MONTHYEARML23199A2212023-07-18018 July 2023 Rhode Island Atomic Energy Commission - Annual Report ML22208A1302022-07-27027 July 2022 State of Rhode Island, Submittal of Annual Report ML21195A0962021-07-14014 July 2021 Rhode Island Atomic Energy Commission - Annual Report ML20196L7352020-07-13013 July 2020 State of Ri, Atomic Energy Commission - Annual Report 2020 ML19212A2842019-07-26026 July 2019 State of Rhode Island and Providence Plantations - Annual Report 2019 ML18219B3942018-08-0707 August 2018 State of Ri, Atomic Energy Commission, Submittal of Annual Report Required by the Rinsc Technical Specifications (Section 6.7.1) ML17201A0052017-07-19019 July 2017 Rhode Island Nuclear Science Center - Annual Operating Report, Per Technical Specifications 6.7.1 ML16243A3912016-08-25025 August 2016 State of Rhode Island and Providence Plantation Rhode Island Atomic Energy Commission, Submittal of Annual Report Required by the Rinsc Technical Specifications (Section 6.8.4) ML15251A2072015-08-28028 August 2015 Letter from Constance Hathaway Reactor Operating Statistics ML14258A0092013-08-29029 August 2013 Rhode Island Atomic Energy Commission - Annual Operating Report ML11234A0322011-07-28028 July 2011 Rhode Island Atomic Energy Commission Ltr. Enclosing Annual Report Required by Rinsc Technical Specifications (Section 6.8.4) ML1022304162010-07-30030 July 2010 Rhode Island Atomic Energy Commission Ltr. Enclosing Annual Report Required by Rinsc Technical Specifications (Section 6.8.4) ML1001100502009-07-31031 July 2009 Submittal of Annual Report Required by Rinsc Technical Specifications (Section 6.8.4) ML0725000142007-08-27027 August 2007 Transmittal of Annual Report Required by the Rinsc Technical Specifications (Section 6.8.4) ML0525501762005-08-31031 August 2005 Rhode Island Atomic Energy Commission Annual Report, Required by the Rinsc Technical Specification (Section 6.8.4) ML0226002572002-08-26026 August 2002 Forward the Annual Report Required by the Rinsc Technical Specifications Re Reactor Operating Statistics 2023-07-18
[Table view] Category:Letter
MONTHYEARML24200A1632024-07-18018 July 2024 State of Ri, Atomic Energy Comm., Annual Report Required by the Rinsc Technical Specifications IR 05000193/20242022024-06-24024 June 2024 Rhode Island Atomic Energy Commission - U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000193/2024202 - Non-OUO-SRI Cover Letter ML24052A3372024-04-25025 April 2024 Examination Report Letter No. 50-193/OL-24-01, Rhode Island Nuclear Science Center ML24052A3382024-04-25025 April 2024 Examination Result Letter No. 50-193 OL-24-01, Rhode Island Nuclear Science Center IR 05000193/20242012024-04-0303 April 2024 Rhode Island Atomic Energy Commission - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000193/2024201 ML24017A2872024-02-0808 February 2024 Examination Confirmation Letter No. 50-193/Ol-24-01, Rhode Island Nuclear Science Center IR 05000193/20232022023-12-12012 December 2023 Rhode Island Atomic Energy Commission - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000193/2023202 - Cover Letter and Enclosure ML23199A2212023-07-18018 July 2023 Rhode Island Atomic Energy Commission - Annual Report IR 05000193/20232012023-04-14014 April 2023 Rhode Island Atomic Energy Commission U.S. Nuclear Regulatory Commission Routine Inspection Report 05000193-2023201 - Cover Letter and Enclosure ML23037A0602023-02-0606 February 2023 Part 71 Quality Assurance Program Biennial Change Report for the Rhode Island Nuclear Science Center ML23017A0532023-02-0202 February 2023 Examination Confirmation Letter No. 50-193/OL-23-01, Rhode Island Nuclear Science Center IR 05000193/20222022022-12-0808 December 2022 Rhode Island Atomic Energy Commission - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000193-2022202 ML22208A1302022-07-27027 July 2022 State of Rhode Island, Submittal of Annual Report ML22089A2202022-06-0202 June 2022 Rhode Island Atomic Energy Commission - U.S. Nuclear Regulatory Commission Routine Inspection Report IR 05000193/20212032021-12-0606 December 2021 Rhode Island Atomic Energy Commission - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000193/2021203 ML21195A0962021-07-14014 July 2021 Rhode Island Atomic Energy Commission - Annual Report IR 05000193/20212012021-06-0101 June 2021 Rhode Island Atomic Energy Commission U.S. Nuclear Regulatory Commission Routine Inspection Report 05000193/2021201 Cover Letter and Enclosure ML21144A1132021-05-24024 May 2021 Administrative Change to the Rhode Island Nuclear Science Center Security Plan, Docket No. 50-193 ML20196L7352020-07-13013 July 2020 State of Ri, Atomic Energy Commission - Annual Report 2020 IR 05000193/20202012020-04-15015 April 2020 Rhode Island - NRC Routine Inspection Report 05000193/2020201 ML20037A8682020-02-10010 February 2020 Examination Confirmation Letter No. 50/193-OL-20-01, Rhode Island Atomic Energy Commission ML19346E8812019-12-12012 December 2019 State of Rhode Island and Providence Plantations - Written Report for EN54419 ML19212A2842019-07-26026 July 2019 State of Rhode Island and Providence Plantations - Annual Report 2019 IR 05000193/20192022019-03-26026 March 2019 Rhode Island Atomic Energy Commission - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000193/2019202 ML19065A1542019-03-0707 March 2019 Letter to C. Goodwin Quality Assurance Program Approval for Radioactive Material Packages No. 0017, Revision 7 IR 05000193/20182032019-02-15015 February 2019 Rhode Island Atomic Energy Commission - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000193/2018203 ML19007A2672019-01-0707 January 2019 State of Rhode Island and Providence Plantations - Response to Request for Additional Information Dated December 26, 2019, Part 71 Quality Assurance Program ML18361A6452018-12-26026 December 2018 Letter to C. Goodwin Request for Additional Information for Review and Approval of the Rhode Island Nuclear Science Center Part 71 Quality Assurance Program for Packaging and Transportation of Radioactive Material ML18243A1342018-08-31031 August 2018 State of Ri, Atomic Energy Comm., Part 71 Quality Assurance Program Revision for the Rhode Island Nuclear Science Center ML18219B3942018-08-0707 August 2018 State of Ri, Atomic Energy Commission, Submittal of Annual Report Required by the Rinsc Technical Specifications (Section 6.7.1) IR 05000193/20182022018-03-16016 March 2018 Rhode Island Atomic Energy Commission - Nuclear Regulatory Commission Security Inspection Report No. 05000193/2018202 Cover Letter - Public IR 05000193/20182012018-03-0707 March 2018 Rhode Island Atomic Energy Commission - Nuclear Regulatory Commission Routine Inspection Report No. 50-193/2018-201 (Cover Letter & Enclosure) IR 05000193/20172022017-10-24024 October 2017 Rhode Island Atomic Energy Commission - Nuclear Regulatory Commission Routine Inspection Report 05000193/2017202 - Cover Letter and Enclosure ML17201A0052017-07-19019 July 2017 Rhode Island Nuclear Science Center - Annual Operating Report, Per Technical Specifications 6.7.1 ML17094A2372017-04-18018 April 2017 Examination Report No. 50-193-OL-17-01, Rhode Island Atomic Energy Commission ML17075A1772017-04-0707 April 2017 Non-Power Reactor Closeout of Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools for Rhode Island Atomic Energy Commission Docket No. 50-193 (CAC No. A11010) IR 05000193/20172012017-03-22022 March 2017 Rhode Island Atomic Energy Commission - Nuclear Regulatory Commission Routine Inspection Report No. 50-193/2017-201 ML17072A1512017-03-10010 March 2017 Revised Response to Generic Letter 2016-01: Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools ML16337A3222017-01-0505 January 2017 Rhode Island Atomic Energy Commission - Issuance of Renewed Facility Operating License No. R-95 for the Rhode Island Nuclear Science Center Reactor (TAC No. ME1598) ML16337A0692016-12-27027 December 2016 Rhode Island Atomic Energy Commission - Environmental Assessment and Finding of No Significant Impact Regarding Renewal of Facility License No. R-95 for the Rhode Island Nuclear Science Center Reactor (TAC No. ME1598) ML16355A2782016-12-20020 December 2016 Rhode Island Nuclear Science Center, Transmittal of Emergency Plan Dated March 15, 2007 ML16354A1182016-12-19019 December 2016 Supplemental Information Relicensing for the Rhode Island Nuclear Science Center (R-95) ML16350A0422016-12-15015 December 2016 Supplemental Information Relicensing for the Rhode Island Nuclear Science Center (R-95) ML16350A2562016-12-15015 December 2016 Rhode Island Nuclear Science Center - Supplemental Information Regarding Relicensing ML16343A8512016-12-0808 December 2016 State of Rhode Island and Province Plantations - Supplemental Information Regarding Relicensing for the Rhode Island Nuclear Science Center ML16319A2992016-11-14014 November 2016 Rhode Island Atomic Energy Commission - Transmittal of Supplemental Information in Support of Relicensing for the Rhode Island Nuclear Science Center (R-95) ML16355A2922016-11-13013 November 2016 Rhode Island Nuclear Science Center, Emergency Plan Update ML16306A0642016-11-0101 November 2016 State of Rhode Island and Providence Plantations - Response to Request for Additional Information Regarding Calculations for Fuel Element Failure Accident Scenario ML16280A5512016-10-25025 October 2016 Rhode Island Atomic Energy Commission - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-193/2016-203 ML16280A4212016-10-0606 October 2016 State of Rhodes Island and Province Plantations - Response to Request for Additional Dated August 3, 2016 2024-07-18
[Table view] |
Text
August 28, 2015 Docket No. 5 0-193 Mr. Patrick Boyle, Project Manager Research and Test Reactor Licensing Branch Division of Policy and Rulemaking U.S. Nuclear Regulatory Commission (NRC)
Office of Nuclear Reactor Regulation Washington, DC 20555
Dear Mr. Boyle:
This letter and the enclosures constitute the annual report required by the RTNSC Technical Specifications (Section 6.8.4). Enclosure 1 provides reactor operating statistics. Enclosure 2 provides information pertaining to unscheduled reactor shutdowns or scrams. Enclosure 3 discusses maintenance operations performed during the reporting period. Enclosure 4 describes changes to the facility carried out under the conditions of Section 50.59 of Chapter 10 of the Code of Federal Regulations. Lastly, Enclosure 5 summarizes the radiological controls information. if there are any questions regarding this information, please call me at 401-874-9451.
Sincerely, Constance Hathaway Health Physicist Enclosures (5)
Copy to:
Mr. Craig Bassett, USNRC Dr. John J. Breen, Chairman, NRSC Dr. Clinton Chichester, Chairman, RLALEC Dr. Nancy Breen, RIAEC Mr. Howard Chun, RIAEC Dr. Bahram Nassersharif, RIAEC Dr. Yana K. Reshetnyak, RIAIEC -- O ,()
I P
ENCLOSURE 1 REACTOR OPERATING STATISTICS' Technical Specifications Section 6.8.4.a Month Year Operating Hours Energy (MXVI) Energy (M\WD)
July 2014 45.73 52.60 2.19 August 2014 : 48.10 38.55 1.60 September 2014 30.78 40.17 1.67 October .* 2014 15.68 20.13 0.84 November' 2014 26.85 33.08 1.38 Decemiber 2014 30.18 38.72* 1.61 January' . 2015 23.70 29.73 1.24 February 2015 33.90 27.57, 1.15 Marchf*, 2015 36.05 39.87 1.66
-AprilF.,. " 2015.: 38.43 35.35 .. 1.47 ...
May:; 2015 30.90 36.53 1.52 June ' ,.
- 2015. 32.78 42.30 * , 1.76 i.
TOTALU FY2015 393.08 434.60 18.11 Total Energy Output since Initial Criticality: 65,142.92 MWbrs or 2714.29 M7Wdays.
ENCLOSURE 2 UJNSCHEfDULED SItIJTD OWNS OR S CRAMS The following is a list of the unscheduled shutdowns, or scrams that occurred during the 2014-2015 reporting period. This information is required by Technical Specification 6.8.4.b Date Run No. Logbook Page- Cause *Description 07/09/14 8890 60 78 Instrumentation Scram caused
_____________by power loss 08/04/14 8904 60 .93/94- Instrumentation. .Short Period
... "..._ and.Operator scram du~to
. * !... .interference
, . . - :,./ ' " -with wires ov,*r-
,' - -, . *bridge during
,.. .. ,rod adjustment.!'
..... . ...... :-. ... .Hi-flux sc* "i i ... . .. : .. . .. . . . .due to op" -
- , ., .. 5:... . . . - errdor i.*) !.
08/14/14 .891.1 60 :.01 1 ... Instrurrie'ntation .. Scram dfie*fo"
., ... ' "period spike'-:
11/10/14 8942 60 '.132/133 Meclhanical Overpower:.,
- . - ... -..,. .:>, ,. - scram -duiring.
... ...... ..... ... swap5 ~fcooling -
loops during operation. Cold "water in idle' loop caused overpower 11/18/14 8945 60 36 Operator Hi Power scram during startup -
operator error 02/20/15 8975 61 10 Instrumentation Reactor Scram due to noise 02/23/15 8976 61 11 Instrumentation Short period scram due to noise 02/26/15 8979 61 14 Operator Scram due to
______________operator error 03/23/15 8988 61 23 Mechanical Scram due to power surge throughout facility 04/23/15 9006 61 43 Operator Overpower scram due to operator error 0 8/26/15 9048 61 87/8 8 Instrumentation Unscheduled shutdown due to power surge and two overpower scrams due to instrumentation issue during testing
ENCLOSURE 3 MAINTENACE OPERATIONS .,
Technical Specification 6.8.4.c requires a listing of the major maintenance operations performed in the 2014-2015 reporting period including their impact upon the safe operation o9fthe reactor and the reasons for the corrective maintenance.
As stated in last year's report, a maj or security system upgrade was made to the facility beginning in April of 2014. The system went live as of July 30m, 2014. The system has been tested several times in accordance with quarterly facility testing requirements and is working as expected.
ENCLOSURE 4 FACILITY CHANGES -i0CFR50.59 REVIIEW Technical Specification 6.8.4.d requires that We provide a listing and description of any 10 CFR 50.59' evaluations conducted during the 2014-2015 reporting period. ,"
There were no facility changes made during this period requiring a 10 CFR 50.59 evaluation.
ENCLOSURE 5-*
RADIOLOGICAL CONTROLS "
- 1. Environmental Surveys outside the Facility - Technical Specification 6.8.4.e Quarterly TLD 1 badges are deployed outside the reactor building in three separate locations. The general public 'does not frequent these locations and therefore occupancy factors may be used to approximate annual dose. The allowable external dose rates must be below 100 mrem per year.
The quarterly doses in units of mr* em are shown in the table below.
LOCATION ' 3 rd QTR 201'4 '4 th QTh 201'4 1 st QTR 2015 " 2 nd QTR 2015 Northeast Wall 0 33 0 " No report available
'Demineralizer " 116 "" ... '":... -.... '80 ":-: No report available
- D oor '"-.: :" . '- . . .. . .
'Heat Exchanger. 29 *" ... ,-:.;" 0. ,
-', :" 35 :*;:'. -,":. . No report available D oor,:.,; : . .________...._____. __ ,__________
S.....,*:These aras are minocations wher~e-access is limited. Consequently, the general public will not
.......frequent .theseareas, and appropriate occupancy factors can be used to approximate anual dose.
S.......Assumig.that the maximum time that a. member of the general public would lbeprescent .in one of S....these locations, is 1.0 minutes per day, an. occupancy factor of 0.01 can be used to obtain 'the annual dose that would be received by a member of the general public, in any. of these- areas.
The annual dose rate at the Northeast Wall, Demineralizer and Heat Exchanger Doors is dependent on the operations schedule of the reactor. Ignoring the fact that the dose rate is not present 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day, and applying the occupancy factor of 0.01, the annual dose that would be receive by an individual in the demineralizer room would be 2.79 moremo. The dose received at the Heat Exchanger Door would be 0.64 torero. The annual dose received at the Northeast wall would be 0.33 mrem. The variations from quarter to quarter and from previous reports were due in part to movements of items within the reactor building during the fiscal year and varying use of the different irradiation facilities. Note that while dose reports for the second quarter of this year (2015) are not available at the time of this writing, these doses are not expected to significantly change the overall annual dose received by the general public. This expectation is based on the history of these dose values and lack of change of factors which could affect dose rates.
- 2. Annual Exposures Exceeding 500mrem - Technical Specification 6.8.4.f There were no personnel exposures greater than 500 mrem.
- 3. Radioactive Effluents - Technical Specification 6.8.4.g A. Individual gaseous effluent concentrations for each reactor operation are recorded on the Monthly Information Sheets (Form NSC-78). The concentration of radioactive materials in the 1
Thermoluminescent Dosimeter; Radiation Detection Co. reads the dosimeters at minimum oft10 mrem.
effluent released from the facility exhaust stacks shall not exceed 1E+05 times concentrations specified in 1OCiFR20, Appendix.B, Table II, when averaged over time periods permitted by 10CFR20. 2 Gamma spectroscopy of stack gas samples has shown that the principal gaseous effluent is Argon-4 1. The maximum concentration for this principle contaminant permitted under Technical Specifications is 1E-8. jiCi/cc xlE+5 = 1E-3 jgCi/cc. Concentrations released during.the year were less than 0.02 of that limit. , .. .
The total Argon-41 release during the reporting period was 6.0831E+l curies. The calculated effective dose equivalent for their release is 1.3.mrem/year (COMPLY Code): ... ;
B. Liquid effluent concentrations~released to the sewer are documented pn the Sewer Discharge" Radioassay Report (NSC-09). Each release was approved prior to discharge with its ph being within the acceptable range and with the sum of the fractions of the respective-radjoisotopes l15r month being below the discharge limit of 1. For the. reporting period, the total volume of-.;....
discharge was 3,406,870 ml. The isotopes and their relative activities discharged are given below.
,Radioisotope * "' :Totail Acfiiity Discharged (microcuries)
H3 : .. .. * ,*414 i " . . . .*
C1"4 .. : :.::- * ' *420 **. : : *
.Cdl09 . ,... . . . .. 11.3 :. . . ,
.Pb21.4. .... 2.72 ..
Bi214 5.62 STechnical Specifications, Section 3.7.2.