Text

- 1 -UNITED STATES NUCLEAR REGULATORY COMMISSIONBOILING WATER REACTOR GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002--FORM APlease PrintName:________________________________________________________________Facility:________________________________________________________________

Docket No.:________________________________________________________________

Start Time:_______________________ Stop Time: ______________________________INSTRUCTIONS TO APPLICANTAnswer all the test items using the answer sheet pr ovided. Each item has equal point value. A score ofat least 80% is required to pass this portion of the written licensing examination. All examination papers will be collected 4.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> after the examination starts. This examination applies to a typical boilingwater reactor (BWR) power plant.SECTIONQUESTIONS% OF TOTALSCORECOMPONENTS1 - 44 REACTOR THEORY 45 - 72THERMODYNAMICS73 - 100TOTALS 100All work done on this examination is my own. I have neither given nor received aid.

))))))))))))))))))))))))))))))))))Applicant's Signature RULES AND GUIDELINES FOR THEGENERIC FUNDAMENTALS EXAMINATIONDuring the administration of this examination the following rules apply:

NOTE:The generic term "control rod" refers to the length of neutron absorber material that canbe positioned by the operator to change core reactivity.1.Print your name in the blank provided on the cover sheet of the examination.

2.Fill in the name of your facility.

3.Fill in your individual docket number.

4.Fill in your start and stop times at the appropriate time.

5.Two aids are provided for your use during the examination: (1)An equations and conversions sheet contained within the examination copy, and (2)Steam tables provided by your proctor. 6.Place your answers on the answer sheet provided. Credit will only be give n for answers properlymarked on this sheet. Follow the instructions for filling out the answer sheet. 7.Scrap paper will be provided for calculations.

8.Cheating on the examination will result in the auto matic forfeiture of this examination. Cheatingcould also result in severe penalties. 9.Restroom trips are limited. Only ONE examinee may leave the room at a time. In order to avoidthe appearance or possibility of cheating, avoid all contact with anyone outside of theexamination room. 10.After you have completed the examination, sign the statement on the cover sheet indicating thatthe work is your own and you have neither given nor received any assistance in completing theexamination. 11.Turn in your examination materials, answer sheet on top, followed by the examination booklet,then examination aids - steam table booklets, handouts, and scrap paper used during theexamination. 12.After turning in your examination materials, leave the examination area, as defined by theproctor. If after leaving you are found in the examination area while the examination is inprogress, your examination may be forfeited. GENERIC FUNDAMENTALS EXAMINATIONEQUATIONS AND CONVERSIONS HANDOUT SHEET EQUATIONS-----------------------------------------------------------------------------------------------------------------------------Qmc pTQmhQUAT Qm 3NatCirc Tm 2NatCirc Keff = 1/(1 - ) = (Keff - 1)/Keff SUR = 26.06/ eff 1eff * = 1 x 10-4 sec eff = 0.1 sec-1 (for small positive ) DRW 2 tip/ 2 avg P = P o 10SUR(t) P = P o e(t/) A = A o e-t CRS/D = S/(1 - Keff) CR 1 (1 - Keff1) = CR 2 (1 - Keff2) 1/M = CR 1/CR X A = r 2 F = PA m = AvWPumpmP E = IR Eff. = Net Work Out/Energy In

(P 2 - P 1) + (v 2 2 - v 1 2) + g(z 2 - z 1) = 0 ________ _______

2g c g c g c = 32.2 lbm-ft/lbf-sec 2CONVERSIONS


1 Mw= 3.41 x 10 6 Btu/hr 1 Curie= 3.7 x 10 10 dps 1 hp= 2.54 x 10 3 Btu/hr 1 kg= 2.21 lbm 1 Btu= 778 ft-lbf 1 galwater= 8.35 lbm C= (5/9)(F - 32) 1 ft 3water= 7.48 gal F = (9/5)(C) + 32 USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 4 -QUESTION:1Refer to the drawing of two identical pressure vessels with identical relief protection (see figure below).

Both vessels have been pressurized to 50 psig and then isolated. Vessel A is completely filled with water at 150F. Vessel B is in a satura ted condition with one-half steam (100% quality) and one-halfwater (0% quality) by volume.If both relief valves fully open simultaneously, the faster pressure reduction will occur in vessel________; and if both relief valves close at 40 psig, the greater mass loss will have occurred in vessel

________.A.A; A B.A; B C.B; A D.B; B USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 5 -QUESTION:2Refer to the drawing of a spring-loaded air-operated valve (see figure below) in which the solenoid isshown energized.

Which one of the following will be the final valve position following a loss of electrical power to the solenoid?A.Midposition B.Closed C.As is D.Open USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 6 -QUESTION:3Refer to the drawing of a water supply pump with two suction sources (see figure below). All motor-operated valves (MOVs) are currently closed.

Which one of the following MOV interlocks will permit the pump to take a suction on either thebuilding sump or the water storage tank, while preventing the two sources from being cross-connected?A.Neither MOV-1 nor MOV-2 can be opened unless MOV-3 is fully closed.B.None of the MOVs can be opened unless at least one MOV remains fully closed.C.None of the MOVs can be opened unless at least two MOVs remain fully closed.D.Neither MOV-1 nor MOV-2 can be opened unless the other source MOV is fully closed.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 7 -QUESTION:4Emergency core cooling systems (ECCSs) typically have check valves in the discharge lines from theECCS pumps to the reactor vessel. How does the check valve operate?

A.The valve is opened by flow and pressure from the discharge of the associated ECCS pump.

B.Instrument air is supplied to the valve operator when the associated ECCS pump is stopped to closethe valve and ensure no leakage across the seat.C.The valve will begin to modulate when the associ ated ECCS pump is started to ensure adequate recirculation flow.D.Instrument air is supplied to the valve upon ECCS pump start to ensure that the valve opens.QUESTION:5In a comparison between a typical gate valve and a typical globe valve in the sa me application with bothvalves fully open, the gate valve has a

____________ pressure drop and is normally used in

____________ flow applications.

A.larger; throttling B.larger; on/off C.smaller; throttling D.smaller; on/off USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 8 -QUESTION:6Density input is normally used in steam flow instruments to convert ______________ into

______________.A.mass flow rate; volumetric flow rate B.volumetric flow rate; mass flow rate C.mass flow rate; differential pressure D.differential pressure

volumetric flow rate USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 9 -QUESTION
7Refer to the drawing of a horizontal pipe elbow (top view) in an operating water system (see figure below).

Three separate bellows-type differential pressure flow detectors are connected to taps A, B, C, and D asfollows: DETECTOR TAPS AD A and D BDB and D CD C and DAssuming zero head loss in this section of pipe, how will the detectors be affected if tap B experiences asignificant leak? (Assume water system pressure does not change.)A.All detectors will fail low.B.All detectors will fail high.

C.Only one detector will fail, and it will fail low.

D.Only one detector will fail, and it will fail high.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 10 -QUESTION:8Refer to the drawing of a reactor vessel (RV) differential pressure level detector (see figure below) thatwas recently calibrated at normal operating conditions.With the reactor shut down, RV pressure was inadvertently decreased from 1,000 psig to 500 psig in 5 minutes due to operator error. RV pressure was stabilized at 500 psig, but during the pressure decrease a small amount of water in the condensing chamber flashed to steam. Assume the reference leg waterremains subcooled, except for the small amount of water that flashes to steam in the condensingchamber.As a result of the small loss of condensing cham ber water, RV level w ill indicate ________ than actuallevel; and as the condensing chambe r refills, indicated level will __________.A.higher; decrease and stabilize above the actual level B.higher; decrease and stabilize below the actual level C.lower; increase and stabilize above the actual level D.lower; increase and stabilize below the actual level USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 11 -QUESTION:9A properly calibrated 0 to 100 psia diaphragm pressure detector is connected to a pressurized system; the low pressure side of the detector is vented to the atmosphere. The detector is currently producing asystem pressure indication of 75 psia.

If the detector diaphragm ruptures, indicated pressure will be approximately:

A.0 psia.

B.15 psia.

C.60 psia.

D.90 psia.QUESTION:10Which one of the following para meters requires square root compensation when measured by adifferential pressure detector?

A.Reactor vessel level

B.Condenser vacuum

C.Reactor vessel pressure

D.Recirculation pump flow rate

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A-12 -QUESTION:11Refer to the drawing of a simple thermocouple circuit (see figure below).Thermocouple temperature indication is currently 150F. Reference junction temperature is currently 90F. Indicator range is from 0F to 2000F.If one of the thermocouple extension wires loosens and becomes dislodged from its terminal in thereference junction panel, which one of the following temperature indications will occur?

A.Minimum instrument reading (0F)

B.60FC.90FD.Maximum instrument reading (2000F)

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 13 -QUESTION:12Fission chamber detectors are used to monitor reactor power/neutron level in a shutdown reactor as wellas a reactor operating at full power (and all power levels in between). At what power levels and why isit necessary to compensate the output of the detectors for gamma interactions with the fission chambers?A.At all power levels, because gamma interactions produce larger detector pulses than neutroninteractions.B.At all power levels, because gamma interactions produce smalle r detector pulses than neutroninteractions.C.Only when shutdown or at low power levels, because gamma flux is not proportional to reactor power at low power levels.D.Only when operating at high power levels, because gamma flux is not proportional to reactor powerat high power levels.QUESTION:13A gas-filled radiation detector operating in the proportional region is exposed to a constant gammaradiation field. If the applied voltage is increased but maintained within the proportional region, the rateof ion collection will:

A.increase because more secondary ionizations are occurring in the detector.B.increase because fewer primary ions are recombining in the detector prior to reaching the electrodes.

C.stay approximately the same because the ion chamber is operating at saturated conditions.D.stay approximately the same because all of the primary ions were already being collected at the lowervoltage.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 14 -QUESTION:14A Geiger-Mueller radiation detector is located in a radiation field consisting of beta, gamma, and fastneutron radiation. Assuming each ty pe of radiation enters the detector gas chamber and ionizes thedetector gas, which one of the following describes the resulting detector pulse sizes?

A.Beta radiation will produce a larger pulse size than either gamma or fast neutron radiation.B.Gamma radiation will produce a larger pulse size than either be ta or fast ne utron radiation.C.Fast neutron radiation will produce a larger pulse size than either beta or gamma radiation.D.Beta, gamma, and fast neutron radiation will produce pulse sizes that are equal in magnitude.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 15 -QUESTION:15Refer to the drawing of a water storage tank with a level control system (see figure below).The tank water level is being automatically controlled by a proportional-only controller with a setpoint of 50%. Tank water level is currently stable at 50% with 500 gpm entering the tank and the drain valve 50% open.

The tank suddenly develops a constant 200 gpm leak, while the input fl ow rate remains constant at 500gpm. After the tank water level stabilizes, level will be ____________, and the drain valve position will be ____________.

A.50%; more than 50% open B.50%; less than 50% open C.below 50%; more than 50% open D.below 50%; less than 50% open USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 16 -QUESTION:16Refer to the drawing of a pneumatic control system (see figure below).

The purpose of the valve positioner is to convert:

A.a small control air pressure into a proportionally larger air pr essure to adjust valve position.B.a large control air pressure into a proportionally smaller air pr essure to adjust valve position.C.pneumatic force into mechanical force to adjust valve position.

D.mechanical force into pneumatic force to adjust valve position.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 17 -QUESTION:17If the turbine shaft speed signal received by a typical turbine governor control system fails high duringturbine startup, the turbine governor will cause turbine speed to:

A.increase, until an upper limit is reached or the turbine trips on overspeed.

B.decrease, until the mismatch with the turbine speed demand signal is nulled.

C.increase, until the mismatch with the turbine speed demand signal is nulled.

D.decrease, until a lower limit is reached or turbine steam flow is isolated.QUESTION:18 A centrifugal pump with no recircula tion flow path must be stopped when discharge pressure reaches the pump shutoff head to prevent:

A.overheating of the pump.

B.overheating of the motor.

C.bursting of the pump casing.

D.water hammer in downstream lines.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 18 -QUESTION:19A multispeed centrifugal pump is operating with a flow rate of 3,000 gpm. Which one of the followingapproximates the new flow ra te if the speed is decreased from 3,600 rpm to 2,400 rpm?A.1,000 gpmB.1,500 gpm C.2,000 gpm D.2,500 gpmQUESTION:20A motor-driven centrifugal pump is operating in an open system. If the pump discharge valve is fully opened from a throttled position, available ne t positive suction head (NPSH) will ______________ and required NPSH will ______________.A.increase; increase B.increase; remain the same C.decrease; increase D.decrease; remain the same USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 19 -QUESTION:21A centrifugal firewater pump is operating normally to pressurize a fire main.

The pump takes suction ona water reservoir. The reservoir water level and the pump are both at sea level.

Given:

  • The pump has a shutoff head of 100 feet.*The required net positive suction head (NPSH) for the pump is 15 feet.
  • The reservoir water temperature is 60F.What is the highest elevation (referenced to sea level) of a fire hose nozzle at which the firewater pumpwill be able to provide flow? (Disregard head loss in the fire main and fire hose.)A.115 feet B.100 feet C.85 feet D.67 feet USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 20 -QUESTION:22A single-speed centrifugal pump is needed to supply river water to a storage facility. The pump must becapable of providing a very high flow rate at a low discharge pressure. Which one of the following typesof centrifugal pumps is best suited for this application?A.Single-stage, axial flow B.Single-stage, radial flow C.Multiple-stage, axial flow D.Multiple-stage, radial flowQUESTION:23A centrifugal pump is operating at rated conditions in an open system with all valves fully open. If thepump suction valve is throttled to 50% closed, pump suction pressure will __________ and pump flow rate will ____________.A.increase; decrease B.decrease; remain the same C.increase; remain the same D.decrease; decrease USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 21 -QUESTION:24A section of reactor coolant piping is being hydrostatically tested to 1,400 psig using a positivedisplacement pump. The operating characteristics of the positive displacement pump are shown below,identifying ideal, expected, and actual pump performance during the test. Which one of the following could have caused the observed difference between the expected and the actual pump performance?A.Available NPSH decreased to slightly above the required NPSH for the pump.B.Available NPSH decreased to slightly below the required NPSH for the pump.C.A relief valve on the pump discharge piping failed to open at its set point of 1,400 psig.D.A relief valve on the pump discharge piping opened prior to its set point of 1,400 psig.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 22 -QUESTION:25Prior to starting a positive displacement pump, the discharge valve should be open to:A.prevent rupturing the pump casing.

B.limit the pump motor starting time.

C.ensure the pump casing fills by backflow.

D.reduce pressure fluctuations in the discharge piping.QUESTION:26 A cooling water pump is being driven by an ac induction motor. Which one of the following describeshow and why pump motor current will change if the pump shaft seizes?

A.Decreases due to decreased pump flow B.Decreases due to increased counter electromotive forceC.Increases due to decreased pump flow D.Increases due to decreased counter electromotive force USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 23 -QUESTION:27Which one of the following will result from prolonged operation of an ac motor with excessively highstator temperatures?A.Decreased electrical current demand due to reduced counter electromotive forceB.Increased electrical current demand due to reduced counter electromotive forceC.Decreased electrical ground resistance due to breakdown of winding insulationD.Increased electrical ground resistance due to breakdown of winding insulationQUESTION:28 A main generator is operating on the power grid with the following indications:100 MWe 0 MVAR 2,900 amps

20,000 voltsIf MVAR does not change while real load is increased to 200 MWe, the current supplied by thegenerator will increase to approximately:A.11,600 amps B.8,200 amps C.5,800 amps D.4,100 amps USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 24 -QUESTION:29 Two identical 4160 Vac induction motors are connected to identical centrifugal pumps in identical butseparate cooling water syst ems. Each motor is rated at 200 hp. The discharge valve for pump A is fullyshut and the discharge valve for pump B is fully open.

When the motors are started under these conditions, the shorter time period required to reach a stablerunning current will be experienced by motor ___________, and the higher stable running current willbe experienced by motor ________.

A.A; A B.A; B C.B; A D.B; BQUESTION:30A large centrifugal pump is driven by a 200 horsepow er 4.16 kV ac motor. The motor breaker controlcircuit contains the following protection devices: instantaneous overcurrent relay, motor thermaloverload relay, control power fuses, and an anti-pumping device.The pump had been manually star ted and stopped several times during a 5-minute period when themotor breaker unexpectedly tripped. In this situation, which one of the following is the most likelycause of the breaker trip?

A.Instantaneous overcurrent B.Motor thermal overload C.Blown control power fuse D.Anti-pumping device actuation USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 25 -QUESTION:31Refer to the drawing of a lube oil heat exchanger (see figure below).

Increasing the oil flow rate through the heat exchanger will cause the oil outlet temperature to_________ and the cooling water outlet temperature to __________.A.increase; increaseB.increase; decrease C.decrease; increase D.decrease; decrease USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 26 -QUESTION:32 Steam has been admitted to a condenser for 25 minutes with no cooling water during a condenserstartup. Initiating full cooling wate r flow rate at this time will:A.induce large thermal stre sses on the condenser shell.

B.reduce the stress on the condenser tubes by gradually cooling the tubes.C.reduce the stress on the condenser shell because the shell has been pre-warmed.D.induce large thermal stresses on the junctions between the condenser t ubes and the tubesheet.QUESTION:33 The discharge valve for a large operating centrifugal pump should be positioned slowly to minimize the:

A.change in available net positive suction head.

B.potential for causing water hammer.

C.differential pressure stress exer ted on the valve disk and stem.D.mechanical wear on the valve seat and stem packing.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 27 -QUESTION:34Refer to the drawing of a water cleanup system (see figure below).Valves A, B, and C are fully open. Valve D is 20%

open. All temperatures are as shown. Valve D isthen quickly opened to 100%.

The temperature at point:

A.3 will increase.

B.4 will decrease.

C.5 will decrease.

D.7 will increase.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 28 -QUESTION:35Refer to the drawing of an operating cooling water system (see figure below).Which one of the following effects would occur as a result of the failed tube in the heat exchanger?A.Level in the surge tank increases.

B.Flow in the low pressure system reverses.

C.Pressure in the low pressure system decreases.

D.Low pressure fluid heat exchanger outlet temperature decreases.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 29 -QUESTION:36A plant is operating at 100% power when air inleakage results in the buildup of noncondensible gases in the main condenser. Assume no operator or automatic ac tions occur that affect reactor power or turbineload.

Which one of the following will occur as a result of this air inleakage?

A.Decreased condensate temperature B.Decreased pressure in the main condenser C.Decreased suction pressure at the condensate pumps D.Decreased condenser cooling water outlet temperatureQUESTION:37 A demineralizer is being used in a water purification system.

How will accumulation of suspendedsolids in the demineralizer affect performance of the demineralizer?

A.The rate of resin depletion will increase.

B.The flow rate of water through the demineralizer will increase.

C.The differential pressure across the demineralizer will decrease.

D.The rate of unwanted ion removal from the system will decrease.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 30 -QUESTION:38What percentage of impurities is being removed from the water passing through an ion exchanger if theion exchanger has a decontamination factor of 25?A.99%

B.96%

C.88%

D.75%QUESTION:39Which one of the following conditions will lead to channeling in a demineralizer?

A.Suspended solids and insoluble particles forming a mat on the surface of the resin bed B.A sudden 10F decrease in the temperature of the influent to the demineralizerC.Exhaustion of the resin bed due to high conductivity of the demineralizer influentD.Operation of the demineralizer with influent flow rate at 10% below design flow rate USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 31 -QUESTION:40While remotely investigating the condition of a normally-open motor control center (MCC) feederbreaker, an operator observes the following indications:Green breaker position indicating light is out.

Red breaker position indicating light is lit.

MCC voltmeter indicates normal voltage.

MCC ammeter indicates zero amperes.Based on these indications, the operator should re port that the circuit breaker is __________ and racked

__________.A.open; in B.closed; in C.open; out D.closed; outQUESTION:41A typical 120 Vac manual circuit breaker ha s tripped due to overload. To close this circuit breaker the handle must be moved from the:

A.OFF position directly to the ON position; trip latch reset is not required.B.midposition directly to the ON pos ition; trip latch reset is not required.C.OFF position to the midposition to reset th e trip latch, and then to the ON position.D.midposition to the OFF position to reset th e trip latch, and then to the ON position.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 32 -QUESTION:42Refer to the drawing of a valve motor control circuit (see figure below) for a valve that is currently fully closed and has a 10-second stroke time. (Note: Limit switch (LS) contacts are shown open regardless ofvalve position, but relay contacts follow the standard convention for control circuit drawings.)

An operator takes the cont rol switch to "Open" momentarily and the valve begins to open. Five seconds later, the operator places and holds the switch in the "Close" position. Which one of the following

describes the valve response with the switch held in the "Close" position?A.The valve will stop opening and remain partially open.B.The valve will stop opening and then go fully closed.

C.The valve will open fully and remain fully open.

D.The valve will open fully and then go fully closed.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 33 -QUESTION:43Two identical 1000 MW electrical generators are operating in parallel supplying the same isolatedelectrical bus. The genera tor output breakers provide identical protection for the generators. GeneratorA and B output indications are as follows:Generator AGenerator B 22 KV 22 KV 60.2 Hertz 60.2 Hertz 800 MW 800 MW50 MVAR (out)25 MVAR (in)A malfunction causes the voltage regulator for generator B to slowly and continuously increase theterminal voltage for generator B. If no operator action is taken, generator B output current will:

A.increase continuously until the output breaker for generator A trips on overcurrent.B.increase continuously until the output breaker for generator B trips on overcurrent.C.initially decrease, and then increase until the output breaker for generator A trips on overcurrent.

D.initially decrease, and then increase until the output breaker for generator B trips on overcurrent.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 34 -QUESTION:44Refer to the simplified drawing of an electrical distribution system showing 7.2 KV switchgear, step-down transformers, and 480V motor control centers (MCCs) (see figure below).The high voltage side of each step-down transf ormer has a remote-opera ted disconnect to allowtransformer maintenance while keeping the other transformers in service. The control circuit for each disconnect is position-interlocked with the associated MCC feeder breaker.Which one of the following describes the purpose served by the interlock?A.Prevent damage to the disconnect.

B.Prevent damage to the transformer.

C.Prevent damage to the feeder breaker.

D.Prevent damage to the 480V MCC.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 35 -QUESTION:45During a brief time interval in a typical commercial nuclear reactor operating at the beginning of a fuelcycle, 10 5 delayed neutrons were emitted. Approximately how many pr ompt neutrons were emitted in the reactor during this same time interval?A.1.5 x 10 5B.6.5 x 10 6C.1.5 x 10 7D.6.5 x 10 8QUESTION:46

The best neutron moderator is

__________ and is composed of __________ atoms.A.dense; large B.not dense; large C.dense; small D.not dense; small USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 36 -QUESTION:47Which one of the following is a benefit of installing excess reactivity (Kexcess) in a reactor core?A.Ensures that sufficient control rod negative reactivity is available to shut down the reactor.

B.Ensures that the reactor can be made critical during a peak xenon condition after a reactor scram.C.Ensures that positive reactivity additions re sult in controllable reactor power responses.D.Ensures that the U-235 fuel enrichment is the same at the beginning and the end of a fuel cycle..QUESTION:48 When determining shutdown margin for an operating reactor, how many control rod assemblies areassumed to remain fully withdrawn?A.A single control rod of the highest reactivity worthB.A symmetrical pair of control rods of the highest reactivity worthC.A single control rod of average reactivity worth D.A symmetrical pair of control rods of average reactivity worth USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 37 -QUESTION:49A reactor plant that has been operating at rated power for two months experiences a reactor scram. One month after the reactor scram, with all control rods still fully inserte d, a stable count rate of 20 cps is indicated on the source rang e nuclear instruments. The majority of the source range detector output is being caused by the interaction of ____________with the detector.

A.intrinsic source neutrons B.fission gammas from previous power operation C.fission neutrons from subcritical multiplication D.delayed fission neutrons from previous power operationQUESTION:50A refueling outage has just been completed in which one-third of the core was replaced with new fuelassemblies. A reactor startup has been performed to mark the beginning of the sixth fuel cycle and power is being increased to 100%.Which one of the following pairs of reactor fuels will be providing the greatest contribution to core heat production when the reactor reaches 100% power?

A.U-238 and Pu-239 B.U-238 and Pu-241 C.U-235 and U-238 D.U-235 and Pu-239 USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 38 -QUESTION:51Reactors A and B are identical except that the reactor cores are at di fferent times in core life. Thereactor A effective delayed neutron fraction is 0.007, and the reactor B effective delayed neutron fractionis 0.005. Both reactors are currently subcritical and stable with neutron flux level in the source range.

Given:Reactor A Keff = 0.999Reactor B Keff = 0.998If positive 0.003 K/K is suddenly added to each reactor, how will the resulting stable periods compare? (Consider only the reactor response while power is below the point of adding heat.)A.Reactor A stable period will be shorter because it will have the higher positive reactivity in the core.

B.Reactor B stable period will be shorter because it has the smaller effective delayed neutron fraction.C.Reactors A and B will have the same stable period because both reactors will remain subcritical.D.Reactors A and B will have the same stable period because both reactors received the same amountof positive reactivity.QUESTION:52 How does control rod withdrawal affect the moderator temperature coefficient in an undermoderatedreactor core?A.The initially negative MTC becomes more negative.

B.The initially negative MTC becomes less negative.

C.The initially positive MTC becomes more positive.

D.The initially positive MTC becomes less positive.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 39 -QUESTION:53During a normal power increase from 20% to 100% near the beginning of a fuel cycle, the smallestnegative reactivity addition will be caused by the change in:

A.void content.

B.fuel temperature.

C.xenon concentration.

D.moderator temperature.QUESTION:54A group of control rods, initially at position 06 are withdrawn three notches. After withdrawal, thisgroup of rods is classified as ___________ rods; and the blade tips for this group of rods are positioned 36 inches from the __________ of the reactor core.

A.shallow; top B.shallow; bottom C.deep; top D.deep; bottom USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 40 -QUESTION:55Rod density is a measure of the total number of control rod notches _______ the core divided by the total number of control rod notches _______ the core.

A.inserted into; available in B.inserted into; withdrawn from C.withdrawn from; available in D.withdrawn from; inserted intoQUESTION:56Which one of the following expresses the relationship between differential rod worth (DRW) andintegral rod worth (IRW)?

A.DRW is the area under the IRW curve at a given rod position.

B.DRW is the slope of the IRW curve at a given rod position.

C.DRW is the IRW at a given rod position.

D.DRW is the square root of the IRW at a given rod position.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 41 -QUESTION:57The main reason for designing and operating a reactor with a flattened neutron flux distribution is to:A.provide even burnup of control rods.

B.reduce neutron leakage from the core.

C.allow a higher average power density.

D.provide more accurate nuclear power indication.QUESTION:58Which one of the following exhibits the greatest mic roscopic cross section for absorption of a thermalneutron in an operating reactor?

A.Uranium-235 B.Boron-10 C.Samarium-149 D.Xenon-135 USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 42 -QUESTION:59 A fission product poison can be differentiated from all other fission products in that a fission product poison will:

A.be produced in direct proportion to the fission rate in the core.

B.remain radioactive for thousands of years after the final reactor criticality.C.depress the power production in some core locations and cause peaking in others.

D.migrate out of the fuel pellets and into the reactor coolant via pinhol e defects in the clad.QUESTION:60 A reactor has been operating at 25% power for five days when a scram occurs. Core xenon-135 negativereactivity will peak in approximately:

A.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

B.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

C.10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />.

D.20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 43 -QUESTION:61Which one of the following explains why core Xe-135 oscillations are a concern in a reactor?A.They can adversely affect core power distribu tion and can require operati on below full rated power.B.They can adversely affect core power distribution and can prevent a reactor startup following areactor scram.C.They can cause excessively short reactor periods during power operation and can require operation below full rated power.D.They can cause excessively short reactor periods during power operation and can prevent a reactorstartup following a reactor scram.QUESTION:62 Which one of the following describes a reason for the direction of change in core xenon-135 reactivityimmediately after a reactor shutdown from long-term power operation?A.The production rate of Xe-135 from I-135 decay significantly decreases.

B.The production rate of Xe-135 from fission significantly decreases.C.The removal rate of Xe-135 by decay to I-135 significantly decreases.D.The removal rate of Xe-135 by neutron absorption significantly decreases.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 44 -QUESTION:63A plant had been operating at 100% power for two months when a reactor scram occurred. Soon afterward, a reactor startup was performed. Twelve hours after the scram, the startup has been pausedwith reactor power at 2%.

To maintain reactor power stable at 2% over the next hour, the operator must add ___________reactivity because core xenon-135 concentration will be _____________.A.positive; increasing.B.negative; increasing.

C.positive; decreasing.

D.negative; decreasing.QUESTION:64Just prior to refueling, control rods are nearly fully withdrawn at 100% power. After refueling, the control rods are inserted much fa rther into the core at 100% power.Which one of the following is the primary reason for the change in full power control rod position?

A.Reactivity from power defect at beginning of core life (BOL) is much greater than at end of core life(EOL).B.Reactivity from void coefficient at EOL is much greater than at BOL.

C.The excess reactivity in the core at BOL is much greater than at EOL.

D.The integral control rod worth at EOL is much greater than at BOL.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 45 -QUESTION:65During a reactor startup, source range monitors (SRMs) indi cate a stable count rate of 100 cps, and Keff is 0.95. After a number of rods have been withdr awn, SRM indication stabilizes at 270 cps. Which oneof the following is the new Keff? (Assume reactor period is infinity before and after the rod withdrawal.)A.0.963 B.0.972 C.0.981 D.0.990QUESTION:66A reactor startup is in progress for a reactor that is in the middle of a fuel cycle. The reactor is at normaloperating temperature and pr essure. The main steam isolation valves are open and the main turbinebypass (also called steam dump) valves are closed. The reactor is near criticality.Reactor period is stable at infinity when, suddenly, a turbine bypass valve fails open a nd remains stuckopen, dumping steam to the main condenser. The operator immediately ensures no control motion isoccurring and takes no further action. Assume that the reactor vessel water level remains stable, thereactor does not scram, and no other protective actions occur.

As a result of the valve failure, reactor period will initially become __________;

and reactor power willstabilize __________ the point of adding heat.A.positive; at B.positive; above C.negative, but soon turn; at D.negative, but soon turn; above USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 46 -QUESTION:67A reactor has just achieved criticality during a xenon-free reactor startup. Instead of stabilizing power at 10 3 cps per the startup procedure, the operator inadvertently allows reactor power to increase to 10 4 cpsas indicated on the source range monitors.Assuming reactor vessel cool ant temperature and pressure do not change, the critical rod height at 10 4cps will be ______________ the critical rod height at 10 3 cps. (Neglect any effects of changes in fission product poisons.)

A.different but unpredictable compared to B.less than C.greater than D.equal toQUESTION:68A reactor startup is in progress and criticality has just been achieved. After recording critical rod height, the operator withdraws control rods for 20 seconds to establish a positive 30-second reactor period. One minute later (prior to the point of adding heat) the operator inserts th e same control rods for 25 seconds.During the insertion, the reactor period will become:

A.infinity during the entire pe riod of control rod insertion.B.negative after the control rods pass through the critical rod height.C.negative just as the control rods pass through the critical rod height.D.negative before the control rods pass through the critical rod height.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 47 -QUESTION:69After taking critical data during a reactor startup, the operator esta blishes a stable positive 48-secondreactor period to increase power to the point of adding heat(POAH). Which one of the following is theapproximate amount of reactivity needed to stabilize power at the POAH? (Assume eff = 0.00579.)A.-0.10% K/KB.-0.12% K/KC.-0.01% K/KD.-0.012% K/KQUESTION:70With a reactor on a constant period of 180 seconds, which one of the following power changes requiresthe longest amount of time to occur?A. 3% power to 5% power B. 5% power to 15% power C.15% power to 30% power D.30% power to 60% power USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 48 -QUESTION:71A reactor has been operating at full power for several months. Following a normal reactor shutdown, steam production will continue for a period of time, with the rate (Btu/hr) of steam production dependent upon the:A.rate of reactor power decrease from full power to the point of adding heat.

B.pressure being maintained in the reactor pressure vessel (RPV).

C.previous power history of the plant and the time elapsed since shutdown.

D.recirculation flow rate and the water level being maintained in the RPV.QUESTION:72Which one of the following is the purpose of a rod sequence exchange?

A.Ensures proper rod coupling B.Prevents rod shadowing C.Promotes even fuel burnout D.Minimizes water hole peaking USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 49 -QUESTION:73Refer to the drawing of four identical tank differential pressure level detectors (see figure below).The tanks are identical and are presently at 2 psig overpressure, the same cons tant water level, and a temperature of 60F. They are surrounded by atmospheric pr essure. All level detectors have beencalibrated and are producing the same level indication. A leak in th e top of each tank causes a complete loss of overpressure in both tanks.

Which level detector(s) will produ ce the lowest level indication?A.No. 1 only B.No. 2 only C.No. 1 and 4 D.No. 2 and 3 USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 50 -QUESTION:74A steam-water mixture is initially saturated with a quality of 50%, when a small amount of heat isadded. Assuming pressure remains constant and the mixture remains saturated, mixture steam qualitywill ___________ and mixture temperature will ___________.A.increase; increase

B.increase; remain the sameC.remain the same; increase D.remain the same; remain the sameQUESTION:75Saturated steam (100% quality) at 1000 psia is being supplied to the inlet of a partially-open steamthrottle valve on a main turbine. Pressure in the steam chest downstream of the throttle valve is 150psia. Assume a typical throttling process with no heat gain or loss to/from the steam.When compared to the conditions at the inlet to the throttle valve, which one of the following describes the conditions in the steam chest for specific enthalpy and entropy? Steam Chest Steam Chest Specific EnthalpySpecific EntropyA.About the sameAbout the sameB.About the sameSignificantly higher C.Significantly lowerAbout the same D.Significantly lowerSignificantly higher USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 51 -QUESTION:76Steam entering an air ejector reaches sonic velocity in the throat of a convergent-divergent nozzle. Uponentering the divergent section of the nozzle, steam velocity will ____________ a nd steam pressure will

____________.

A.decrease; increase B.increase; decrease C.increase; increase D.decrease; decreaseQUESTION:77A power plant is operating at 90% of rated power. Which one of the following describes the effect ofincreasing circulating water flow rate through the main condenser?A.The saturation temperature in the main condenser decreases.B.The enthalpy of the condensate leaving the main condenser increases.C.The temperature of the circulating water leaving the main condenser increases.D.The total rate of heat transfer from the turbine exhaust steam to the circulating water decreases.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 52 -QUESTION:78 Steam turbines X and Y are identical 100% efficient turbines that exhaust to a condenser at 1.0 psia.

Saturated steam at 250 psia enters turbine X. A moisture separator/reheat er supplies turbine Y with superheated steam at 250 psia and 500F.Which one of the following lists the percentage of moisture in the exhaust of turbines X and Y?

Turbine X Turbine YA.24.5%20.5%B.26.3%13.0%C.24.5%13.0%D.26.3%20.5%

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 53 -QUESTION:79Refer to the drawing of four centrifugal pump operating curves (see figure below).A two-speed centrifugal pump is operating at fast speed in a cooling water system and dischargingthrough a heat exchanger. The pump is then switched to slow speed.

Which set of curves illustrates the initial and final operating conditions?A.1.

B.2.

C.3.

D.4.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 54 -QUESTION:80A reactor heatup is in progress. Which one of the following reactor temperat ures will result in a main steam line pressure of approximately 530 psig?A.462FB.468F C.476FD.484FQUESTION:81

A reactor shutdown has been performed because of leakage from the main condenser cooling watersystem into the main condenser through a tube leak.

Given the following initial conditions:

Main condenser pre ssure is 1.0 psia.Main condenser cooling water system pressure is 10 psig.Main condenser cooling water inlet temperature is 60F.Cooling water leak rate into the main condenser is 100 gpm.If the main condenser is brought to atmospheric pressure, with no changes to the main condenser coolingwater system parameters, what will be the approximate rate of cooling water leakage into the main condenser?A.17 gpm B.28 gpm C.42 gpm D.65 gpm USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 55 -QUESTION:82Which one of the following is the order of core heat transfer mechanisms, from the least desirable to the most desirable?A.Film boiling, single-phase convection, nucleate boilingB.Film boiling, nucleate boiling, single-phase convectionC.Single-phase convection, nucleate boiling, film boilingD.Single-phase convection, film boiling, nucleate boilingQUESTION:83 Which one of the following actions will increase plant efficiency?

A.Increasing turbine inlet steam moisture content B.Increasing condensate depression C.Decreasing turbine exhaust pressure D.Decreasing temperature of feed water entering the reactor vessel USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 56 -QUESTION:84The power range nuclear instruments have been adjusted to 100% based on a calculated heat balance. Which one of the following will result in indicated reactor power being lower than actual reactor power?A.The feedwater temperature used in the heat balance calculation was lower than actual feed watertemperature.B.The reactor recirculation pump heat input term was omitted from the heat balance calculation.C.The feed flow rate used in the heat balance calculation was lower than actual feed flow rate.D.The steam pressure used in the heat balance calculation was lower than actual steam pressure.QUESTION:85 A reactor is operating at steady state 90% power. Which one of the following will cause the two-phasecoolant flowing upward in a fuel channel to become closer to the onset of transition boiling? (Assumereactor power does not change unless stated.)A.Reactor pressure increases.B.Recirculation flow increases.

C.Feedwater temperature decreases.

D.Associated bundle power decreases.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 57 -QUESTION:86Core inlet subcooling is defined as the differe nce between the temperature of the fluid __________ andthe saturation temperature of the fluid in the core inlet plenum.

A.in the core inlet plenum B.at the feedwater pump discharge C.in the downcomer area D.in the lower fuel channel area QUESTION:87A reactor is operating at 70% power. Recirculation flow rate is increased by 5%.

Which one of the following statements describes the initial response of the boiling boundary within the core?

A.It physically moves up the fuel rods, because fewer Btus per pound mass of water are now beingtransferred.B.It physically moves up the fuel rods, because more Btus per pound mass of water are now beingtransferred.C.It physically moves down the fuel rods, because more Btus per pound mass of water are now beingtransferred.D.It physically moves down the fuel rods, because fewer Btus per pound mass of water are now beingtransferred.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 58 -QUESTION:88Refer to the drawing of a fuel rod and coolant flow channel at the beginning of core life (see figure below).

At 100% reactor power, the greatest temperature difference in a typical fuel channel radial temperatureprofile will occur across the:

A.fuel centerline to fuel surface.

B.fuel-to-clad gap.

C.zircaloy cladding.

D.flow channel boundary (laminar) layer.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 59 -QUESTION:89Single-phase coolant flow resistance (head loss) in a reactor core is directly proportional to the square ofcoolant __________ and inversely proportional to __________.

A.velocity; fuel assembly length B.temperature; fuel assembly length C.velocity; coolant channel cross-sectional area D.temperature; coolant channel cross-sectional areaQUESTION:90Which one of the following occurs as a result of reactor core orifices?

A.The core differential pressure is minimized at all power levels.

B.The total core coolant flow rate remains the same at all power levels.

C.The total core coolant flow rate is divided equally through all bundles at all power levels.D.The highest bundle coolant flow rates exist in core interior bundles at all power levels.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 60 -QUESTION:91Which one of the following statemen ts describes natural circulation in a shut down reactor? (Assume no isolation condenser.)

A.The moisture separators return the liquid portion of the coolant mixture exiting the core to the downcomer where it cools and increases in density.B.The jet pump diffusers establish a thermal driving head by increasing the velocity of the coolant as itflows downward through the diffuser.C.Coolant flows from the downcomer into a reactor recirculation loop and is returned to the core.D.Emergency coolant injection establishes a thermal driving head by providing cold coolant to the downcomer.QUESTION:92 The linear heat generation rate (LHGR) for a reactor core is acceptable if ______________ is being maintained at ______________.

A.LHGR-limit/LHGR-actual; 0.95 B.LHGR-actual/LHGR-limit; 1.05 C.LHGR-limit/LHGR-actual; 1.10 D.LHGR-actual/LHGR-limit; 1.15 USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 61 -QUESTION:93If the linear heat generation rate (LHGR) limiting condition for operation is exceeded, the most probabletype of fuel failure is cladding:

A.cracking due to high stress.

B.gross failure due to a lack of cooling.

C.embrittlement due to excessive oxidation.

D.distortion due to inadequate cooling of the clad.QUESTION:94 Which one of the following de scribes the basis for the 2,200F maximum fuel clad temperature limit?A.2,200F is approximately 500F below the fuel clad melting temperature.B.The rate of the zircaloy-steam reaction increases significantly above 2,200F.C.If fuel clad temperature reaches 2,200F, the onset of transition boiling is imminent.D.The differential expansion between the fuel pellets and the fuel clad becomes excessive above 2,200F.

USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 62 -QUESTION:95If a reactor is being operated with the minimum critical power ratio (M CPR) at its transient limit, whichone of the following is indicated?

A.None of the fuel rods are experiencing critical heat flux.B.A small fraction of the fuel rods may be experiencing critical heat flux.C.All radioactive fission products are being contained within the reactor fuel.D.All radioactive fission products are being contained within either the reactor fuel or the reactor vessel.QUESTION:96 For what operational condition does the flow biasing correction factor (K f) adjust the minimum critical power ratio?

A.Operation at less than rated steam flow B.Operation at greater than rated steam flow C.Operation at less than rated core flow D.Operation at greater than rated core flow USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 63 -QUESTION:97A step increase in reactor power results in a fuel cladding surface temperature increase from 550F to 580F at steady state conditions. The fuel thermal time consta nt is 6 seconds.Which one of the following is the approximate fuel cladding surface temperature 6 seconds after thepower change?

A.571FB.569F C.565FD.561FQUESTION:98 Select the cause for the reduction in the size of the gap between the fuel pellet and the clad over core life.A.Contraction of the clad due to zirconium hydriding B.Expansion of the fuel pelle ts due to fission product buildupC.Contraction of the clad due to fuel rod internal vacuumD.Expansion of the fuel pellets due to densification USNRC GENERIC FUNDAMENTALS EXAMINATIONOCTOBER 2002 BWR--FORM A- 64 -QUESTION:99Which one of the following will prevent br ittle fracture failure of a reactor vessel?A.Manufacturing the reactor vessel from low carbon steel B.Maintaining reactor vessel pressure below the maximum design limitC.Operating above the reference temperature for nil-ductility transition (RT NDT)D.Maintaining the number of reactor vessel heatup/cooldown cycles within limitsQUESTION:100 A reactor is shut down for refueling following 18 months of operation at an average power level of 85%. During the shutdown, a reactor vessel metal specimen is removed from the reactor vessel for testing. The testing indicates that the nil-ductility transition (NDT) temperature of the specimen has decreasedfrom 44F to 32F since the last refueling.Which one of the following conclusions is warranted?A.The test results are credible and the reactor vessel is more likely to experience brittle fracture nowthan after the last refueling.B.The test results are credible and the reactor vessel is less likely to experience brittle fracture nowthan after the last refueling.C.The test results are questionable because the actual specimen NDT temperature would not decreaseduring the described 18-m onth period of operation.D.The test results are questionable because the actual specimen NDT temperature would decrease bymuch less than indicated by the test results.

      • FINAL ANSWER KEY ***OCTOBER 2002 NRC GENERIC FUNDAMENTALS EXAMINATIONBOILING WATER REACTOR - ANSWER KEYFORMANSFORMANSFORMANSFORMANSABABABAB129B2654D5179A76 4B230B2755C5280B77 5A331D2856C5381D78 6A432A2957B5482C79 7B533D3058B5583A80 8C634B3159A5684B81 9D735D3260D5785C8210A836A3361B5886D8311C937B3462B5987C8412C1038D3563D6088B8513A11393664 D6189A8614A1240C3765D6290D8715A1341A3866B6391D8816A1442D3967A6492C8917C1543D4068B6593C9018D1644A4169D6694D9119A1745D4270D6795D9220C1846A4371D6896D9321A1947C4472A6997A9422B2048C4573C7098B9523B2149B or C4674C7199C9624C2250A4775B72100C9725B2351D4876A731D9826B2452B4977C742B9927C2553A5078D753B10028C C