MONTHYEARRS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-050, Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2024-05-0909 May 2024 Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-031, Updated Safety Analysis Report (Usar), Revision 232024-04-0101 April 2024 Updated Safety Analysis Report (Usar), Revision 23 RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. RS-24-005, Additional Information Supporting Request for Partial Site Release2024-02-0808 February 2024 Additional Information Supporting Request for Partial Site Release RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-090, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2023-09-0707 September 2023 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2023-08-21021 August 2023 Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation RS-23-085, Supplemental Information Related to Request for Partial Site Release2023-08-0303 August 2023 Supplemental Information Related to Request for Partial Site Release RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-073, Request for Partial Site Release2023-06-0707 June 2023 Request for Partial Site Release RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air2023-03-0101 March 2023 Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-23-002, Application to Adopt TSTF-332, ECCS Response Time Testing2023-01-13013 January 2023 Application to Adopt TSTF-332, ECCS Response Time Testing RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-121, Notice of Intent to Pursue Subsequent License Renewal Applications2022-11-0909 November 2022 Notice of Intent to Pursue Subsequent License Renewal Applications RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-107, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2022-09-29029 September 2022 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-089, Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-07-25025 July 2022 Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock RS-22-060, Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling RS-22-061, Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves RS-22-068, Constellation Radiological Emergency Plan Addendum Revision2022-05-19019 May 2022 Constellation Radiological Emergency Plan Addendum Revision RS-22-062, Supplemental Information to Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System2022-04-26026 April 2022 Supplemental Information to Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System RS-22-055, Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan2022-04-18018 April 2022 Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-020, Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-04-0707 April 2022 Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-044, Unit 1 - Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System2022-03-31031 March 2022 Unit 1 - Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-042, Report on Status of Decommissioning Funding for Shutdown Reactors2022-03-23023 March 2022 Report on Status of Decommissioning Funding for Shutdown Reactors RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-102, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2021-09-29029 September 2021 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-087, Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values2021-08-31031 August 2021 Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel RS-21-076, Application to Adopt TSTF-273, Safety Function Determination Program Clarifications2021-07-30030 July 2021 Application to Adopt TSTF-273, Safety Function Determination Program Clarifications RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2021-06-30030 June 2021 Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements 2024-06-14
[Table view] |
Text
RS-08-149 RA-09-006 5928-08-20226 January 9, 2009 U.S.Nuclear Regulatory Commission Attn: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Clinton Power Station, Unit 1 Facility Operating License No.NPF-62 NRC Docket No.50-461 Oyster Creek Nuclear Generating Station Facility Operating License No.DPR-16 NRC Docket Nos.50-219&72-15 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No.DPR-50 NRC Docket No.50-289
Subject:
Pending NRC Actions Requested by AmerGen Energy Company, LLC
References:
(1)NRC letters, Christopher Gratton (USNRC)to Charles G.Pardee (Exelon/AmerGen)"Order Approving Transfer of the Operating License and Conforming Amendment," dated December 23, 2008 (Three letters, one each involving Clinton Power Station, Oyster Creek Nuclear Generating Station, and Three Mile Island Nuclear Station, Unit 1)(2)NRC letter, Christopher Gratton (USNRC)to Charles G.Pardee (Exelon)"Issuance of Conforming Amendments", dated January 8,2009, involving Clinton Power Station, Oyster Creek Nuclear Generating Station, and Three Mile Island Nuclear Station, Unit 1 In the Reference 1 letters, the Nuclear Regulatory Commission (NRC)issued Orders approving the transfer of the above operating licenses from AmerGen Energy Company, LLC to Exelon Generation Company, LLC.The license transfers were completed on January 8,2009.
U.S.Nuclear Regulatory Commission January 9, 2009 Page 2 In the Reference 2 letter, the NRC issued conforming amendments associated with these license transfers; the conforming amendments reflect the actual transfer of the operating licenses for these units to Exelon Generation Company, LLC.Prior to the license transfers, AmerGen Energy Company, LLC made docketed submittals to the NRC that requested specific licensing actions, such as license amendment requests, relief requests, exemption requests, etc.Furthermore, in the application for the license transfers, Exelon Generation Company, LLC stated that upon transfer of the licenses, Exelon Generation Company, LLC would assume all current regulatory commitments made for these units.Accordingly, Exelon Generation Company, LLC hereby adopts and endorses those docketed requests currently before the NRC for review and approval.Exelon Generation Company, LLC requests that the NRC continue to process those pending actions on theschedulespreviously requested by AmerGen Energy Company, LLC.There are no new commitments or changes to existing commitments being made in this letter.Should you have any questions regarding this matter, please contact David Helker at (610)5525.I declare under penalty of perjury that the foregoing is true and correct.Executed on the 9 th day of January 2009./fA/1 U Pamela B.DirectorLicensing&Regulatory Affairs Exelon Generation Company, LLC cc: Regional Administrator
-NRCRegionI Regional Administrator
-NRC Region III C.Gratton-NRC Project Manager, NRR-(EGC/AmerGen Fleet)NRC Senior Resident Inspector-Clinton Power Station, Unit 1 NRC Senior Resident Inspector-Oyster Creek Nuclear Generating Station NRC Senior Resident Inspector-Three Mile Island Nuclear Station, Unit 1 NRC Project Manager, NRR-Clinton Power Station, Unit 1 NRC Project Manager, NRR-Oyster Creek Nuclear Generating Station NRC Project Manager, NRR-Three Mile Island Nuclear Station, Unit 1 Illinois Emergency Management Agency-Division of Nuclear Safety Director, Bureau of Radiation Protection
-Pennsylvania Department of Environmental Resources Director, Bureau of Nuclear Engineering, New Jersey Department of Environmental Protection Chairman, Board of County Commissioners of Dauphin County, PA Chairman, Board of Supervisors of Londonderry Township, PA Mayor of Lacey Township, Forked River, NJR.R.Janati, Commonwealth of Pennsylvania TMI File No.08040
Text
RS-08-149 RA-09-006 5928-08-20226 January 9, 2009 U.S.Nuclear Regulatory Commission Attn: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Clinton Power Station, Unit 1 Facility Operating License No.NPF-62 NRC Docket No.50-461 Oyster Creek Nuclear Generating Station Facility Operating License No.DPR-16 NRC Docket Nos.50-219&72-15 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No.DPR-50 NRC Docket No.50-289
Subject:
Pending NRC Actions Requested by AmerGen Energy Company, LLC
References:
(1)NRC letters, Christopher Gratton (USNRC)to Charles G.Pardee (Exelon/AmerGen)"Order Approving Transfer of the Operating License and Conforming Amendment," dated December 23, 2008 (Three letters, one each involving Clinton Power Station, Oyster Creek Nuclear Generating Station, and Three Mile Island Nuclear Station, Unit 1)(2)NRC letter, Christopher Gratton (USNRC)to Charles G.Pardee (Exelon)"Issuance of Conforming Amendments", dated January 8,2009, involving Clinton Power Station, Oyster Creek Nuclear Generating Station, and Three Mile Island Nuclear Station, Unit 1 In the Reference 1 letters, the Nuclear Regulatory Commission (NRC)issued Orders approving the transfer of the above operating licenses from AmerGen Energy Company, LLC to Exelon Generation Company, LLC.The license transfers were completed on January 8,2009.
U.S.Nuclear Regulatory Commission January 9, 2009 Page 2 In the Reference 2 letter, the NRC issued conforming amendments associated with these license transfers; the conforming amendments reflect the actual transfer of the operating licenses for these units to Exelon Generation Company, LLC.Prior to the license transfers, AmerGen Energy Company, LLC made docketed submittals to the NRC that requested specific licensing actions, such as license amendment requests, relief requests, exemption requests, etc.Furthermore, in the application for the license transfers, Exelon Generation Company, LLC stated that upon transfer of the licenses, Exelon Generation Company, LLC would assume all current regulatory commitments made for these units.Accordingly, Exelon Generation Company, LLC hereby adopts and endorses those docketed requests currently before the NRC for review and approval.Exelon Generation Company, LLC requests that the NRC continue to process those pending actions on theschedulespreviously requested by AmerGen Energy Company, LLC.There are no new commitments or changes to existing commitments being made in this letter.Should you have any questions regarding this matter, please contact David Helker at (610)5525.I declare under penalty of perjury that the foregoing is true and correct.Executed on the 9 th day of January 2009./fA/1 U Pamela B.DirectorLicensing&Regulatory Affairs Exelon Generation Company, LLC cc: Regional Administrator
-NRCRegionI Regional Administrator
-NRC Region III C.Gratton-NRC Project Manager, NRR-(EGC/AmerGen Fleet)NRC Senior Resident Inspector-Clinton Power Station, Unit 1 NRC Senior Resident Inspector-Oyster Creek Nuclear Generating Station NRC Senior Resident Inspector-Three Mile Island Nuclear Station, Unit 1 NRC Project Manager, NRR-Clinton Power Station, Unit 1 NRC Project Manager, NRR-Oyster Creek Nuclear Generating Station NRC Project Manager, NRR-Three Mile Island Nuclear Station, Unit 1 Illinois Emergency Management Agency-Division of Nuclear Safety Director, Bureau of Radiation Protection
-Pennsylvania Department of Environmental Resources Director, Bureau of Nuclear Engineering, New Jersey Department of Environmental Protection Chairman, Board of County Commissioners of Dauphin County, PA Chairman, Board of Supervisors of Londonderry Township, PA Mayor of Lacey Township, Forked River, NJR.R.Janati, Commonwealth of Pennsylvania TMI File No.08040