MONTHYEARML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 LIC-16-0056, Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations.2016-07-0707 July 2016 Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations. ML16089A0712016-03-29029 March 2016 Generic Fundamentals Examination Results for March 9, 2016 IR 05000285/20153012016-01-20020 January 2016 Er 05000285/2015301; 12/07/2015 - 01/13/2016; Fort Calhoun Station; Initial Operator Licensing Examination Report ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16012A3272015-12-14014 December 2015 2015-12 Draft Outline Comments ML16012A3242015-12-14014 December 2015 2015-12 Draft Outlines ML16012A3372015-12-14014 December 2015 2015-12-DRAFT Written Examination Comments ML16012A3392015-12-14014 December 2015 2015-12 Draft Operating Test ML16012A3452015-12-14014 December 2015 2015-12 Draft Operating Test Comments ML16012A3652015-12-14014 December 2015 2015-12 Final Operating Test ML16012A3672015-12-14014 December 2015 2015-12 Post-Examination Comments ML16012A3492015-12-14014 December 2015 2015-12-FINAL Outlines ML16021A1072015-12-14014 December 2015 2015-12 Public Forms ML15334A4862015-11-30030 November 2015 2015-12-Exam Approval Ltr_ LIC-15-0137, Revised Final Initial Licensed Operator Examination2015-11-24024 November 2015 Revised Final Initial Licensed Operator Examination LIC-15-0127, for Calhoun Station, Unit 1 - Provides the Final Reactor Operator (RO) and Senior Reactor Operator (SRO) License Applications2015-11-24024 November 2015 for Calhoun Station, Unit 1 - Provides the Final Reactor Operator (RO) and Senior Reactor Operator (SRO) License Applications ML14237A2332014-07-31031 July 2014 ANO2-2014-07 Draft Operating Test Comments ML14237A2292014-07-31031 July 2014 ANO2-2014-07 Draft Operating Test ML14237A2072014-07-31031 July 2014 ANO2-2014-07 Draft Outlines ML14181A3842014-06-30030 June 2014 Generic Fundamentals Examination Results June 2014 LIC-14-0076, 2014-05 Post Exam Analysis2014-06-0606 June 2014 2014-05 Post Exam Analysis ML14184B2982014-05-23023 May 2014 2014-04 Public Forms ML14181A0302014-05-22022 May 2014 2014-05 Final Operating Test ML14184B1482014-05-22022 May 2014 2014-05 Draft Operating Test ML14184B1472014-05-22022 May 2014 2014-04 Draft Written Exam ML14184B1492014-05-22022 May 2014 2014-05 Draft Written Exam Comments ML14184B3092014-05-22022 May 2014 2014-05 Draft Outline ML14184B3212014-05-22022 May 2014 2014-05-Draft Outline Comments ML14267A3282014-05-22022 May 2014 2014-05 Final Outlines ML14184B1632014-05-22022 May 2014 2014-05-Draft Operating Test Comments ML14128A1182014-05-0808 May 2014 2014-05-Examination Approval ML14063A6242014-03-0404 March 2014 IR 05000285-14-301, 02/16/2013, Fort Calhoun, Revision to Notification of NRC Initial Operator ML12291A7362012-09-21021 September 2012 09 Post Exam Analysis ML12291A7322012-09-21021 September 2012 2012-09 Final Written Exam ML12325A3882012-09-21021 September 2012 Fc 2012-09 Draft Outlines ML12325A3962012-09-21021 September 2012 FC-2012-09-DRAFT Outline Comments ML12325A3982012-09-21021 September 2012 2012-09 Draft Retake Written Exam ML12325A4082012-09-21021 September 2012 Fc 2012-09 Final Outlines ML12325A4142012-09-21021 September 2012 Fc 2012-09 Post Exam Analysis ML12325A4202012-09-21021 September 2012 09 Public Forms ML12325A4032012-09-21021 September 2012 FC-2012-09 Draft Written Exam Comments Steely ML1226300422012-09-19019 September 2012 NRC Initial Operator Licensing Examination Approval ML12180A4522012-06-28028 June 2012 Notification of NRC Retake Operator Licensing Examination 05000285/2012302 LIC-12-0055, FCS 2012-04 Post Exam Comments and Analysis2012-04-26026 April 2012 FCS 2012-04 Post Exam Comments and Analysis ML12157A2832012-04-20020 April 2012 FCS 2012-04 Draft Operating Test Comments ML12153A2782012-04-20020 April 2012 FC-2012-04 Final Written and Op Test Outlines ML12156A0032012-04-20020 April 2012 FC-2012-04 Final Operating Test ML12156A0052012-04-20020 April 2012 2012-04 Final Written Exam ML12156A3292012-04-20020 April 2012 FC-2012-04 Draft Outlines 2017-01-13
[Table view] Category:Part 55 Examination Related Material
MONTHYEARLIC-16-0056, Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations.2016-07-0707 July 2016 Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations. ML16089A0712016-03-29029 March 2016 Generic Fundamentals Examination Results for March 9, 2016 IR 05000285/20153012016-01-20020 January 2016 Er 05000285/2015301; 12/07/2015 - 01/13/2016; Fort Calhoun Station; Initial Operator Licensing Examination Report ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16012A3392015-12-14014 December 2015 2015-12 Draft Operating Test ML16012A3242015-12-14014 December 2015 2015-12 Draft Outlines ML16012A3272015-12-14014 December 2015 2015-12 Draft Outline Comments ML16012A3372015-12-14014 December 2015 2015-12-DRAFT Written Examination Comments ML16012A3452015-12-14014 December 2015 2015-12 Draft Operating Test Comments ML16012A3492015-12-14014 December 2015 2015-12-FINAL Outlines ML16012A3652015-12-14014 December 2015 2015-12 Final Operating Test ML16012A3672015-12-14014 December 2015 2015-12 Post-Examination Comments ML16021A1072015-12-14014 December 2015 2015-12 Public Forms ML15334A4862015-11-30030 November 2015 2015-12-Exam Approval Ltr_ ML14237A2332014-07-31031 July 2014 ANO2-2014-07 Draft Operating Test Comments ML14237A2292014-07-31031 July 2014 ANO2-2014-07 Draft Operating Test ML14237A2072014-07-31031 July 2014 ANO2-2014-07 Draft Outlines ML14181A3842014-06-30030 June 2014 Generic Fundamentals Examination Results June 2014 LIC-14-0076, 2014-05 Post Exam Analysis2014-06-0606 June 2014 2014-05 Post Exam Analysis ML14184B2982014-05-23023 May 2014 2014-04 Public Forms ML14184B3092014-05-22022 May 2014 2014-05 Draft Outline ML14184B1632014-05-22022 May 2014 2014-05-Draft Operating Test Comments ML14184B1492014-05-22022 May 2014 2014-05 Draft Written Exam Comments ML14184B1482014-05-22022 May 2014 2014-05 Draft Operating Test ML14184B1472014-05-22022 May 2014 2014-04 Draft Written Exam ML14267A3282014-05-22022 May 2014 2014-05 Final Outlines ML14181A0302014-05-22022 May 2014 2014-05 Final Operating Test ML14184B3212014-05-22022 May 2014 2014-05-Draft Outline Comments ML14128A1182014-05-0808 May 2014 2014-05-Examination Approval ML12291A7362012-09-21021 September 2012 09 Post Exam Analysis ML12291A7322012-09-21021 September 2012 2012-09 Final Written Exam ML12325A3882012-09-21021 September 2012 Fc 2012-09 Draft Outlines ML12325A3962012-09-21021 September 2012 FC-2012-09-DRAFT Outline Comments ML12325A3982012-09-21021 September 2012 2012-09 Draft Retake Written Exam ML12325A4082012-09-21021 September 2012 Fc 2012-09 Final Outlines ML12325A4142012-09-21021 September 2012 Fc 2012-09 Post Exam Analysis ML12325A4202012-09-21021 September 2012 09 Public Forms ML12325A4032012-09-21021 September 2012 FC-2012-09 Draft Written Exam Comments Steely ML1226300422012-09-19019 September 2012 NRC Initial Operator Licensing Examination Approval ML12180A4522012-06-28028 June 2012 Notification of NRC Retake Operator Licensing Examination 05000285/2012302 LIC-12-0055, FCS 2012-04 Post Exam Comments and Analysis2012-04-26026 April 2012 FCS 2012-04 Post Exam Comments and Analysis ML12156A3392012-04-20020 April 2012 FCS 2012-04 Draft Outline Comments ML12153A2782012-04-20020 April 2012 FC-2012-04 Final Written and Op Test Outlines ML12156A0032012-04-20020 April 2012 FC-2012-04 Final Operating Test ML12156A0052012-04-20020 April 2012 2012-04 Final Written Exam ML12156A3292012-04-20020 April 2012 FC-2012-04 Draft Outlines ML12156A3432012-04-20020 April 2012 FC-2012-04 Draft Operating Test ML12157A2832012-04-20020 April 2012 FCS 2012-04 Draft Operating Test Comments ML12157A3912012-04-20020 April 2012 2012-04 Draft Written Exam ML12191A2402012-04-20020 April 2012 04 Public Forms 2016-07-07
[Table view] |
Text
Comments on Fort Calhoun Initial Licensing Exam Operating Section
- 1. Scenarios 1, 2, 3, and 4 all have similar malfunction with the Steam Generator Level transmitter.
Response: Although malfunctions look similar, actions required are different for the operators.
Check during validation week.
- 2. Standard Post trip actions listed as critical step in some scenarios, but not in others.
Response: Only listed as critical if there were actions necessary rather than just verification of proper response of automatic function.
- 3. Securing of 1 reactor coolant pump per loop at 1350 psia listed as critical in scenario 1, but not in scenario 2.
Response: Will make it critical.
- 4. Manual control of FRV marked as critical in scenarios 3, not critical in scenario 1, 2, and 4.
Response: Will check and mark as critical if appropriate.
- 5. Why is HPSI throttling a critical step in scenario 4, but not in scenario 1?
Response: Should be, will make critical.
- 6. JPM-0613A: How long does applicant have to start pump before equipment damage/
UNSAT?
Response: Will need to determine.
- 7. JPM-0613A: How many pump restart attempts are allowed if applicant does not hold start switch in the start position?
Response: One
- 8. JPM-0613A: JPM seems very simple, without much discriminatory value.
Response: Chosen because of importance, when validated previously, most operators failed.
Procedure was modified as a result. Decision to check during validation week.
- 9. JPM-RO-CO-1: Should applicant be given copy of procedure or do they need to identify it before copy is provided?
Response: Applicant should identify procedure, will add wording to JPM.
- 10. JPM-RO-CO-2: JPM appears to have very little discriminatory value to determine if applicant is competent.
Response: This is a very critical function. Applicant needs to identify procedure and locate applicable graphs. Decision to check during validation week.
- 11. JPM-RO-EC-1: Is it necessary for the applicant to identify the specific paths, including pumps and sources, for satisfactory completion of the critical step?
Response: Yes, will add wording to JPM so this is clear.
- 12. JPM-RO-EC-1: Are references to be directly provided to the applicant at start of JPM or do they need to identify and locate references as part of the task?
Response: Applicant needs to identify and locate reference materials as part of the task.
- 13. JPM-RO-RC-1: Very simple if being performed as a stand alone JPM, Would have little discriminatory value.
Response: JPM will be completed in conjunction with another JPM requiring RCA entry.
- 14. JPM-0719M: Initiating cue needs typo corrections Response: Will make necessary corrections.
- 15. JPM-0719M: Is applicant given a copy of the procedure at beginning of JPM?
Response: Yes, that is what would be expected when operator is tasked with completion of this task.
- 16. JPM-0719M: Initiating cue that HC-745 is in HAND appears to be out of step with the procedure.
Response: Will drop from initiating cue, add step in JPM requiring applicant to have HC-745 positioned in HAND and add cue that Control Room reports HC-745 is in HAND.
- 17. JPM-0719M: Step 4 of Attachment 5B, read and record initial H2 sample connection and H2 concentration, is not in the JPM. Is this the same sample point and concentration listed in Attachment 5A?
Response: Not sure, will add step for applicant to contact control and provide cue as necessary.
- 18. JPM-0719M: How long of a delay is allowed between completion of step 6a and 6b, caution states step 6b must be competed immediately after step 6a or a radiological release to room 59 and equipment damage will result.
Response: Dont know, will determine and make necessary entries.
- 19. JPM-0356: Why is it critical to ensure AI-133A switch is in emergency a critical step at one point in JPM, but placing it in emergency earlier in the JPM isnt?
Response:Not sure, will determine and make changes as necessary.
- 20. JPM-0225: Does applicant need to notify Control room that potable water is aligned before cue is given and flow verified?
Response: Yes, will add step for applicant to inform control.
- 21. JPM0726: Why is the cue They are shut and will not open given to the applicant.
Applicant should be given appropriate indication and make necessary determinations as appropriate.
Response: Agree, will change cue to green light lite, and direction from the control room if report made that unable to open valves.
- 22. JPM-SRO-CO-2: JPM appears to have very little discriminatory value to determine if applicant is competent.
Response: Will look at adding additional requirements to it.
- 23. JPM-SRO-RC-1: JPM appears to have very little discriminatory value to determine if applicant is competent.
Response: Will look at adding additional requirements to it.
- 24. JPM-0329: JPM step requires 72%, no margin provided. Is this the requirement?
Response: No, will add a band above 72% but below high level alarm.
- 25. JPM-0329: Need guidance in case applicant exceeds high pressure limit when filling SIT, not covered by procedure.
Response: We have a separate procedure for adjusting the pressure. Will add note for examiner that if applicant reports SIT pressure limit exceeded, examiner provides cue that another operator will take care of this.
- 26. JPM-0387: Why are keys being placed in the appropriate swithes for the applicant, the Procedure states obtain necessary keys.
Response: Will change JPM. Applicant will obtain keys and have to locate the appropriate switches to operate.
- 27. JPM-0387: Typo in step 24 Response: Will correct
- 28. JPM-0387: Need to add note to examiner not to give cue at JPMstep 39 until after applicant states requirement of Procedure step 11.
Response: Will add note.
- 29. JPM-0778: Why isnt technical specification recognition and log entry a critical step?
Response: Will mark as critical for operator to notify Control room of entry into the TS and request log entry.
- 30. JPM-0627: Have concern that applicant may focus on issue of failed pressure control system and not complete assigned task.
Response: Will add note to examiner to inform applicant that another operator will take necessary actions to address failure.