ML18024A068

From kanterella
Revision as of 23:29, 9 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Letter Referring to the April 26, 1978 Letter and Advising the Commission That a Definitive Report Will Be Submitted by September 29, 1978
ML18024A068
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/05/1978
From: Curtis N
Pennsylvania Power & Light Co
To: Grier B
NRC Region 1
References
PLA-267
Download: ML18024A068 (5)


Text

REGULATORY INFORNATION DISTRIBUTION SYSTEN (RIBS> D5"F/~'F&'I "TRI'BUTION FGR INCOMING MATERIAL REC: QRIER B H ORG: CURTIS N W DQCDATE: 07/05/78 NRC PA PWR S. LIGHT DATE RCVD:. 07/10/78 DQCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED

SUBJECT:

LTR 1 ENCL 0 IN ORMING OF NEW DATE 09/29/78 FGR SUBMITTAL OF UPDATE OF INTERIM REPT'F REPORTABLE DEFICIENCY RE SPOT WELDING GF STRUTS MATERIAL.

f uQI7 PLANT NAMF:SUSQUEHANNA UNIT 2 REVIEWER INITIAL: X JM DISTRIBUTER INITIAL:

Hc~qp DISTRIBUTION GF THIS MATERIAL IS AS FOLI GRIS NOTFS:

SEND ISE 3CYS FSAR 5 ALL AMDTS CONSTRUCTION DEFICIENCY REf ORT (10CFRS0. 5SE>

<DISTRIBUTION CODE B019)

FOR ACTION ASST DIR VASSALLO~~4~I TR ONLY( 1) BR Cl-IIEF LNRN3 BC<<LTR ONLY<.1)

PRO J MGR M INER4Hl LTR ONLY ( 1 ) LIC ASST LNR53 LA>+LTR ONLY(i>

INTERNAL: ECr' .LF4l+LTR ONLY ( NRC PDR+slLTR ONLY(i>

Est+ OELD~<LTR ONLY<i)

GOSSICK 5 STAFF4k4tLTR ONLY(1 > MIPC4~~~LTR ONLY(1 >

DIRECTOR DPM~~~~LTR ONLY < 1 ) DEPUTY DIR DPM~~<LTR ONLY(1)

GAB~~<<LTR ONLY(1) D I RECTOR l3SS4HI LTR ONLY ( 1 )

AD FOR EN64~+LTR ONLY < 1) AD FQR REAC SFTY<~LTR ONLY< 1)

A13 FOR PLANT SYSTEMS<t4~LTR ONLY ( AD FOR SYS 5 PRQJ>+LTR ONLY(1>

SD~~~LTR ONLY<1) K SEYFRIT/IE+%LTR ONLY< 1)

FERD BREWER/IE~~~~LTR ONLY(i)

W EXTERNAL: LPDR'S lAlILKES BARREr PA4~4~LTR QNLY <

TERA4~4LTR ONLY(i)

NSIC+<I TR GNI Y<i)

ACRS CAT B~~+LTR ONLY ( ih >

DISTRIBUTION: LTR 41 ENCL 0 CONTROL NBR: 781920008 SIZE: 2P 4%%%%% %0M 4 %4 0HF+0F+0F+dt%%8M%%%%%%%%%%% THE END %4 4 4%%4%% %%%%%%%%4%%%%%%%%%% r%%%%0

~ '

~

tt j

TWO NORTH NINTH STREET, AllENTOWN, PA. 18101 PHONE: (215) 821.5151 NORMAN W CURTIS Vice President Engineering 8 Construction 821.5381 July 5, 1978 Mr, Boyce H. Grier Director, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 P "P c.o SUSQUEHANNA STEAM ELECTRIC STATION UPDATE OF INTERIM REPORT OF REPORTABLE DEFICIENCy REGARDING SPOT WELDING OF STRUT MATERIAL DOCKET NOS: 50-397P 50-388 LICENSE NOS: CPPR-101, CPPR-102 ERs 100450/100508 FILE 840-4 PLA-267

Dear Mr. Grier:

Reference is to my letter PLA-249, dated April 26, 1978.

We have recently decided to take and test additional samples for the purpose of evaluating the subject deficiency. Based upon our recently established time requirements for obtaining, testing and evaluating the test results, we conclude that it will not be possible to submit a definitive report by the date (7/31/78) originally identified.

We therefore submit. for your information a new date, September 29, 1978, by which time we expect to submit the required report.

Very truly yours, N, W, Curtis Vice President;Engineering 8 Construction ARS:mcb 781920008 PENNSYLVANIA POWER 8, LIGHT COMPANY

f Mr. B. H. Grier July 5, 1978 cc: Mr. Ernst Volgenau (15)

Director Office of Inspection 6 Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. G. McDonald, Director Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C. 20555