MONTHYEARNL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. NL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection NL-23-0739, Response to NRC Inspection Report and Preliminary White Finding2023-09-0808 September 2023 Response to NRC Inspection Report and Preliminary White Finding NL-23-0713, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0716, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0628, Readiness for Supplemental Inspection EA-22-1012023-07-26026 July 2023 Readiness for Supplemental Inspection EA-22-101 NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0449, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2023-06-0202 June 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0337, Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52023-05-0505 May 2023 Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 NL-23-0295, Reply to a Notice of Violation; EA-22-1012023-05-0101 May 2023 Reply to a Notice of Violation; EA-22-101 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0213, Inservice Inspection Program Owner'S Activity Report for Outage 1R312023-03-21021 March 2023 Inservice Inspection Program Owner'S Activity Report for Outage 1R31 NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal NL-23-0101, Cycle 28 Core Operating Limits Report Version 12023-02-23023 February 2023 Cycle 28 Core Operating Limits Report Version 1 NL-23-0080, Response to Request for Additional Information (RAI) Related to Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.02023-02-0202 February 2023 Response to Request for Additional Information (RAI) Related to Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0 NL-23-0003, Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 12023-01-20020 January 2023 Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1 NL-23-0069, Correction of Technical Specification Omission and Typographical Error2023-01-20020 January 2023 Correction of Technical Specification Omission and Typographical Error NL-23-0008, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting.2023-01-17017 January 2023 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting. NL-23-0011, Update to Supporting Documentation Regulatory Conference EA-22-101. Cover Letter Only2023-01-0505 January 2023 Update to Supporting Documentation Regulatory Conference EA-22-101. Cover Letter Only NL-22-0799, License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52022-12-20020 December 2022 License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 NL-22-0897, Supplement to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A,2022-12-0909 December 2022 Supplement to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, NL-22-0316, Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable2022-11-30030 November 2022 Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable NL-22-0887, Cycle 32 Core Operating Limits Report2022-11-21021 November 2022 Cycle 32 Core Operating Limits Report NL-22-0850, Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection Program2022-11-18018 November 2022 Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection Program NL-22-0884, Response to NRC Inspection Report 05000348/2022440 and 05000364/2022440 EA-22-1012022-11-17017 November 2022 Response to NRC Inspection Report 05000348/2022440 and 05000364/2022440 EA-22-101 NL-22-0800, Supplement to Authorized Relief Request HNP-ISI-RR-05-022022-10-27027 October 2022 Supplement to Authorized Relief Request HNP-ISI-RR-05-02 NL-22-0832, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF .2022-10-27027 October 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF . 2024-01-30
[Table view] |
Text
Charles R. Pierce Southern Nuclear Regulatory Affairs Director Operating Company, Inc.
40 Inverness Center Parkway Post Olfice Box 1295 Birmingham. AL 35242 Tel 205.992.7872 Fax 205.992.7601 MAY 2 3 2014 Docket Nos: 50-321 50-348 50-424 NL-14-0821 50-366 50-364 50-425 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant- Units 1 and 2 Edwin I. Hatch Nuclear Plant - Units 1 and 2 Vogtle Electric Generating Plant - Units 1 and 2 Response to Regulatory Issue Summary 2014-05 Preparation and Scheduling of Operator Licensing Examinations Ladies and Gentlemen:
On April 29, 2014, the Nuclear Regulatory Commission (NRC) issued Regulatory Issue Summary (RIS) 2014-05, "Preparation and Scheduling of Operator Licensing Examinations." RIS 2014-05 requests that licensees voluntarily submit projections of their site-specific operator licensing examination schedules as well as the estimated number of applicants planning to take operator licensing and generic fundamental examinations for years 2016-2019.
Southern Nuclear Operating Company (SNC) hereby provides as enclosures to this letter the requested information on NRC form 536 for Joseph M. Farley Nuclear Plant- Units 1 and 2, Edwin I. Hatch Nuclear Plant- Units 1 and 2, and Vogtle Electric Generating Plant - Units 1 and 2. The estimates provided represent SNC's current understanding, but are subject to possible change in the future.
This letter does not contain NRC commitments or proprietary information. If you have any questions regarding the material of this submittal, please contact Mr. G. K. McElroy at 205-992-7369.
Respectfully submitted,
(!1{ fk. . .
C. R. Pierce Regulatory Affairs Director CRP/JMC/
U.S. Nuclear Regulatory Commission NL-14-0821 Page2
Enclosures:
- 1. NRC Form 536 Operator Licensing Examination Data for Joseph M.
Farley Nuclear Plant- Units 1 and 2
- 2. NRC Form 536 Operator Licensing Examination Data for Edwin I.
Hatch Nuclear Plant - Units 1 and 2
- 3. NRC Form 536 Operator Licensing Examination Data for Vogtle Electric Generating Plant- Units 1 and 2 cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Ms. C. A. Gayheart, Vice President - Farley Mr. D. R. Vineyard, Vice President- Hatch Mr. T. E. Tynan, Vice President- Vogtle 1 & 2 Mr. D. R. Madison, Vice President- Fleet Operations Mr. B. L. lvey, Vice President- Regulatory Affairs Mr. B. J. Adams, Vice President- Engineering Mr. R. R Martin, Regulatory Manager- Farley Mr. G. L. Johnson, Regulatory Manager- Hatch Mr. S. C. Waldrup, Regulatory Manager- Vogtle RType: Farley=CFA04.054; Hatch=CHA02.004; Vogtle=CVC7000 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. S. A. Williams, NRR Project Manager- Farley Mr. E. D. Morris, Senior Resident Inspector- Hatch Mr. L. M. Cain, Senior Resident Inspector- Vogtle 1 & 2 Mr. P. K. Niebaum, Resident Inspector- Farley Mr. J. R. Sowa, Resident Inspector- Farley Mr. R.E. Martin, NRR Project Manager- Hatch, Vogtle 1 & 2
Joseph M. Farley Nuclear Plant- Units 1 and 2 Response to Regulatory Issue Summary 2014-05 Preparation and Scheduling of Operator Licensing Examinations Enclosure 1 NRC Form 536 Operator Licensing Examination Data for Joseph M. Farley Nuclear Plant - Units 1 and 2
NRC FORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3110.0131 EXPIRES: 0913012014 (9-20H)
Eslimaled buRien per response 111 comply with lllls volllnlaly infonnalian Clllleclinn ll!qiK!SI: I hour. This infvnnallon ClOiedion is used Ill !)lan budgets and rescun:es lor operator
~ Send Cllllllll8l1ls ragallling bvnlsn es1lmale 10 1118 lnronnatian SeMces Brandl OPERATOR LICENSING CT*S FS3). U.S. Nuclear Regula!llly Commlss!on, W~ DC 2055S-QI0t, or by inlemet e-mal 10 !nloc:ICllects.R8solll:e@nlc.p. and ID the Desk Ofbr, Ol!!ce of lnfacma!lan and EXAMINATION DATA ~ Allairs, NEOB-10202, 1315114131), O!l!ca af Management and Budget. waslingtDn.
DC Z0503. Ha means used 10 lllqlose an ln!llrmation coredcn does nat disJIIaY a Cllm!llly valid OMB CIII1WI nunmer, hi NRC may not Cllltducl cr SJ)CIIalr, and a pe~m~ls not requited 10 respgnd to. the lnilnnlllllln Cllllecticn.
FACIUTY NRC ReGION Joseph M. Farley Nuclear Plant Units 1 & 2 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 16 CY 17 CY 18 CY 19
- - - -
ESTIMATED NUMBER OF LICENSEE-PREPARED 0 I I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 16 CY 17 CY 18 CY 19
- - - -
NUMBER OF REACTOR OPERATORS 0 6 6 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 7 5 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 I I 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED OATES PRIMARY DATE 04/03/2017 10/0112018 AlTERNATE DATE 04/10/2011 10/08/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY CY PROPOSED NUMBER
- 16 - 17 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 538 (9-2011)
Edwin I. Hatch Nuclear Plant - Units 1 and 2 Response to Regulatory Issue Summary 2014-05 Preparation and Scheduling of Operator Licensing Examinations Enclosure 2 NRC Form 536 Operator Licensing Examination Data for Edwin I. Hatch Nuclear Plant - Units 1 and 2
NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150~131 EXPIRES: 09130/2014 (9-2011)
Estimated burden per response to ccrnply with this vo!unlaly in!onna!ion co!lection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This informa5on co!ledion is used to plan budgets and resources fer operalof euminations. Send conunenls regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regula!Oiy CQmmissian, Washington, DC 20555-0001, or by internet e-mail to lntocollects.Resoun:e@nrc.gov, and to the Desk Oflicler, Office Gf lnfcrmation ard EXAMINATION DATA Regulatory Affairs, NEOB-10202, (3150-0131), Office of Managemenlmd Budge~ Washington, DC 20503. If a means used Ill imp<lse an information colleelkln dGes oot display a currently valid OMB control number, Ute NRC may not conduct ar sponsor, and a pelSOR is nGI requited to respond to, lhe lnfcrmatioo collection.
FACILITY NRC REGION Plant E. I. Hatch II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF
-
CY2016
-
CY2017 CY2018
- CY2019
-
LICENSEE-PREPARED I I 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016
-
CY2017
- -
CY2018 CY2019
-
NUMBER OF REACTOR OPERATORS 7 6 7 7 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 5 4 4 4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 2 1 2 NUMBER OF SENIOR REACTOR OPERATORS -LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 06/20/2016 09/18/2017 06/18/2018 06/17/2019 ALTERNATE DATE 06/2712016 09/25/2017 06/25/2018 06/24/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER
- -
MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 15 0 0 12 0 0 12 0 CANDIDATES NRC FORM 536 (9-2011 I
Vogtle Electric Generating Plant - Units 1 and 2 Response to Regulatory Issue Summary 2014-05 Preparation and Scheduling of Operator Licensing Examinations Enclosure 3 NRC Form 536 Operator Licensing Examination Data for Vogtle Electric Generating Plant - Units 1 and 2
NRC FORM 53& U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 31&0~131 EXPIRES: 08130/21114 (09-2011)
ESIImal8d llunlen per response 1D canw will lhis d!ntay il1fllnnaiiDn ccDeclion request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This infonnation collection Is uted 1D plan lludgels am 18S01111X1S for Cjl8fldat examinations. Send c:onmerds raganing lxl1!en es&nate ID !he lnbmalion Senices BllllCh OPERATOR LICENSING (T.S FS3), U.S. Nucla* Reglllaby C<<nmissson. Washlngbl. DC 20555-00J1, 01 by lnlemat e-EXAMINATION DATA IIWIID lnfacollacts.RescurceOic.gov, a1d fD 1lle De:ik Ollter, Ollice of lllbmallon lrld Reg!Mxy ~... N£()8.10Z02, (3164).0131). Olfice of~~ lrld Budget.~.
DC 20503. If a moans used ID Impose 111 lnbmatian caleclion does 1101 displaJ a a~nenly ml OMS conllol ~.1111 NRC 11111 not canducl 01 sponsor, and a pn~nls 1101 ruqui'Dd ID respond to, !he lnbmallon caleclon.
FACILilY INit\; REGIUN VOGTLE ELECTRIC GENERATING PLANT- UNITS 1&2 II 7821 RIVER ROAD WAYNESBORO, GEORGIA 30830 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF
-
CY2016 CY2017
- -
CY2018 CY2019
-
LICENSEE-PREPARED 0 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRc-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR
-
CY2016 CY2017
- CY2018
- CY2019
-
OPERATORS 0 8 8 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 8 8 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 2 0 NUMBER OF SENIOR REACTOR OPERATORS* UMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE NA 4/1012017 9/1712018 NA ALTERNATE DATE NA 4/17-4/24/2017 9/24-10/112018 NA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH JUNE
-
CY 2016 SEPTEMBER DECEMBER MARCH CY 2017
-
JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 CANDIDATES NRC FORM53S (Q9.2.011)