#8)
Reworded several choices to improve plausibility and eliminate overlap with Q#20.
9 F N E This question matches KIA for applying system limits because the heat up of seal injection to 225°F in 5.3 minutes is a system limitation as documented in a loss of CCW calculation and in the Technical Basis Document for S2.0P-AB.CC-0001.
Page 1
ES-401 Written Examination Review Worksheet Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
0# LOK LOD (F/H) (1-5) Stem Cues TIF Credo Partial Job- Minutia #1 Back 0= SRO B/M/N utE/S Explanation Focus Dist. Link units ward KIA Only (Draft 0#9) 10 F B E Removed "hotter" and "cooler" from Choices BID. Unnecessary, could be confusing and could cue the correct answer.
(Draft 0#10) 11 F N E Changed running pump in the stem to enhance distractor credibility.
Reordered answer choices.
(Draft 0#11) 12 H B E Removed unnecessary, leading information ("since it is not being discriminated out") from both Choice C and Choice D.
13 H B S (Draft 0#12)
(Draft 0#13) 14 M N E Fixed typo in Choice D. Modified wording in Choices A and B for symmetry. Corrected reference page number.
15 H N S (Draft 0#14)
(Draft 0#15) 16 H N E Replaced O. Too many GFE level questions on test.
(Draft 0#16) 17 F X N U Modified choices to ensure each choice is mutually exclusive of the corresponding choice.
(Draft 0#17) 18 H 3.0 N E Minor editorial changes in distracters.
Page 2
ES-401 2 Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
LOK LOD Q# (FIH) (1-5) Stem Cues TlF Credo Partial Job- Minutia #1 Back- Q= SRO BIMtN utEtS Explanation Focus Dist. Link units ward KIA Only 19 H B S 20 F N S Modified Choice C to prevent overlap with Q#9 (Draft Q#8).
21 F B E Replaced one non-credible distractor. Reordered choices.
22 H B S Reclassified as higher cognitive level question.
23 M B U Low LOD. Replaced question.
24 H B S H B S Added to justification to explain that lockout switch is plausible 25 because it is a Unit difference.
26 F N S 27 F N S Reclassified as a lower cognitive level question.
Corrected minor typo in stam.
28 H N E Added "initial" to stem question.
Modified wording of generator MW choice to make clearly wrong.
Minor stem wording change.
29 H N S Added to justification to elaborate on why Choice A is wrong.
30 H B S 31 H X X B U Weak KIA match and limited operational validity. Replaced Q.
32 H N S Added to question justification to explain the KIA match.
33 H N S Fixed typos in justification section.
34 H N S 35 F M S 36 H B S Page 3
ES-401 2 Form ES*401*9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
LOK LOD Q# (F/H) (1-5) Stem Cues T/F Credo Partial Job- Minutia #1 Back- Q= SRO B/M/N UlE/S Explanation Focus Dist. Link units ward KIA Only Modified conditions in stem to remove the leak and replace with 37 H B E different fault. Changed to address the overlap between 0#37 and 0#3.
H X B E Added transmitter O/S in stem to improve distractor plausibility and 38 increase LOD.
39 F B S 40 F N S
- 41 H B S Minor distractor wording change, rearranged choices.
- 44 H N S 45 H B S 46 F B S 47 F N S 48 F X B U Collection of TruelFalse statements. Rewrote Q to fix psychometric flaw.
--
49 H N S Too many GFE level Qs on RO exam. Replaced with new Q.
50 F N E Modified stem to make more operationally valid.
51 H N S
- 52 F N U Low LOD based on initial reactor trip EOP immediate action, practiced many times in simulator scenarios. Question replaced.
53 F N E Added "lAW ... " to stem.
- 54 H N E Rewrote question and distracters to improve plausibility of choices.
55 H N S Page 4
ES-401 2 Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
LOK LOD 0# (FtH) (1-5) Stem Cues TtF Credo Partial Job- Minutia #t Back- 0= SRO B/M/N utEtS Explanation Focus Dist. Link units ward KIA Only 56 H B S 57 F B S 58 H N S I I
F B S Corrected typo in justification section. Modified justification for 59 correct answer to explain TS.
F N E Replaced distractor containing 2R1A because discriminatory value 60 reduced by 0#61. Reordered choices.
61 H N S 62 H M S 63 H B S 64 H B E Replaced one implausible distractor. Reordered choices.
65 F B E Modified stem and one distractor to improve distractor plausibility.
66 F N E Modified stem to enhance distractor plausibility.
67 F N S 68 H N S Facility confirmed this is expected RO level knowledge.
H B E Modified justification to align with key answer. Reduced total pri to 69 sec leakage in stem to ensure per-generator value is within limits.
70 H B S .
SRO 0#22 helps to answer this question. However, RO exam is !
71 H B S collected before SRO exam distributed to applicants. Therefore, no i need for change to SRO 0#22. I Removed "the" from Choice C. Added to "Unit 1 trips" choice, to 72 H B E provide information for assessment that emergency not in progress.
Reordered choices.
73 F B S Page 5
ES-401 2 Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
LOK LOD Q# (F/H) (1-5) Stem Cues T/F Credo Partial Job- Minutia #1 Back- Q= SRO B/M/N utEtS Explanation Focus Dist. Link units ward KIA Only F B E Modified a distractor to remove leading information. Replaced one 74 distractor with a plausible incorrect choice.
75 F X N U Modified stem. Replaced ChOices Band D with plausible distracters.
(SRO#1) 76 H M E Deleted mode information from the stem.
(SRO #2) 77 H N E Provided RCS temperature and pressure parameters, vice plant mode, in the stem.
(SRO #3) 78 H N E Modified the choice wording to ensure question requires procedure knowledge to answer correctly.
(SRO #4) 79 H N E Changed Choice C from "2FR" to "1 FR" to align with the designated unit Improved stem clarity by changing to " ... and which would require ._."_
80 H N S (SRO#5)
(SRO#6)
If "O/S" means out of service, which could be interpreted as inoperable, then Choice C is not credible since it wouldn't change 81 H N E conditions. Perhaps better to state 22 RHR pump is in standby.
Choice D could be argued as a second correct answer, based on assumption that the channel is inoperable because of its audible function.
82 H B S (SRO#7) 83 H N s (SRO#8) 84 H N S (SRO#9)
(SRO #10) 85 H B E Rewrote stem and distrac!ers to better test procedure knowledge.
Page 6
ES-401 2 Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
LOK LOD Q# (F/H) (1-5) Stem Cues T/F Credo Partial Job- Minutia #1 Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward KIA Only (SRO #11) (DRAFT SRO #12) 86 H X N E Replaced Choice A distractor. Added explanation of KIA match.
87 H N S (SRO #12) (DRAFT SRO #13)
._-. ~.---~
(SRO #13) (DRAFT SRO #14) 88 H X N U Minor stem wording change. Reworded Choice A to eliminate the 2 00 correct answer.
(SRO #14) (DRAFT SRO #15) 89 H X N U KA mismatch. KA is for ESF AS. Question tests RPS. Wrote new question to same KA.
(SRO #15) (DRAFT SRO #16) 90 H B E Fixed typos. Minor stem rewording. Reworded distracters for clarity and to improve discriminatory value.
(SRO #16) (DRAFT SRO #11) 91 H X N U Not SRO only. Replaced Q.
(SRO #17) 92 H N E Minor wording changes in Choices C and D.
93 H M S (SRO #18)
(SRO#19) 94 H X B U Could be answered with system knowledge only. Replaced question. i (SRO #20) 95 H X B U Not SRO-only. Can be answered with basic GFE knowledge.
Replaced question.
96 H B S (SRO #21)
Page 7
ES-401 2 Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
LOK LOD Q# (F/H) (1-5) Stem Cues TIF Credo Partial Job- Minutia #1 Back- Q= SRO B/M/N utE/S Explanation Focus Dist. Link units ward KIA Only (SRO#22)
Minor stem wording change to ensure all choices are supported by the question.
97 H B E This question contains information that could help to eliminate two distracters on RO 0#71 by narrowing the annual PSE&G limit to between 1900 and 2350 mR. However. RO exam is collected before SRO exam distributed to applicants. Therefore, no need for change.
(SRO#23) 98 H B E Rewarded stem and choices to improve distractor plausibility.
(SRO#24) 99 H X B E Rewrote stem conditions and choices to enhance discriminatory value of distracters.
100 H N S (SRO #25)
Page 8