ML110820684

From kanterella
Jump to navigation Jump to search
2011-02-DRAFT Outline Comments
ML110820684
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/23/2011
From: Apger G
NRC Region 4
To:
Entergy Operations
References
50-368/11-301
Download: ML110820684 (2)


Text

DRAFT OUTLINE COMMENTS Facility: ANO Unit 2 First Exam Date: January 28, 2011 Written Exam Outline 11/15/10 Comment Resolution 2011 Exam Sampling Methodology has Fix these two errors in your submitted 2 flaws: document and resubmit it. K/As equal to 2.5

1) The statement that the program were sampled as indicated in your submitted would allow selecting K/As outline.

greater than 2.5 would be an RESOLVED invalid sampling method because 1 K/As equal to 2.5 must be included in the sample.

2) No statement of fact exists indicating that you reviewed K/As less than 2.5 for those that may have a site-specific priority and determined there were none.

2 3

4 5

Administrative JPM Outline 11/15/10 Comment Resolution 1 A1: 2008 NRC 2 A8: 2009 NRC 3

4 5

Control Room / In-Plant System JPM Outline 11/15/10 Comment Resolution 1 S8: 2009 NRC 2 P1: 2008 NRC 3

4 5 OBDI 202 - IOLE Process

Simulator Scenario Outline Comments 11/15/10 Comment Resolution 1 No comments 2 No comments Scenario 3 narrative states that the RESOLVED power ascension and the feed pump operation will occur simultaneously. If 3

so, will the BOP operate the main turbine for temperature control? If not then the BOP will get no credit for event 2.

4 5 OBDI 202 - IOLE Process