MONTHYEARML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 LIC-16-0056, Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations.2016-07-0707 July 2016 Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations. ML16089A0712016-03-29029 March 2016 Generic Fundamentals Examination Results for March 9, 2016 IR 05000285/20153012016-01-20020 January 2016 Er 05000285/2015301; 12/07/2015 - 01/13/2016; Fort Calhoun Station; Initial Operator Licensing Examination Report ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16012A3272015-12-14014 December 2015 2015-12 Draft Outline Comments ML16012A3242015-12-14014 December 2015 2015-12 Draft Outlines ML16012A3372015-12-14014 December 2015 2015-12-DRAFT Written Examination Comments ML16012A3392015-12-14014 December 2015 2015-12 Draft Operating Test ML16012A3452015-12-14014 December 2015 2015-12 Draft Operating Test Comments ML16012A3652015-12-14014 December 2015 2015-12 Final Operating Test ML16012A3672015-12-14014 December 2015 2015-12 Post-Examination Comments ML16012A3492015-12-14014 December 2015 2015-12-FINAL Outlines ML16021A1072015-12-14014 December 2015 2015-12 Public Forms ML15334A4862015-11-30030 November 2015 2015-12-Exam Approval Ltr_ LIC-15-0137, Revised Final Initial Licensed Operator Examination2015-11-24024 November 2015 Revised Final Initial Licensed Operator Examination LIC-15-0127, for Calhoun Station, Unit 1 - Provides the Final Reactor Operator (RO) and Senior Reactor Operator (SRO) License Applications2015-11-24024 November 2015 for Calhoun Station, Unit 1 - Provides the Final Reactor Operator (RO) and Senior Reactor Operator (SRO) License Applications ML14237A2332014-07-31031 July 2014 ANO2-2014-07 Draft Operating Test Comments ML14237A2292014-07-31031 July 2014 ANO2-2014-07 Draft Operating Test ML14237A2072014-07-31031 July 2014 ANO2-2014-07 Draft Outlines ML14181A3842014-06-30030 June 2014 Generic Fundamentals Examination Results June 2014 LIC-14-0076, 2014-05 Post Exam Analysis2014-06-0606 June 2014 2014-05 Post Exam Analysis ML14184B2982014-05-23023 May 2014 2014-04 Public Forms ML14181A0302014-05-22022 May 2014 2014-05 Final Operating Test ML14184B1482014-05-22022 May 2014 2014-05 Draft Operating Test ML14184B1472014-05-22022 May 2014 2014-04 Draft Written Exam ML14184B1492014-05-22022 May 2014 2014-05 Draft Written Exam Comments ML14184B3092014-05-22022 May 2014 2014-05 Draft Outline ML14184B3212014-05-22022 May 2014 2014-05-Draft Outline Comments ML14267A3282014-05-22022 May 2014 2014-05 Final Outlines ML14184B1632014-05-22022 May 2014 2014-05-Draft Operating Test Comments ML14128A1182014-05-0808 May 2014 2014-05-Examination Approval ML14063A6242014-03-0404 March 2014 IR 05000285-14-301, 02/16/2013, Fort Calhoun, Revision to Notification of NRC Initial Operator ML12291A7362012-09-21021 September 2012 09 Post Exam Analysis ML12291A7322012-09-21021 September 2012 2012-09 Final Written Exam ML12325A3882012-09-21021 September 2012 Fc 2012-09 Draft Outlines ML12325A3962012-09-21021 September 2012 FC-2012-09-DRAFT Outline Comments ML12325A3982012-09-21021 September 2012 2012-09 Draft Retake Written Exam ML12325A4082012-09-21021 September 2012 Fc 2012-09 Final Outlines ML12325A4142012-09-21021 September 2012 Fc 2012-09 Post Exam Analysis ML12325A4202012-09-21021 September 2012 09 Public Forms ML12325A4032012-09-21021 September 2012 FC-2012-09 Draft Written Exam Comments Steely ML1226300422012-09-19019 September 2012 NRC Initial Operator Licensing Examination Approval ML12180A4522012-06-28028 June 2012 Notification of NRC Retake Operator Licensing Examination 05000285/2012302 LIC-12-0055, FCS 2012-04 Post Exam Comments and Analysis2012-04-26026 April 2012 FCS 2012-04 Post Exam Comments and Analysis ML12157A2832012-04-20020 April 2012 FCS 2012-04 Draft Operating Test Comments ML12153A2782012-04-20020 April 2012 FC-2012-04 Final Written and Op Test Outlines ML12156A0032012-04-20020 April 2012 FC-2012-04 Final Operating Test ML12156A0052012-04-20020 April 2012 2012-04 Final Written Exam ML12156A3292012-04-20020 April 2012 FC-2012-04 Draft Outlines 2017-01-13
[Table view] Category:Part 55 Examination Related Material
MONTHYEARLIC-16-0056, Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations.2016-07-0707 July 2016 Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations. ML16089A0712016-03-29029 March 2016 Generic Fundamentals Examination Results for March 9, 2016 IR 05000285/20153012016-01-20020 January 2016 Er 05000285/2015301; 12/07/2015 - 01/13/2016; Fort Calhoun Station; Initial Operator Licensing Examination Report ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16012A3392015-12-14014 December 2015 2015-12 Draft Operating Test ML16012A3242015-12-14014 December 2015 2015-12 Draft Outlines ML16012A3272015-12-14014 December 2015 2015-12 Draft Outline Comments ML16012A3372015-12-14014 December 2015 2015-12-DRAFT Written Examination Comments ML16012A3452015-12-14014 December 2015 2015-12 Draft Operating Test Comments ML16012A3492015-12-14014 December 2015 2015-12-FINAL Outlines ML16012A3652015-12-14014 December 2015 2015-12 Final Operating Test ML16012A3672015-12-14014 December 2015 2015-12 Post-Examination Comments ML16021A1072015-12-14014 December 2015 2015-12 Public Forms ML15334A4862015-11-30030 November 2015 2015-12-Exam Approval Ltr_ ML14237A2332014-07-31031 July 2014 ANO2-2014-07 Draft Operating Test Comments ML14237A2292014-07-31031 July 2014 ANO2-2014-07 Draft Operating Test ML14237A2072014-07-31031 July 2014 ANO2-2014-07 Draft Outlines ML14181A3842014-06-30030 June 2014 Generic Fundamentals Examination Results June 2014 LIC-14-0076, 2014-05 Post Exam Analysis2014-06-0606 June 2014 2014-05 Post Exam Analysis ML14184B2982014-05-23023 May 2014 2014-04 Public Forms ML14184B3092014-05-22022 May 2014 2014-05 Draft Outline ML14184B1632014-05-22022 May 2014 2014-05-Draft Operating Test Comments ML14184B1492014-05-22022 May 2014 2014-05 Draft Written Exam Comments ML14184B1482014-05-22022 May 2014 2014-05 Draft Operating Test ML14184B1472014-05-22022 May 2014 2014-04 Draft Written Exam ML14267A3282014-05-22022 May 2014 2014-05 Final Outlines ML14181A0302014-05-22022 May 2014 2014-05 Final Operating Test ML14184B3212014-05-22022 May 2014 2014-05-Draft Outline Comments ML14128A1182014-05-0808 May 2014 2014-05-Examination Approval ML12291A7362012-09-21021 September 2012 09 Post Exam Analysis ML12291A7322012-09-21021 September 2012 2012-09 Final Written Exam ML12325A3882012-09-21021 September 2012 Fc 2012-09 Draft Outlines ML12325A3962012-09-21021 September 2012 FC-2012-09-DRAFT Outline Comments ML12325A3982012-09-21021 September 2012 2012-09 Draft Retake Written Exam ML12325A4082012-09-21021 September 2012 Fc 2012-09 Final Outlines ML12325A4142012-09-21021 September 2012 Fc 2012-09 Post Exam Analysis ML12325A4202012-09-21021 September 2012 09 Public Forms ML12325A4032012-09-21021 September 2012 FC-2012-09 Draft Written Exam Comments Steely ML1226300422012-09-19019 September 2012 NRC Initial Operator Licensing Examination Approval ML12180A4522012-06-28028 June 2012 Notification of NRC Retake Operator Licensing Examination 05000285/2012302 LIC-12-0055, FCS 2012-04 Post Exam Comments and Analysis2012-04-26026 April 2012 FCS 2012-04 Post Exam Comments and Analysis ML12156A3392012-04-20020 April 2012 FCS 2012-04 Draft Outline Comments ML12153A2782012-04-20020 April 2012 FC-2012-04 Final Written and Op Test Outlines ML12156A0032012-04-20020 April 2012 FC-2012-04 Final Operating Test ML12156A0052012-04-20020 April 2012 2012-04 Final Written Exam ML12156A3292012-04-20020 April 2012 FC-2012-04 Draft Outlines ML12156A3432012-04-20020 April 2012 FC-2012-04 Draft Operating Test ML12157A2832012-04-20020 April 2012 FCS 2012-04 Draft Operating Test Comments ML12157A3912012-04-20020 April 2012 2012-04 Draft Written Exam ML12191A2402012-04-20020 April 2012 04 Public Forms 2016-07-07
[Table view] |
Text
Comments on Fort C alhoun Ini tial Lice nsing Exam Ope rating Section 1.Scenarios 1, 2, 3, and 4 a ll have similar mal function wi th the Steam Genera tor Level transmi tter. Response: Al though malfunctions look similar, actions required are different for the opera tors.Che ck du ring val ida tion we ek.2.Standard Post trip actions listed as c ritical step in some scen arios, but not in others.
Response: Onl y listed as critical if there were actions nec essary rather than just veri fication of proper response of automatic function
.3.Securing of 1 reacto r coolant pump per loop a t 1350 psia listed as c ritical i n scenario 1
, but not in sc enario 2.Response: W ill make it critical.
4.Manual control of FRV marked as critical in scenari os 3, not criti cal in sce nario 1, 2, a nd 4.Response: Will check and mark as critical if appropriate.
5.Why is HPSI throttling a critical ste p in scenari o 4, but not i n scenario 1
?Response: Should be, will make critical.
- 6. JPM-0613 A: How long does ap plicant hav e to start pump be fore equipment damage/
UNSAT? Response: Will need to determine.
7.JPM-0613A: How many pump restart attempts are allowed if applicant does not hold start switch in the start po sition?Response: One 8.JPM-0613A: JPM see ms very si mple, with out much discri minatory v alue.Response: Ch osen because of importance, w hen vali dated previ ously, most o perators failed.
Proc edur e w as mo difi ed a s a r esul t. D eci sio n to chec k dur ing v ali dati on w eek.9.JPM-RO-CO-1: Sho uld a ppli cant b e giv en cop y of pr ocedu re or d o they need to identify it before copy i s provide d?Resp onse: App lican t sho uld id enti fy pr oced ure, will add wordin g to JPM.10.JPM-RO-CO-2: JPM appears to have very little discriminatory value to determine if appli cant i s compe tent.Respo nse: Thi s is a very criti cal fun ction. Appl icant needs to id entify proce dure a nd lo cate appl ica ble grap hs. D eci sio n to chec k dur ing v ali dati on w eek.11.JPM-RO-EC-1:
Is it neces sary for the app licant to i dentify the sp ecific paths, i ncluding pumps and sourc es, for satisfactory co mpletion of the c ritical step
?Respo nse: Y es, w ill add w ordin g to JPM so thi s is c lear.12.JPM-RO-EC-1: Are referenc es to be directly provided to the applicant at start of JPM or do they nee d to ide ntify and loc ate r efere nces as p art o f the task?Res pons e: A ppl ica nt ne eds to i dent ify and loc ate r efere nce mate rial s as part of th e tas k.
13.JPM-RO-RC-1: Very simple if being perf ormed as a stand alone JPM, W ould have little discriminatory value.Respons e: JPM will be com pleted in c onjunc tion with an other J PM requir ing RCA ent ry.14.JPM-0719M: Initiating cu e needs ty po corrections Response: Will make necessa ry correction s.15.JPM-0 719M: Is ap plica nt g iven a c opy of the pr oced ure a t beg innin g of JPM?Response: Yes, that is what would be expected when operator is tasked with completion of th is task.16.JPM-0719M: Initiating cu e that HC-745 is in HA ND appears to be out of step w ith the procedure.
Response: Will drop from in itiating cue, add step in JPM requiri ng applicant to have HC
-745 posit ioned in HA ND an d add cue th at Con trol R oom rep orts HC-745 i s in H AND. 17.JPM-0719M: Step 4 of Atta chment 5B, read and record in itial H2 sample connec tion and H2 conc entration, is not in the JP M. Is this the same sample point and concentration listed in Attachme nt 5A?Respons e: Not su re, will add st ep for applicant to conta ct cont rol and pr ovide cue as necessa ry.18.JPM-0719M: How lo ng of a delay is allow ed betwee n completion of step 6a and 6b, caution states step 6b must be competed immedia tely after step 6a or a radi ological relea se to r oom 59 and equ ipment damage wil l resu lt.Response: Do n't know, w ill determi ne and make nece ssary entrie s.19.JPM-0356:
Why is it critical to ensure AI-133 A switch is in emergency a critical step at one po int i n JPM , but p laci ng it i n emerge ncy e arlie r in th e JPM isn't?Respons e:Not su re, will dete rmine an d make change s as neces sary.20.JPM-0225:
Does appli cant need to n otify Control room that potabl e water i s aligned before cue is giv en and flow verified?
Response: Yes, will add step for applicant to infor m control.
21.JPM0 726: Why i s the c ue "The y are shut a nd w ill not op en" giv en to t he app lica nt.Applicant should be given approp riate indi cation and ma ke necessary d eterminations a s appropriate.
Response: Agree, will change cue to gr een light lite, and direction from the control room if report made that un able to ope n valv es.22.JPM-SRO-CO-2: JPM appears to have very little discriminatory value to determine if appli cant i s compe tent.Respo nse: Will l ook at a dding addit ional requir ements to it.23.JPM-SRO-RC-1: JPM appears to have very little discriminatory value to determine if appli cant i s compe tent.Respo nse: Will l ook at a dding addit ional requir ements to it.24.JPM-0329: JPM step re quires 72%, no margin provi ded. Is this the requ iremen t?Respo nse: N o, wi ll ad d a ba nd abo ve 72% but b elow high l evel alarm.
25.JPM-0329:
Need guidance in case ap plicant ex ceeds high pres sure limit w hen filling SIT, not cove red by proce dure. Response: We have a se parate procedure for adjusting the pres sure. Will add note for examiner tha t if applican t reports SIT pressure limit ex ceeded, exa miner provi des cue that another operator will take care of this.
26.JPM-0387:
Why are keys being plac ed in the a ppropriate sw ithes for the appl icant, the Procedure states obtain neces sary keys.
Respo nse: Will c hange J PM. A ppli cant w ill obtai n keys and h ave t o loc ate the appro priate switches to operate.
27.JPM-0387:
Typo in step 24 Response: Will correct 28.JPM-0387:
Need to add note to exa miner not to giv e cue at JPM step 39 until after applicant s tates requirement of Proc edure step 11.
Response: Will add no te.29.JPM-0778:
Why isn't technical specification recognition an d log entry a critical s tep?Response: Will mark as criti cal for operator to notify Control room of entry i nto the TS and reque st log en try.30.JPM-0627:
Have conc ern that appli cant may focus on issue of failed pressure control sys tem a nd n ot co mple te as sign ed ta sk.Res pons e: Will add note to e xam ine r to i nform app lic ant t hat a noth er op erat or w ill take necessary a ctions to add ress failure.