Similar Documents at Perry |
---|
Category:E-Mail
MONTHYEARML24276A1002024-10-0202 October 2024 Email: Perry LRA - Requests for Confirmatory Information (RCI) ML24276A1282024-10-0202 October 2024 LRA - Requests for Additional Information - Round 1 (Set 3) - Email to Applicant ML24247A0212024-09-0606 September 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Perry License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2024-0006782) ML24241A1012024-08-28028 August 2024 LRA - Requests for Additional Information - Round 1 (Set 2)_Email to Applicant ML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24192A2222024-07-0909 July 2024 LRA Changes - Selective Leaching Program (AMP XI.33) ML24192A2232024-07-0808 July 2024 License Renewal Clarification (AMP XI.33) ML24103A1262024-05-0808 May 2024 Email to Phil Lashley Decision on the Exemption Request for Perry ML24127A1992024-05-0606 May 2024 NRR E-mail Capture - (External_Sender) Perry License Renewal Scoping and Screening Breakout Question B.2.24 (Partial TRP-55) ML24103A1272024-05-0303 May 2024 Email to Phil Lashley Availability of Environmental Assessment for the Perry Exemption ML24120A3222024-04-26026 April 2024 Response from State of Oh Regarding Review of Environmental Assessment for Perry HI-STORM Exemption Request ML24120A3212024-04-25025 April 2024 Email to State of Oh Requesting Review of EA for Perry HI-STORM Exemption Request ML24061A1002024-03-29029 March 2024 Energy Harbor Fleet- Closing of Transaction Between Vistra Operations Company LLC and Energy Harbor Nuclear Corporation (Email) ML24080A3922024-03-20020 March 2024 NRR E-mail Capture - Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Power Station Unit No. 1, and Perry Nuclear Power Plant, Unit No. - Acceptance of Requested Licensing Action Exemption for Final Safety Analysis Report Update ML24074A4272024-03-14014 March 2024 NRR E-mail Capture - Final RAI - Perry Request for Relief - Proposed Inservice Inspection Alternative VR-9 ML24052A0092024-02-16016 February 2024 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-264 ML24017A2392024-01-17017 January 2024 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Valve Testing Frequency Alternative VR-9 ML23226A0742023-08-14014 August 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Remove the Table of Contents from the Technical Specifications ML23180A2322023-06-29029 June 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-276-A, Revision 2 ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23095A3442023-04-0505 April 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Licensing Action Request Regarding Irradiated Fuel Management Plan ML23010A2892023-01-10010 January 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Delay in Issuance of License Amendment Regarding Revising the Methodology Used for Flood Hazard Analysis ML22341A0322022-11-30030 November 2022 10 CFR Part 21 Notification from Curtiss-Wright Nuclear Division for Qualtech Np Supplied Eaton TRM5 Timing Relays ML22241A0362022-08-29029 August 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Adopt TSTF-541, Revision 2 ML22167A1002022-06-16016 June 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Delay in Issuance of License Amendment and Exemptions Regarding Revising the Methodology Used for Flood Hazard Analysis (EPIDs No.L-2021-LLA-0067, L-2021-LLE-0022, L-2021-LLE-0023) ML22136A2122022-05-16016 May 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 ML22089A2452022-03-30030 March 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request VR-12 ML22020A0702022-01-18018 January 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Inservice Inspection Alternative IR-063 ML22020A0712022-01-18018 January 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Alternative VR-12 ML22020A0722022-01-18018 January 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Alternative Requests Regarding VR-10 and VR-11 Inservice Valve Testing ML21140A2802021-05-20020 May 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment and Exemptions Regarding Revising the Methodology Used for Flood Hazard Analysis (Epids: L-2021-LLA-0067, L-2021-LLE-0022, L-2021-LLE-0023) ML21110A6852021-04-19019 April 2021 NRR E-mail Capture - Final RAI - Perry - Request to Review the Emergency Plan ML21084A2562021-03-25025 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Adopt TSTF-002, Revision 1 ML21077A0012021-03-17017 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Correction to Acceptance of Relief Requests Regarding VR-3 VR-4, VR-5, VR-6, VR-7, and VR-8 Valve Testing Extensions (Epids: L-2021-LLR-0007 Through L-2021-LLR-0012) ML21070A4042021-03-11011 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant -Acceptance of License Amendment Request to Adopt TSTF-230, Revision 1 ML21063A1922021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-4, Revision 0 ML21063A1982021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-8, Revision 0 ML21063A1962021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-7, Revision 0 ML21063A1952021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-6, Revision 0 ML21063A1912021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-3, Revision 0 ML21063A1932021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-5, Revision 0 ML21063A1342021-03-0404 March 2021 E-Mail Concurrence - SR-2 SE ML21050A1032021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Requests VR-3, Rev. 0 and VR-5, Rev. 0 ML21050A1072021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request VR-7, Rev. 0 ML21050A1112021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Requests VR-4, Rev. 0 and VR-6, Rev. 0 ML21054A1742021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Requests Regarding VR-3 and VR-5 Valve Testing Extensions ML21054A1782021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Request Regarding VR-7 Check Valve Testing Extension ML21054A1802021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Requests Regarding VR-4, VR-6, and VR-8 Valve Testing Extensions ML21049A2702021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request SR-2, Rev. 0 (EPID: L-2021-LLR-0005) (2nd Round RAI) ML21032A3422021-02-0101 February 2021 NRR E-mail Capture - Final RAI - Perry Request for Relief - Proposed Alternative Request SR-2, Rev. 0 2024-09-06
[Table view] |
Text
file:///Cl/
...ments%20and%20Settings/srw1/Desktop/Perry%20Ohio%20Nuclear%20Plant%20Safety%20and%20Hydrolic%20Fracturing.htm
[5/11/2012 4:15:21 PM]
From:
Case, Michael Sent:
Friday, May 11, 2012 8:48 AM To:
jkline@ulmer.com Cc:
Richards, Stuart; Hogan, Rosemary; West, Stephanie
Subject:
Perry Ohio Nuclear Plant Safety and Hydrolic Fracturing
Dear Sir or Madam,
I am responding to an email you sent to our colleagues in the Department of Energy regarding hydraulic fracturing, earthquakes, and nuclear plant safety.
Thank you for your interest.
I hope the following questions and answersprepared by our technical experts at the Nuclear Regulatory Commission (NRC) will inform you as to our views on this important topic.
(1) What is being done to assess the effects of drilling and hydraulic fracturing on the safety of theplant? All currently operating nuclear power reactors are designed to withstand the effects of natural phenomena suchas earthquakes.
The NRC requires that safety-significant structures, systems, and components be designed totake into account:The most severe natural phenomena (earthquakes) historically reported for the site and surrounding area.
The NRC's regulations require additional design margin be added to account for the limited historical data
accuracy;Appropriate combinations of the effects of normal and accident conditions with the effects of the naturalphenomena; andThe importance of the safety functions to be performed.Drilling and hydraulic fracturing (or hydro-fracking) have not been directly shown to be the cause of significant earthquakes.
Rather, it is the disposal of the by-product wastewater of the process that has been implicated in thetriggering of local earthquakes.
Open literature sources report that there does appear to be a causal link betweenthe deep-well injection of wastewater from gas fracking operations and earthquakes at some locations, but not all.
Recent, moderate magnitude earthquakes have been associated with deep fluid injection in Arkansas, southernColorado, Texas, Oklahoma and Ohio.
Based on observations to date, the magnitudes of the earthquakes associated with these injection processes inthe United States have been less than about magnitude 5.6.
Earthquakes of this magnitude have historically hadlittle effect on well-engineered structures such as nuclear power plants.
However, this is an active area of researchat the DOE, US Geological Survey (USGS) and various universities.
The NRC is aware of this issue and is stayingabreast of this research.
Since the earthquakes associated with the injection process occur within a few kilometersof the injection wells, the region potentially impacted will be confined to the immediate vicinity of the injection
activities.
(2) Is there any effort to monitor the seismic activity in the area?
Monitoring of earthquake activity in the United States is conducted by the USGS through the Advanced National Seismic System and, in some areas, by other local entities such as universities.
The website http://earthquake.usgs.gov/ contains additional information on earthquake monitoring in the U.S. and an updatedlisting of recent earthquakes located by the USGS.
(3) What is being done to measure the impact of any activity on the plant?
All currently operating nuclear power reactors have some type of seismic instrumentation.
These types ofinstruments are activated (or "triggered") by moderate or strong ground shaking.
Low-amplitudes of ground file:///Cl/
...ments%20and%20Settings/srw1/Desktop/Perry%20Ohio%20Nuclear%20Plant%20Safety%20and%20Hydrolic%20Fracturing.htm
[5/11/2012 4:15:21 PM]shaking, such as that associated with smaller magnitude earthquakes, would not be detected by this type of instrumentation.
These low-amplitude ground shaking levels are not of concern to modern well-engineered facilitiessuch as nuclear power plants.
(4) What safeguards are being put in place to protect the safety and integrity of the plant and whatrestrictions are being put on the drillers?
The NRC is continuing to monitor the safety of all currently operating nuclear power reactors.
This effortincludes a request for reactor licensees to re-evaluate the seismic hazards as part of the NRC required actions following the March 2011 Fukushima, Japan accident. Details on this request can be found on the NRC Automated Document Access Management System (or ADAMS) using the following accession numbers: ML12056A046 /
ML12053A340.
Any significant earthquakes, either natural or triggered, will be considered during this reevaluation.
The activities associated with drilling and hydraulic fracturing are not regulated by the NRC.
The disposal of thewastewater produced as a by-product of the hydro-fracking process is regulated by the U.S. Environmental Protection Agency via Underground Injection Control (UIC) regulations.
These regulations are generallyadministered by the states.
Additional information on earthquakes and nuclear power plants can be found at:
http://www.nrc.gov/reading-rm/doc-collections/fact-sheets/fs-seismic-issues.html
If you have any additional questions regarding this matter, please contact Jon Ake of my staff or me. He may be reached at jon.ake@nrc.gov
.
Best Regards,
Michael Case
- Director, Division of Engineering Office of Nuclear Regulatory Research