ML22175A174
| ML22175A174 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 02/11/2022 |
| From: | Public Service Enterprise Group |
| To: | Joseph Demarshall Operations Branch I |
| Shared Package | |
| ML21020A061 | List: |
| References | |
| EPID: L-2022-OLL-0002 | |
| Download: ML22175A174 (1) | |
Text
Salem 2022 Exam Summary of References Provided to Applicants Question #
References Provided 60 Embedded Reference; 22 HYDROGEN COMBINER CONTROL POWER OUT KW Meter Detached Reference (Separate Handout); S2.OP-SO.CAN-0001, Hydrogen Recombiner Operation 82 Detached Reference (Separate Handout); Salem U2 Tech Spec LCO 3.3.1.1, Reactor Trip System Instrumentation, Pages 3/4 3-1 through 3/4 3-7 83 Detached Reference (Separate Handout); EP-SA-325-123, Fission Product Barrier Table 87 Detached References (Separate Handout); SGS ECG RAL Section 11.3, System Actuation, Page 1 of 2; SGS EAL/RAL Technical Basis RAL-11.3.3, Pages 2-4 89 Detached References (Separate Handout); Tech Spec 3.8.1.1, A.C.
Electrical Power Sources, Pages 3/4 8-1 through 3/4 8-2a 91 Detached Reference (Separate Handout) Tech Spec 3.4.10.3, Reactor Coolant System, Overpressure Protection Systems, Pages 3/4 4-31 and 3/4 4-32