Category:Congressional Correspondence
MONTHYEARML21022A2212021-02-0505 February 2021 Letter to Senator Charles Schumer from Margaret Doane Response for NRC to Reconsider Its Decision to Not Allow for a Public Hearing in the Transfer of Indian Point'S License ML20192A2392020-07-29029 July 2020 Letter to the Honorable Jeanne Shaheen, Et Al., from Chairman Svinicki Regarding Concerns About Recent Incidents at Seabrook Station and Requests for a Public Information Session and Congressional Briefing ML20119A9872020-05-0505 May 2020 Letter to the Honorable Edward Markey, Et Al., from Chairman Svinicki Responds to Questions About the Seabrook Nuclear Plant Refueling Process During the Ongoing Coronavirus Outbreak ML20111A1402020-04-20020 April 2020 LTR-20-0159 Senator Edward Markey Et Al., Letter Questions About the Seabrook Nuclear Plant Refueling Process During the Ongoing Coronavirus Outbreak ML19262G4752019-10-0808 October 2019 10-08-19 - Ltr to the Honorable Edward J. Markey, Et Al., Responds to Concerns Related to the NRC Staff Recommendation Regarding a Request from Entergy for Exemptions from Emergency Preparedness and Planning Requirements for Pilgrim Nuclear ML19239A1452019-08-26026 August 2019 Letter to the Honorable Edward J. Markey from Rochelle C. Bavol, Acting Secretary of the Commission, Regarding the Pilgrim Nuclear Power Station License Transfer Request from Entergy and Holtec ML19233A2432019-08-21021 August 2019 LTR-19-0326 Sen Edward Markey, Sen Elizabeth Warren & REP William Keating, Letter Urges to Delay the Final Ruling on the Pilgrim Nuclear Power Station License Transfer Request from Entergy & Holtec Until After the Commission Has Ruled Upon ML19221B4792019-08-0808 August 2019 LTR-19-0310 Sen Edward J. Markey, Letter Urges the Chairman to Direct the NRC Staff to Delay Ruling on the Pilgrim Nuclear Power Station License Transfer Request from Entergy and Holtec (Docket No. 50-293 & 72-1004) ML18341A0162018-12-20020 December 2018 Letter to the Honorable William Keating Responds to His Letter Commenting on Recent NRC Inspection Reports Issued for the Pilgrim Nuclear Power Station ML18331A0402018-11-21021 November 2018 Acknowledgement Letter to Congressman William Keating on Pilgrim Inspection Report ML18228A6432018-08-28028 August 2018 Letter to Representative William Keating from Chairman Svinicki Responds to His Letter Regarding the Proposed Sale of Pilgrim Nuclear Power Station by Entergy Nuclear Operations Inc. to a Subsidiary of Holtec International ML18135A1022018-05-29029 May 2018 Letter to the Honorable Edward Markey from Chairman Svinicki Responds to His Letter Regarding Spent Fuel Storage at Pilgrim Nuclear Power Station and the Potential Impacts of Climate Change ML18127A0312018-05-0707 May 2018 Statement of Senator Edward J. Markey - NRC Annual Assessment Meeting for Pilgrim Nuclear Power Station - 03/27/2018 ML18127A0322018-05-0707 May 2018 Statement of Senator Elizabeth Warren - NRC Annual Assessment Meeting for Pilgrim Nuclear Power Station - 03/27/2018 ML18127A0302018-05-0707 May 2018 Statement of Congressman William R. Keating - NRC Annual Assessment Meeting for Pilgrim Nuclear Power Station - 03/27/2018 ML18066A0822018-03-19019 March 2018 Enclosure - Letter to Senator Elizabeth Warren, Et Al., from Chairman Svinicki Regarding Winter Storms and an Inspector for Pilgrim Nuclear Power Station ML16295A0892016-10-20020 October 2016 Letter to Senator Edward J. Markey Et Al., from Chairman Burns, Response to Letter Urging the Commission to Reject a Request from Entergy Nuclear Operations Inc. for an Extension of Time to Comply with NRC Order EA-13-109 ML16266A0652016-09-21021 September 2016 LTR-16-0469 Senator Edward J. Markey Et Al., Letter Request to Reject Entergy'S Efforts to Reduce Safety Requirements at Pilgrim ML16174A4032016-06-15015 June 2016 Letter to Senator Edward Markey from Eugene Dacus, OCA Provides Final Response to His Letter on Seabrook Station, Unit 1 Enclosing UFSAR Revisions 11, 12, 13, 14 and 15 ML16141B3062016-05-17017 May 2016 05-17-16, Letter to Senator Edward Markey from Eugene Dacus Provides Second Response for Documents Regarding the Seabrook Station Unit 1 (Rev. 16 of the UFSAR and NextEra Response Letter to the Staff on License Renewal for Seabrook) ML16111B3122016-04-19019 April 2016 04-19-16 Letter to Senator Markey Fm Eugene Dacus Responds to His Letter Requesting Documents Pertaining to the Seabrook Station (Revisions 12-16 for Seabrook'S Updated Final Safety Analysis Reports, Chapter 3) ML16054A7672016-02-23023 February 2016 02-23-16 Letter to Senator Edward Markey from Eugene Dacus Acknowledging His Letter to Chairman Burns Dated 02/17/16 Pertaining to the Seabrook Station ML16054A1172016-02-17017 February 2016 LTR-16-0080 - Senator Edward J. Markey, Letter Request for Documents Related to Safety Issues at Seabrook Station Nuclear Power Plant ML15309A1282015-11-30030 November 2015 Letter to Senator Edward J. Markey, Et Al., from Chairman Burns Responds to His Letter Seeking Assurance That Decommissioning of Pilgrim Nuclear Power Station Will Be in Compliance with NRC Regulations (Response) ML15299A1142015-10-21021 October 2015 10-21-15 Ack Ltr to Honorable Edward J Markey - Pilgrim ML15289A1452015-10-15015 October 2015 LTR-15-0519 Senator Edward J. Markey, Letter Request to Ensure That the Remaining Period During Which the Pilgrim Nuclear Power Station Operates Receives the Utmost Attention to Safety and Security ML14163A4332014-08-0101 August 2014 Letter to Senator Edward J. Markey from Chairman Macfarlane Information About NRC-Sanctioned Job Shadow Program with China ML14141A6242014-05-20020 May 2014 LTR-14-0288 - Senator Edward J. Markey Ltr. Information About NRC-Sanctioned Job Shadow Program with China ML14043A1382014-02-14014 February 2014 G20140055/LTR-13-0957 - Sen. Edward Markey, Et Al., Ltr Requests the NRC Make No Decision on the 6/1/10, Request for the Seabrook Nuclear Power Plant for a 20 Year Operating License Until the Concrete Degradation Is Well Tested and Remedied ML14037A1262014-02-14014 February 2014 G20140030/LTR-14-0009- Senator Jeanne Shaheen Email Seabrook - Piping/Plumbing (Response) ML14014A2252014-01-14014 January 2014 LTR-13-0957, Response Letter to Senator Edward Markey Et Al., on His Request for NRC to Not Make a Decision for the Seabrook Plants for a 20 Year OL Until the Concrete Degradation Is Well Tested and Remedied ML13354B9522013-12-18018 December 2013 G20140055/LTR-13-0957 - Senator Edward Markey, Et Al., Ltr Requests the NRC Make No Decision on the June 1, 2010, Request for the Seabrook Nuclear Power Plant for a 20 Year Operating License Until the Concrete Degradation Is Well Tested and ML13079A2822013-03-26026 March 2013 G20130209/LTR-13-0224 Ltr. to Rep. E. Markey, Et Al. - Responds to Request for the Nuclear Regulatory Commission to Alter Plans to Hold Open House Style Meetings to Review the 2012 Performance of Pilgrim and Seabrook ML13079A0202013-03-18018 March 2013 G20130209/LTR-13-0224 - Ltr. Representatives Edward J. Markey, John F. Tierney and Bill Keating Request for the Nuclear Regulatory Commission to Alter Plans to Hold Open House Style Meetings to Review the 2012 Performance of Pilgrim and Sea ML13007A4062013-01-0202 January 2013 Comment (136) of Thomas J. Calter, State Representative on Environmental Impacts of Temporary Storage of Spent Fuel After Cessation of Reactor Operation ML12215A0212012-07-31031 July 2012 G20120556/LTR-12-0385/EDATS: SECY-2012-0393 - Rep. Edward J. Markey and Rep. Bill Keating Ltr. Emergency Response Capability at the Pilgrim Nuclear Generating Station During Labor Dispute ML12163A5022012-07-23023 July 2012 G20120371/LTR-12-0238/EDATS: OEDO-2012-0270 - Letter to Rep. Edward J. Markey from Chairman Allison M. Macfarlane Re Request That the Nuclear Regulatory Commission Deny Staff'S Request to Re-License the Pilgrim Nuclear Power Plant ML12191A3352012-07-23023 July 2012 G20120430/LTR-12-0277/EDATS: SECY-2012-0310 - Letter to Reps. Edward Markey and William Keating from Chairman Allison M. Macfarlane Concerns About Current Emergency Response Capabilities at Pilgrim Nuclear Generating Station ML12152A3892012-07-23023 July 2012 LTR-12-0187 - Ltr to Congressmen Edward Markey and William Keating from Chairman Macfarlane Responds to Letter Regarding the twenty-year Extension of Pilgrim Nuclear Power Station'S Operating License ML12172A3032012-06-0808 June 2012 G20120430/LTR-12-0277/EDATS: SECY-2012-0310 - Ltr. Reps. Edward Markey and William R. Keating Concerns the Current Emergency Response Capability at the Pilgrim Nuclear Generating Station ML12153A0262012-05-24024 May 2012 G20120371/LTR-12-0238/EDATS: SECY-2012-0270 - Ltr. Rep. Edward J. Markey Re Request That the Nuclear Regulatory Commission Deny Staff'S Request to Re-License the Pilgrim Nuclear Power Plant ML12145A6922012-05-0404 May 2012 LTR-12-0187 - Incoming from Rep Markey and Rep Keating to Chairman Jaczko Urging the Commission Not to Move Forward with Its Decision on Whether to Issue the twenty-year License Extension for Pilgrim Nuclear Power Station ML12114A0172012-04-13013 April 2012 G20120265/LTR-12-0150/EDATS: SECY-2012-0195 - Ltr. Reps. Edward J. Markey and John F. Tierney to Chairman Jaczko Seabrook Nuclear Power Plant - Degradation of Concrete ML12090A5882012-03-27027 March 2012 G20120213/LTR-12-0123/EDATS: SECY-2012-0147 - Senator Kelly A. Ayotte Ltr. Seabrook Nuclear Station ML12104A1132012-03-23023 March 2012 G20120234/LTR-12-0140/EDATS: SECY-2012-0178 - E-mail Senator John F. Kerry Safety Issues at Seabrook Nuclear Power Plant ML12079A2162012-03-21021 March 2012 G20120135/LTR-12-0080/EDATS: SECY-2012-0096 - Ltr to Rep. Edward J. Markey Fm R. W. Borchardt Re Pilgrim Nuclear Power Station ML12072A3032012-03-0808 March 2012 Letter from the Secretary to the Honorable Edward J. Markey in Response to His February 27, 2012 Letter ML12079A2182012-02-27027 February 2012 G20120135/LTR-12-0080/EDATS: SECY-2012-0096 - Responses to Information Requests from Representative Edward J. Markey ML12061A2152012-02-27027 February 2012 G20120135/LTR-12-0080/EDATS: SECY-2012-0096 Urges NRC Not to Relicense the Pilgrim Nuclear Power Station Until All Legal Requirements Stipulated by the Endangered Species Act Have Been Met CY-92-223, G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 19712011-07-14014 July 2011 G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971 2021-02-05
[Table view] Category:Letter
MONTHYEARL-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML24009A1152024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule ML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point IR 05000443/20234032023-11-0707 November 2023 Security Baseline Inspection Report 05000443/2023403 and Independent Spent Fuel Storage Installation 07200063/2023401 IR 05000443/20230032023-11-0606 November 2023 Integrated Inspection Report 05000443/2023003 ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) L-23-011, 10 CFR 72.48 Biennial Change Summary Report2023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000443/20230102023-10-19019 October 2023 Triennial Fire Protection Inspection Report 05000443/2023010 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A0522023-10-0202 October 2023 Requalification Program Inspection IR 05000443/20234012023-09-0808 September 2023 Cybersecurity Inspection Report 05000443/2023401 (Cover Letter Only) IR 05000443/20234202023-09-0505 September 2023 Security Baseline Inspection Report 05000443/2023420 IR 05000443/20230052023-08-31031 August 2023 Updated Inspection Plan for Seabrook Station (Report 05000443/2023005) IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000443/20233022023-08-16016 August 2023 Operator Licensing Retake Examination Report 05000443/2023302 IR 05000443/20230022023-08-0808 August 2023 Integrated Inspection Report 05000443/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-103, Inservice Inspection Examination Report2023-08-0303 August 2023 Inservice Inspection Examination Report L-2023-104, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations ML23192A0782023-07-11011 July 2023 Operator Licensing Retake Examination Approval L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 ML23157A0722023-06-0606 June 2023 Notification of Conduct of a Fire Protection Team Inspection L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000443/20233012023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000443/2023301 ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 IR 05000443/20230012023-05-11011 May 2023 Integrated Inspection Report 05000443/2023001 L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-05-11011 May 2023 License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves ML23129A0312023-05-0909 May 2023 Reactor Operator Retake License Examination ML23117A3652023-05-0404 May 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from PTL and Low Temperature Over Pressure Protection Curves SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report 2024-02-02
[Table view] |