WEEKMONTHYEAR05000289/LER-2017-0042018-02-050Start date: 5 February 2018 Site: Three Mile Island, Three Mile Island Unit 1 Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000296/LER-2017-0022017-12-290Start date: 29 December 2017 Site: Browns Ferry Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000266/LER-2017-0012017-09-180Start date: 18 September 2017, 16 November 2017 Site: Point Beach Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 05000482/LER-2017-0032017-09-070Start date: 7 September 2017, 2 November 2017 Site: Wolf Creek Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000483/LER-2017-0022017-08-150Start date: 15 August 2017, 13 October 2017 Site: Callaway Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications, 10 CFR 50.73(a)(2)(ix)(A), Prevented Safety Function in Multiple System 05000346/LER-2017-0012017-07-200Start date: 20 July 2017, 18 September 2017 Site: Davis Besse Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v), Loss of Safety Function, 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000321/LER-2017-0042017-08-240Start date: 24 August 2017 Site: Hatch Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000335/LER-2017-0022017-07-310Start date: 31 July 2017 Site: Saint Lucie Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000461/LER-2017-0022017-07-050Start date: 5 July 2017 Site: Clinton Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000313/LER-2016-0032016-08-240Start date: 24 August 2016, 9 June 2017 Site: Arkansas Nuclear Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident 05000368/LER-2017-0012017-04-060Start date: 6 April 2017, 30 May 2017 Site: Arkansas Nuclear, Arkansas Nuclear One – Unit 2 Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000334/LER-2017-0012017-02-030Start date: 3 February 2017, 18 April 2017 Site: Beaver Valley Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications, 10 CFR 50.73(a)(2)(ix)(A), Prevented Safety Function in Multiple System 05000458/LER-2017-0022017-02-180Start date: 18 February 2017, 18 April 2017 Site: River Bend Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.73(a)(2)(v), Loss of Safety Function 05000482/LER-2017-0022017-04-050Start date: 5 April 2017 Site: Wolf Creek Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000277/LER-2017-0012017-03-080Start date: 8 March 2017 Site: Peach Bottom Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000445/LER-2016-0022017-02-220Start date: 22 February 2017 Site: Comanche Peak Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v), Loss of Safety Function, 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications, 10 CFR 50.73(a)(2)(ix)(A), Prevented Safety Function in Multiple System 05000348/LER-2016-0092016-12-070Start date: 7 December 2016, 2 February 2017 Site: Farley Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000461/LER-2016-0112016-11-170Start date: 17 November 2016 Site: Clinton Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000263/LER-2016-0022016-08-040Start date: 4 August 2016, 30 September 2016 Site: Monticello Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000346/LER-2016-0062016-08-150Start date: 15 August 2016 Site: Davis Besse Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.73(a)(2)(v), Loss of Safety Function, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000261/LER-2016-0032016-08-110Start date: 11 August 2016 Site: Robinson Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 05000390/LER-2016-0102016-06-080Start date: 8 June 2016, 8 August 2016 Site: Watts Bar Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000317/LER-2016-0042015-11-130Start date: 13 November 2015, 20 July 2016 Site: Calvert Cliffs Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 05000263/LER-2014-0022014-02-070Start date: 7 February 2014, 13 July 2016 Site: Monticello Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000293/LER-2016-0032016-05-120Start date: 12 May 2016, 11 July 2016 Site: Pilgrim Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000285/LER-2016-0022016-05-100Start date: 10 May 2016, 7 July 2016 Site: Fort Calhoun Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000282/LER-2016-0042016-04-210Start date: 21 April 2016, 21 June 2016 Site: Prairie Island Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000483/LER-2016-0012016-04-200Start date: 20 April 2016, 20 June 2016 Site: Callaway Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000261/LER-2016-0022016-04-130Start date: 13 April 2016, 13 June 2016 Site: Robinson Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000247/LER-2016-0042016-03-290Start date: 29 March 2016, 31 May 2016 Site: Indian Point Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000454/LER-2016-0012016-05-030Start date: 3 May 2016 Site: Byron Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000456/LER-2016-0012016-03-040Start date: 4 March 2016, 28 April 2016 Site: Braidwood Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000331/LER-2015-0022015-03-310Start date: 31 March 2015, 28 January 2016 Site: Duane Arnold Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000461/LER-2016-0012016-01-200Start date: 20 January 2016 Site: Clinton Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident 05000282/LER-2016-0032016-01-070Start date: 7 January 2016 Site: Prairie Island Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000285/LER-2015-0062015-10-210Start date: 21 October 2015 Site: Fort Calhoun Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000272/LER-2015-0062015-08-260Start date: 26 August 2015 Site: Salem Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000454/LER-2015-0042015-08-200Start date: 20 August 2015 Site: Byron Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000456/LER-2015-0032015-08-200Start date: 20 August 2015 Site: Braidwood Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000247/LER-2015-0022015-08-180Start date: 18 August 2015 Site: Indian Point Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v), Loss of Safety Function, 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 05000483/LER-2015-004, Auxiliary Feedwater Control Valve Inoperable Due To Faulty Electronic Positioner Card2015-08-110Start date: 11 August 2015 Site: Callaway Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000483/LER-2015-0042015-08-110Start date: 11 August 2015 Site: Callaway Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000373/LER-2015-0022014-12-120Start date: 12 December 2014 Site: Lasalle Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000269/LER-2014-0022014-11-250Start date: 25 November 2014 Site: Oconee Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000346/LER-2014-0042014-11-250Start date: 25 November 2014 Site: Davis Besse Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000389/LER-2014-0012014-07-250Start date: 25 July 2014 Site: Saint Lucie Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability, 10 CFR 50.73(a)(2)(i), 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 05000400/LER-2014-0022014-06-120Start date: 12 June 2014 Site: Harris Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000263/LER-2014-0082014-05-150Start date: 15 May 2014 Site: Monticello Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000220/LER-2014-0022014-05-080Start date: 8 May 2014 Site: Nine Mile Point Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(ix)(A), Prevented Safety Function in Multiple System 05000269/LER-2014-0012014-03-280Start date: 28 March 2014 Site: Oconee Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000263/LER-2014-0052014-03-200Start date: 20 March 2014 Site: Monticello Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000325/LER-2014-0042014-03-200Start date: 20 March 2014 Site: Brunswick Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000321/LER-2014-0012014-03-140Start date: 14 March 2014 Site: Hatch Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000244/LER-2014-0022014-03-130Start date: 13 March 2014 Site: Ginna Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000423/LER-2014-0022014-03-120Start date: 12 March 2014 Site: Millstone Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000390/LER-2014-0022014-02-110Start date: 11 February 2014 Site: Watts Bar Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000458/LER-2014-0012014-01-090Start date: 9 January 2014 Site: River Bend Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000272/LER-2014-0012014-01-070Start date: 7 January 2014 Site: Salem Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v), Loss of Safety Function, 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 05000389/LER-2013-0052013-12-190Start date: 19 December 2013 Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor 05000348/LER-2013-0042013-12-160Start date: 16 December 2013 Site: Farley Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000271/LER-2013-0022013-11-070Start date: 7 November 2013 Site: Vermont Yankee Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v), Loss of Safety Function 05000498/LER-2013-0032013-10-310Start date: 31 October 2013 Site: South Texas Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v), Loss of Safety Function 05000336/LER-2013-0032013-10-300Start date: 30 October 2013 Site: Millstone Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000410/LER-2013-0032013-10-220Start date: 22 October 2013 Site: Nine Mile Point Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(ix)(A), Prevented Safety Function in Multiple System 05000220/LER-2013-0022013-10-220Start date: 22 October 2013 Site: Nine Mile Point Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(ix)(A), Prevented Safety Function in Multiple System 05000440/LER-2013-0042013-10-170Start date: 17 October 2013 Site: Perry Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000395/LER-2013-0052013-10-160Start date: 16 October 2013 Site: Summer Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(i)(C), 50.54(x) TS Deviation 05000482/LER-2013-0092013-10-090Start date: 9 October 2013 Site: Wolf Creek Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000483/LER-2013-0092013-10-090Start date: 9 October 2013 Site: Callaway Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v), Loss of Safety Function 05000528/LER-2013-0032013-10-040Start date: 4 October 2013 Site: Palo Verde Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v), Loss of Safety Function 05000285/LER-2015-001, Inadequate Design of High Energy Line Break Barriers2013-09-300Start date: 30 September 2013 Site: Fort Calhoun Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000285/LER-2015-0012013-09-300Start date: 30 September 2013 Site: Fort Calhoun Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000244/LER-2013-0032013-09-200Start date: 20 September 2013 Site: Ginna Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 05000461/LER-2013-0052013-09-200Start date: 20 September 2013 Site: Clinton Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000382/LER-2013-0062013-09-040Start date: 4 September 2013 Site: Waterford Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000366/LER-2013-0042013-08-130Start date: 13 August 2013 Site: Hatch Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000382/LER-2013-0052013-05-220Start date: 22 May 2013 Site: Waterford Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications, 10 CFR 50.73(a)(2)(i)(C), 50.54(x) TS Deviation 05000244/LER-2013-0012013-04-120Start date: 12 April 2013 Site: Ginna Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000528/LER-2013-0012013-03-080Start date: 8 March 2013 Site: Palo Verde Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000269/LER-2013-0012013-02-060Start date: 6 February 2013 Site: Oconee Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v), Loss of Safety Function, 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000285/LER-2013-0032013-01-300Start date: 30 January 2013 Site: Fort Calhoun Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident 05000327/LER-2012-0012012-12-120Start date: 12 December 2012 Site: Docket Number Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 05000247/LER-2012-0092012-11-280Start date: 28 November 2012 Site: Indian Point Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat 05000414/LER-2012-0012012-10-230Start date: 23 October 2012 Site: Docket Number Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.73(a)(2)(v), Loss of Safety Function, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications, 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition
[Table view] |