ML110820684

From kanterella
Revision as of 22:23, 10 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2011-02-DRAFT Outline Comments
ML110820684
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/23/2011
From: Apger G
NRC Region 4
To:
Entergy Operations
References
50-368/11-301
Download: ML110820684 (2)


Text

Attachment 6 OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Facility: ANO Unit 2 First Exam Date:January 28, 2011 Written Exam Outline 11/15/10 Comment Resolution 1 2011 Exam Sampling Methodology has 2 flaws: 1) The statement that the program would allow selecting K/As greater than 2.5 would be an

invalid sampling method because

K/As equal to 2.5 must be included in the sample. 2) No statement of fact exists indicating that you reviewed K/As less than 2.5 for those that may have a site-specific priority and

determined there were none.

Fix these two errors in your submitted document and resubmit it. K/As equal to 2.5

were sampled as indicated in your submitted outline. RESOLVED 2 3 4 5 Administrative JPM Outline 11/15/10 Comment Resolution 1 A1: 2008 NRC 2 A8: 2009 NRC 3 4 5 Control Room / In-Plant System JPM Outline 11/15/10 Comment Resolution 1 S8: 2009 NRC 2 P1: 2008 NRC 3 4 5

Attachment 6 OBDI 202 - IOLE Process Simulator Scenario Outline Comments 11/15/10 Comment Resolution 1 No comments 2 No comments 3 Scenario 3 narrative states that the power ascension and the feed pump operation will occur simultaneously. If so, will the BOP operate the main turbine for temperature control? If not then the BOP will get no credit for event 2. RESOLVED4 5