ML17319B323
From kanterella
Revision as of 23:34, 23 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML17319B323 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 04/07/1982 |
From: | FRANKLIN INSTITUTE |
To: | NRC |
Shared Package | |
ML17319B322 | List: |
References | |
RTR-NUREG-0737, RTR-NUREG-737 IEB-79-01B, IEB-79-1B, RAI-C5257-498, RAI-C5257-498-R02, RAI-C5257-498-R2, NUDOCS 8205170047 | |
Download: ML17319B323 (9) | |
Similar Documents at Cook | |
---|---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML17335A1681998-03-31031 March 1998
[Table view]Final TER on step-2 Review of IPEEE at DC Cook Nuclear Plant,Units 1 & 2, March 1998 ML17334A6111998-01-0707 January 1998 TER Confirmatory Calculations of DC Cook Sump Water Level. ML17333A6911996-06-28028 June 1996 Rev 0 to, Review of Donald C. Cook Nuclear Power Plant Methodology for Analysis of Fire Barrier Ampacity Derating Factors, Ltr Rept ML17333A5511994-12-0404 December 1994 Ltr Rept, Evaluation of Cook Ipe/Hra Matls. ML20126H1381991-07-31031 July 1991 Draft Afs Risk-Based Insp Guide for DC Cook Nuclear Power Plant ML20082K7531991-07-30030 July 1991 Final Rept SAIC-91/6677, Technical Evaluation Rept for Cook Nuclear Plant Units 1 & 2 Station Blackout Evaluation ML17328A1251989-06-30030 June 1989 Pump & Valve Inservice Testing Program,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20245H2301989-02-15015 February 1989 Internal Conduit Fire Seal Program,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML17328A8721988-07-30030 July 1988 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Indiana & Michigan Electric Co, DC Cook Nuclear Plant Unit 2. ML17328A8711988-07-30030 July 1988 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Indiana & Michigan Electric Co, DC Cook Nuclear Plant,Unit 1. ML17334B1091987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components:Cook 1 & 2, Final Informal Rept ML20214R8651987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Cook-1 & -2,Haddam Neck, Final Informal Rept ML20204G4181987-03-31031 March 1987 Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components) Cook Units 1 & 2 ML17334B1101987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification,Cook Units 1 & 2, Informal Rept ML17334B0721987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28 Reactor Trip Sys Vendor Interface,Cook Units 1 & 2 & Haddam Neck. ML17324B2461987-02-0606 February 1987 Dcrdr Evaluations,Phases III-V,DC Cook Units 1 & 2, Informal Technical Communication ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML17324B2191986-11-0606 November 1986 Review of App R Procedures for Post-Fire Remote Emergency Shutdown Outside Control Room,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20207A7041986-06-30030 June 1986 Conformance to Reg Guide 1.97,DC Cook Nuclear Plant Units 1 & 2 ML20197J4641986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Catawba Nuclear Stations 1 & 2,DC Cook Nuclear Power Plants 1 & 2,WB McGuire Nuclear Stations 1 & 2,Sequoyah Nuclear Plants 1 & 2 ML17324A9561986-03-31031 March 1986 Technical Evaluation Rept of 1984 Meteorological Data from Donald C Cook Nuclear Power Plant. ML17321A9321985-10-17017 October 1985 Review of Licensee...Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for DC Cook..., Technical Evaluation Rept ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20206F3131985-02-0404 February 1985 Revised Containment Hydrogen Analysis Review of DC Cook, Program Ltr Rept.Related Documentation Encl ML17320A4811983-09-30030 September 1983 DC Cook,Units 1 & 2 Inservice Insp Plan, Technical Evaluation Rept ML20077L8511983-09-0101 September 1983 Control of Heavy Loads (C-10) Indiana & Michigan Electric Co,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20077K9771983-07-27027 July 1983 Revised Masonry Wall Design (B-59),DC Cook Nuclear Plant, Units 1 & 2, Technical Evaluation Rept ML17320A5491983-02-24024 February 1983 Draft Control of Heavy Loads (C-10),Donald C Cook Nuclear Power Plant Units 1 & 2, Technical Evaluation Rept ML20076C4091983-01-27027 January 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Cook Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20027D1821982-10-28028 October 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts (F-11 & B-60),DC Cook Nuclear Plant Unit 1, Technical Evaluation Rept,Vols 1 & 2 ML20027D1811982-10-28028 October 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Technical Evaluation Rept.Vols I & II ML20069H8611982-10-0808 October 1982 Radiological Effluent Tech Spec Implementation (A-2),DC Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML17319B6161982-09-0303 September 1982 DC Cook Nuclear Plant Units 1 & 2,Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20069D0761982-08-17017 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Final Technical Evaluation Rept ML20062E2251982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations.D.C. Cook Case Study.Docket Nos. 50-315 and 50-316.(Indiana and Michigan Electric Company) ML18005A0091982-04-0808 April 1982 to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17319B3231982-04-0707 April 1982 to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17319B2871982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, Donald C Cook Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20041D7251982-01-31031 January 1982 Tech Specs for Redundant Decay Heat Removal Capability, Donald C Cook Nuclear Plant,Units 1 & 2, Preliminary Technical Evaluation Rept ML17326A9271981-11-20020 November 1981 Control of Heavy Loads. ML20132C5541981-05-31031 May 1981 Technical Evaluation of Response to Position 5 of Item II.E.4.2 of NUREG-0737,Containment Isolation Setpoint for DC Cook Nuclear Power Plant Units 1 & 2 ML19347E9081981-04-30030 April 1981 Adequacy of Station Electric Distribution Sys Voltages,Dc Cook Units 1 & 2, Technical Evaluation Rept ML17319A9411981-04-27027 April 1981 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication, Technical Evaluation Rept ML19240C0001981-03-31031 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Technical Evaluation Rept ML20003C1061981-01-31031 January 1981 Technical Evaluation Rept,Adequacy of Station Electrical Distribution Sys Voltages,Dc Cook Nuclear Station Units 2 & 3, Preliminary Rept ML17331A6131980-11-30030 November 1980 Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Dc Cook Units 1 & 2, Revised Technical Evaluation Rept ML17326A7511980-09-30030 September 1980 Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Donald C. Cook Units 1 & 2, Technical Evaluation Rept 1998-03-31 Category:QUICK LOOK MONTHYEARML17335A1681998-03-31031 March 1998
[Table view]Final TER on step-2 Review of IPEEE at DC Cook Nuclear Plant,Units 1 & 2, March 1998 ML17334A6111998-01-0707 January 1998 TER Confirmatory Calculations of DC Cook Sump Water Level. ML17333A6911996-06-28028 June 1996 Rev 0 to, Review of Donald C. Cook Nuclear Power Plant Methodology for Analysis of Fire Barrier Ampacity Derating Factors, Ltr Rept ML17333A5511994-12-0404 December 1994 Ltr Rept, Evaluation of Cook Ipe/Hra Matls. ML20126H1381991-07-31031 July 1991 Draft Afs Risk-Based Insp Guide for DC Cook Nuclear Power Plant ML20082K7531991-07-30030 July 1991 Final Rept SAIC-91/6677, Technical Evaluation Rept for Cook Nuclear Plant Units 1 & 2 Station Blackout Evaluation ML17328A1251989-06-30030 June 1989 Pump & Valve Inservice Testing Program,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20245H2301989-02-15015 February 1989 Internal Conduit Fire Seal Program,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML17328A8721988-07-30030 July 1988 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Indiana & Michigan Electric Co, DC Cook Nuclear Plant Unit 2. ML17328A8711988-07-30030 July 1988 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Indiana & Michigan Electric Co, DC Cook Nuclear Plant,Unit 1. ML17334B1091987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components:Cook 1 & 2, Final Informal Rept ML20214R8651987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Cook-1 & -2,Haddam Neck, Final Informal Rept ML20204G4181987-03-31031 March 1987 Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components) Cook Units 1 & 2 ML17334B1101987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification,Cook Units 1 & 2, Informal Rept ML17334B0721987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28 Reactor Trip Sys Vendor Interface,Cook Units 1 & 2 & Haddam Neck. ML17324B2461987-02-0606 February 1987 Dcrdr Evaluations,Phases III-V,DC Cook Units 1 & 2, Informal Technical Communication ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML17324B2191986-11-0606 November 1986 Review of App R Procedures for Post-Fire Remote Emergency Shutdown Outside Control Room,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20207A7041986-06-30030 June 1986 Conformance to Reg Guide 1.97,DC Cook Nuclear Plant Units 1 & 2 ML20197J4641986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Catawba Nuclear Stations 1 & 2,DC Cook Nuclear Power Plants 1 & 2,WB McGuire Nuclear Stations 1 & 2,Sequoyah Nuclear Plants 1 & 2 ML17324A9561986-03-31031 March 1986 Technical Evaluation Rept of 1984 Meteorological Data from Donald C Cook Nuclear Power Plant. ML17321A9321985-10-17017 October 1985 Review of Licensee...Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for DC Cook..., Technical Evaluation Rept ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20206F3131985-02-0404 February 1985 Revised Containment Hydrogen Analysis Review of DC Cook, Program Ltr Rept.Related Documentation Encl ML17320A4811983-09-30030 September 1983 DC Cook,Units 1 & 2 Inservice Insp Plan, Technical Evaluation Rept ML20077L8511983-09-0101 September 1983 Control of Heavy Loads (C-10) Indiana & Michigan Electric Co,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20077K9771983-07-27027 July 1983 Revised Masonry Wall Design (B-59),DC Cook Nuclear Plant, Units 1 & 2, Technical Evaluation Rept ML17320A5491983-02-24024 February 1983 Draft Control of Heavy Loads (C-10),Donald C Cook Nuclear Power Plant Units 1 & 2, Technical Evaluation Rept ML20076C4091983-01-27027 January 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Cook Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20027D1821982-10-28028 October 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts (F-11 & B-60),DC Cook Nuclear Plant Unit 1, Technical Evaluation Rept,Vols 1 & 2 ML20027D1811982-10-28028 October 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Technical Evaluation Rept.Vols I & II ML20069H8611982-10-0808 October 1982 Radiological Effluent Tech Spec Implementation (A-2),DC Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML17319B6161982-09-0303 September 1982 DC Cook Nuclear Plant Units 1 & 2,Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20069D0761982-08-17017 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Final Technical Evaluation Rept ML20062E2251982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations.D.C. Cook Case Study.Docket Nos. 50-315 and 50-316.(Indiana and Michigan Electric Company) ML18005A0091982-04-0808 April 1982 to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17319B3231982-04-0707 April 1982 to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17319B2871982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, Donald C Cook Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20041D7251982-01-31031 January 1982 Tech Specs for Redundant Decay Heat Removal Capability, Donald C Cook Nuclear Plant,Units 1 & 2, Preliminary Technical Evaluation Rept ML17326A9271981-11-20020 November 1981 Control of Heavy Loads. ML20132C5541981-05-31031 May 1981 Technical Evaluation of Response to Position 5 of Item II.E.4.2 of NUREG-0737,Containment Isolation Setpoint for DC Cook Nuclear Power Plant Units 1 & 2 ML19347E9081981-04-30030 April 1981 Adequacy of Station Electric Distribution Sys Voltages,Dc Cook Units 1 & 2, Technical Evaluation Rept ML17319A9411981-04-27027 April 1981 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication, Technical Evaluation Rept ML19240C0001981-03-31031 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Technical Evaluation Rept ML20003C1061981-01-31031 January 1981 Technical Evaluation Rept,Adequacy of Station Electrical Distribution Sys Voltages,Dc Cook Nuclear Station Units 2 & 3, Preliminary Rept ML17331A6131980-11-30030 November 1980 Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Dc Cook Units 1 & 2, Revised Technical Evaluation Rept ML17326A7511980-09-30030 September 1980 Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Donald C. Cook Units 1 & 2, Technical Evaluation Rept 1998-03-31 Category:ETC. (PERIODIC MONTHYEARML17335A1681998-03-31031 March 1998
[Table view]Final TER on step-2 Review of IPEEE at DC Cook Nuclear Plant,Units 1 & 2, March 1998 ML17334A6111998-01-0707 January 1998 TER Confirmatory Calculations of DC Cook Sump Water Level. ML17333A6911996-06-28028 June 1996 Rev 0 to, Review of Donald C. Cook Nuclear Power Plant Methodology for Analysis of Fire Barrier Ampacity Derating Factors, Ltr Rept ML17333A5511994-12-0404 December 1994 Ltr Rept, Evaluation of Cook Ipe/Hra Matls. ML20126H1381991-07-31031 July 1991 Draft Afs Risk-Based Insp Guide for DC Cook Nuclear Power Plant ML20082K7531991-07-30030 July 1991 Final Rept SAIC-91/6677, Technical Evaluation Rept for Cook Nuclear Plant Units 1 & 2 Station Blackout Evaluation ML17328A1251989-06-30030 June 1989 Pump & Valve Inservice Testing Program,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20245H2301989-02-15015 February 1989 Internal Conduit Fire Seal Program,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML17328A8721988-07-30030 July 1988 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Indiana & Michigan Electric Co, DC Cook Nuclear Plant Unit 2. ML17328A8711988-07-30030 July 1988 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Indiana & Michigan Electric Co, DC Cook Nuclear Plant,Unit 1. ML17334B1091987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components:Cook 1 & 2, Final Informal Rept ML20214R8651987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Cook-1 & -2,Haddam Neck, Final Informal Rept ML20204G4181987-03-31031 March 1987 Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components) Cook Units 1 & 2 ML17334B1101987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification,Cook Units 1 & 2, Informal Rept ML17334B0721987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28 Reactor Trip Sys Vendor Interface,Cook Units 1 & 2 & Haddam Neck. ML17324B2461987-02-0606 February 1987 Dcrdr Evaluations,Phases III-V,DC Cook Units 1 & 2, Informal Technical Communication ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML17324B2191986-11-0606 November 1986 Review of App R Procedures for Post-Fire Remote Emergency Shutdown Outside Control Room,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20207A7041986-06-30030 June 1986 Conformance to Reg Guide 1.97,DC Cook Nuclear Plant Units 1 & 2 ML20197J4641986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Catawba Nuclear Stations 1 & 2,DC Cook Nuclear Power Plants 1 & 2,WB McGuire Nuclear Stations 1 & 2,Sequoyah Nuclear Plants 1 & 2 ML17324A9561986-03-31031 March 1986 Technical Evaluation Rept of 1984 Meteorological Data from Donald C Cook Nuclear Power Plant. ML17321A9321985-10-17017 October 1985 Review of Licensee...Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for DC Cook..., Technical Evaluation Rept ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20206F3131985-02-0404 February 1985 Revised Containment Hydrogen Analysis Review of DC Cook, Program Ltr Rept.Related Documentation Encl ML17320A4811983-09-30030 September 1983 DC Cook,Units 1 & 2 Inservice Insp Plan, Technical Evaluation Rept ML20077L8511983-09-0101 September 1983 Control of Heavy Loads (C-10) Indiana & Michigan Electric Co,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20077K9771983-07-27027 July 1983 Revised Masonry Wall Design (B-59),DC Cook Nuclear Plant, Units 1 & 2, Technical Evaluation Rept ML17320A5491983-02-24024 February 1983 Draft Control of Heavy Loads (C-10),Donald C Cook Nuclear Power Plant Units 1 & 2, Technical Evaluation Rept ML20076C4091983-01-27027 January 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Cook Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20027D1821982-10-28028 October 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts (F-11 & B-60),DC Cook Nuclear Plant Unit 1, Technical Evaluation Rept,Vols 1 & 2 ML20027D1811982-10-28028 October 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Technical Evaluation Rept.Vols I & II ML20069H8611982-10-0808 October 1982 Radiological Effluent Tech Spec Implementation (A-2),DC Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML17319B6161982-09-0303 September 1982 DC Cook Nuclear Plant Units 1 & 2,Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20069D0761982-08-17017 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Final Technical Evaluation Rept ML20062E2251982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations.D.C. Cook Case Study.Docket Nos. 50-315 and 50-316.(Indiana and Michigan Electric Company) ML18005A0091982-04-0808 April 1982 to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17319B3231982-04-0707 April 1982 to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17319B2871982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, Donald C Cook Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20041D7251982-01-31031 January 1982 Tech Specs for Redundant Decay Heat Removal Capability, Donald C Cook Nuclear Plant,Units 1 & 2, Preliminary Technical Evaluation Rept ML17326A9271981-11-20020 November 1981 Control of Heavy Loads. ML20132C5541981-05-31031 May 1981 Technical Evaluation of Response to Position 5 of Item II.E.4.2 of NUREG-0737,Containment Isolation Setpoint for DC Cook Nuclear Power Plant Units 1 & 2 ML19347E9081981-04-30030 April 1981 Adequacy of Station Electric Distribution Sys Voltages,Dc Cook Units 1 & 2, Technical Evaluation Rept ML17319A9411981-04-27027 April 1981 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication, Technical Evaluation Rept ML19240C0001981-03-31031 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Technical Evaluation Rept ML20003C1061981-01-31031 January 1981 Technical Evaluation Rept,Adequacy of Station Electrical Distribution Sys Voltages,Dc Cook Nuclear Station Units 2 & 3, Preliminary Rept ML17331A6131980-11-30030 November 1980 Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Dc Cook Units 1 & 2, Revised Technical Evaluation Rept ML17326A7511980-09-30030 September 1980 Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Donald C. Cook Units 1 & 2, Technical Evaluation Rept 1998-03-31 Category:TEXT-PROCUREMENT & CONTRACTS MONTHYEARML17335A1681998-03-31031 March 1998
[Table view]Final TER on step-2 Review of IPEEE at DC Cook Nuclear Plant,Units 1 & 2, March 1998 ML17334A6111998-01-0707 January 1998 TER Confirmatory Calculations of DC Cook Sump Water Level. ML17333A6911996-06-28028 June 1996 Rev 0 to, Review of Donald C. Cook Nuclear Power Plant Methodology for Analysis of Fire Barrier Ampacity Derating Factors, Ltr Rept ML17333A5511994-12-0404 December 1994 Ltr Rept, Evaluation of Cook Ipe/Hra Matls. ML20126H1381991-07-31031 July 1991 Draft Afs Risk-Based Insp Guide for DC Cook Nuclear Power Plant ML20082K7531991-07-30030 July 1991 Final Rept SAIC-91/6677, Technical Evaluation Rept for Cook Nuclear Plant Units 1 & 2 Station Blackout Evaluation ML17328A1251989-06-30030 June 1989 Pump & Valve Inservice Testing Program,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20245H2301989-02-15015 February 1989 Internal Conduit Fire Seal Program,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML17328A8721988-07-30030 July 1988 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Indiana & Michigan Electric Co, DC Cook Nuclear Plant Unit 2. ML17328A8711988-07-30030 July 1988 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Indiana & Michigan Electric Co, DC Cook Nuclear Plant,Unit 1. ML17334B1091987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components:Cook 1 & 2, Final Informal Rept ML20214R8651987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Cook-1 & -2,Haddam Neck, Final Informal Rept ML20204G4181987-03-31031 March 1987 Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components) Cook Units 1 & 2 ML17334B1101987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification,Cook Units 1 & 2, Informal Rept ML17334B0721987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28 Reactor Trip Sys Vendor Interface,Cook Units 1 & 2 & Haddam Neck. ML17324B2461987-02-0606 February 1987 Dcrdr Evaluations,Phases III-V,DC Cook Units 1 & 2, Informal Technical Communication ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML17324B2191986-11-0606 November 1986 Review of App R Procedures for Post-Fire Remote Emergency Shutdown Outside Control Room,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20207A7041986-06-30030 June 1986 Conformance to Reg Guide 1.97,DC Cook Nuclear Plant Units 1 & 2 ML20197J4641986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Catawba Nuclear Stations 1 & 2,DC Cook Nuclear Power Plants 1 & 2,WB McGuire Nuclear Stations 1 & 2,Sequoyah Nuclear Plants 1 & 2 ML17324A9561986-03-31031 March 1986 Technical Evaluation Rept of 1984 Meteorological Data from Donald C Cook Nuclear Power Plant. ML17321A9321985-10-17017 October 1985 Review of Licensee...Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for DC Cook..., Technical Evaluation Rept ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20206F3131985-02-0404 February 1985 Revised Containment Hydrogen Analysis Review of DC Cook, Program Ltr Rept.Related Documentation Encl ML17320A4811983-09-30030 September 1983 DC Cook,Units 1 & 2 Inservice Insp Plan, Technical Evaluation Rept ML20077L8511983-09-0101 September 1983 Control of Heavy Loads (C-10) Indiana & Michigan Electric Co,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20077K9771983-07-27027 July 1983 Revised Masonry Wall Design (B-59),DC Cook Nuclear Plant, Units 1 & 2, Technical Evaluation Rept ML17320A5491983-02-24024 February 1983 Draft Control of Heavy Loads (C-10),Donald C Cook Nuclear Power Plant Units 1 & 2, Technical Evaluation Rept ML20076C4091983-01-27027 January 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Cook Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20027D1821982-10-28028 October 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts (F-11 & B-60),DC Cook Nuclear Plant Unit 1, Technical Evaluation Rept,Vols 1 & 2 ML20027D1811982-10-28028 October 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Technical Evaluation Rept.Vols I & II ML20069H8611982-10-0808 October 1982 Radiological Effluent Tech Spec Implementation (A-2),DC Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML17319B6161982-09-0303 September 1982 DC Cook Nuclear Plant Units 1 & 2,Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20069D0761982-08-17017 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Final Technical Evaluation Rept ML20062E2251982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations.D.C. Cook Case Study.Docket Nos. 50-315 and 50-316.(Indiana and Michigan Electric Company) ML18005A0091982-04-0808 April 1982 to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17319B3231982-04-0707 April 1982 to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17319B2871982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, Donald C Cook Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20041D7251982-01-31031 January 1982 Tech Specs for Redundant Decay Heat Removal Capability, Donald C Cook Nuclear Plant,Units 1 & 2, Preliminary Technical Evaluation Rept ML17326A9271981-11-20020 November 1981 Control of Heavy Loads. ML20132C5541981-05-31031 May 1981 Technical Evaluation of Response to Position 5 of Item II.E.4.2 of NUREG-0737,Containment Isolation Setpoint for DC Cook Nuclear Power Plant Units 1 & 2 ML19347E9081981-04-30030 April 1981 Adequacy of Station Electric Distribution Sys Voltages,Dc Cook Units 1 & 2, Technical Evaluation Rept ML17319A9411981-04-27027 April 1981 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication, Technical Evaluation Rept ML19240C0001981-03-31031 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Technical Evaluation Rept ML20003C1061981-01-31031 January 1981 Technical Evaluation Rept,Adequacy of Station Electrical Distribution Sys Voltages,Dc Cook Nuclear Station Units 2 & 3, Preliminary Rept ML17331A6131980-11-30030 November 1980 Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Dc Cook Units 1 & 2, Revised Technical Evaluation Rept ML17326A7511980-09-30030 September 1980 Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Donald C. Cook Units 1 & 2, Technical Evaluation Rept 1998-03-31 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML17319B323&oldid=1970786"