ML16333A094
From kanterella
Revision as of 11:39, 17 November 2017 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Letter Sequence Other | |
---|---|
TAC:MF3039, (Approved, Closed) | |
MONTHYEARML13284A0752013-10-0404 October 2013
[Table View]Energy Northwest'S Request for NRC Assistance to Obtain Information from the Us Army Corps of Engineers (Usace) Related to Dam Failure Analysis Project stage: Request ML14080A1392014-03-10010 March 2014 Extension Request Regarding the Flooding Hazard Reevaluation Report Required by NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding Recommendation 2.1, Flooding, of the Near-Term Task Force Review of Insights. Project stage: Request ML14098A1412014-05-21021 May 2014 Relaxation of Response Due Date Regarding Flooding Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of the Insights from the Fukushima Dai-Ichi Accident Project stage: Approval ML14149A1012014-06-0202 June 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Columbia Generating Station Project stage: Request ML14168A0452014-07-0808 July 2014 Summary of 6/10/14 Closed Meeting Between U.S. Army Corps of Engineers, U.S. Dept of Interior Bureau of Reclamation, and Energy Northwest to Discuss Flooding Analysis for Columbia Generating Station Project stage: Meeting ML16337A1092016-12-0707 December 2016 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request; Flood-Causing Mechanism Reevaluation Project stage: Other 2014-05-21 |
ML16333A094 | |
Person / Time | |
---|---|
Site: | Columbia |
Issue date: | 12/07/2016 |
From: | Willingham M NRC/NRO/DSEA/RHMB |
To: | |
Willingham M | |
Shared Package | |
ML16337A111 | List: |
References | |
CAC MF3039 | |
Download: ML16333A094 (5) | |
Similar Documents at Columbia | |
---|---|
Category:Report
MONTHYEARGO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023
[Table view]Licensing Basis Document Update and Biennial Commitment Change Report ML21349B3532021-12-15015 December 2021 Attachment 4: Technical Specification Bases, Revision 124 ML21349B3382021-12-15015 December 2021 10 CFR 50.71 Maintenance of Records Licensing Basis Document Update and Biennial Commitment Change Report ML21349B3522021-12-15015 December 2021 Attachment 4: Licensee Controlled Specifications, Revision 122 GO2-21-041, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462021-03-15015 March 2021 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-20-039, Energy Northwest to EFSEC, Fish Entraiment Characterization Final Report2020-02-26026 February 2020 Energy Northwest to EFSEC, Fish Entraiment Characterization Final Report GO2-19-136, Seismic Probabilistic Risk Assessment Response to NRC Request for Information Pursuant to 10 CFR 50.54(F)Regarding Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-Ichi2019-09-26026 September 2019 Seismic Probabilistic Risk Assessment Response to NRC Request for Information Pursuant to 10 CFR 50.54(F)Regarding Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-Ichi GO2-19-100, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order No. EA-13-109)2019-08-20020 August 2019 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order No. EA-13-109) GO2-19-035, Energy Northwest to Energy Facility Site Evaluation Council, Columbia Generating Station Fish Entrainment Study Interim Report2019-02-0707 February 2019 Energy Northwest to Energy Facility Site Evaluation Council, Columbia Generating Station Fish Entrainment Study Interim Report ML18285A4502018-04-18018 April 2018 1175ENWCGS, Revision 00, Computational Fluid Dynamics Analysis of Perforated Intake Screens at Columbia Generating Station. GO2-17-139, Technical Specifications Section 5.6.4 Post Accident Monitoring Instrumentation Report2017-08-0303 August 2017 Technical Specifications Section 5.6.4 Post Accident Monitoring Instrumentation Report ML17072A0362017-03-10010 March 2017 Endangered Species Act Section 7(a)(2) Biological Opinion, and Magnuson-Stevens Fishery Conservation Act Essential Fish Habitat Response for Renewing the Operating License for Columbia Generating Station, Richland, Washington ML16337A1092016-12-0707 December 2016 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request; Flood-Causing Mechanism Reevaluation ML16333A0942016-12-0707 December 2016 Current Design Basis Flood Hazards for Use in the MSA GO2-16-104, LAR to Change EAL Scheme2016-07-28028 July 2016 LAR to Change EAL Scheme ML16214A3722016-07-28028 July 2016 Summary of Radiological Calibration Turbine Building Ventilation System Exhaust Monitor TEA-RIS-13 GO2-16-024, Technical Specifications Section 5.6.4 Post Accident Monitoring Instrumentation Report2016-01-25025 January 2016 Technical Specifications Section 5.6.4 Post Accident Monitoring Instrumentation Report GO2-16-001, Independent Spent Fuel Storage Installation, (ISFSI) - Transmittal of the Biennial 50.59/72.48 Report2016-01-20020 January 2016 Independent Spent Fuel Storage Installation, (ISFSI) - Transmittal of the Biennial 50.59/72.48 Report ML15355A4862015-12-21021 December 2015 Revision 87 to Licensee Controlled Specifications (LCS) GO2-15-110, Enclosure 2, Revision 2 to 001N6043.5-NP, Energy Northwest Columbia Generating Station Jet Pump 17/18 Riser Evaluation at 106% Rated Core Flow (115 Mlbs/Hr), Non-Proprietary2015-08-31031 August 2015 Enclosure 2, Revision 2 to 001N6043.5-NP, Energy Northwest Columbia Generating Station Jet Pump 17/18 Riser Evaluation at 106% Rated Core Flow (115 Mlbs/Hr), Non-Proprietary ML14335A1582015-03-25025 March 2015 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents) GO2-15-045, Seismic Hazard and Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2015-03-12012 March 2015 Seismic Hazard and Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident GO2-15-039, TIA XXXX-XX, Tower Makeup System Unresolved Issue2015-03-0606 March 2015 TIA XXXX-XX, Tower Makeup System Unresolved Issue ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14064A3112014-03-11011 March 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident ML13337A2662014-01-29029 January 2014 Interim Staff Evaluation and Audit Report Related to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14037A1752014-01-21021 January 2014 Independent Spent Fuel Storage Installation, Biennial Commitment Changes and 50.59/72.48 Report ML13357A3222013-12-21021 December 2013 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Columbia Generating Station, TAC No.: MF0796 GO2-13-151, NEDO-33813, Rev. 2, Technical Specification Change Support for Rhr/Lpci and LPCS Flow Rate. Long-Term LOCA Containment Response and ECCS/Non-LOCA Evaluations.2013-09-30030 September 2013 NEDO-33813, Rev. 2, Technical Specification Change Support for Rhr/Lpci and LPCS Flow Rate. Long-Term LOCA Containment Response and ECCS/Non-LOCA Evaluations. ML13241A2642013-08-12012 August 2013 Enclosure 2 - Columbia Generating Station, Final Seismic Walkdown Summary Report (Public Version) ML13108A2192013-04-0404 April 2013 RWCU Regenerative Heat Exchanger Piping Repair Patch Analysis ML13015A2732012-12-31031 December 2012 NEDO-33698, Rev 2, Columbia Generating Station Power Range Neutron Monitoring System Design Report on Computer Integrity, Test and Calibration, and Fault Detection ML13015A2722012-12-31031 December 2012 NEDO-33685, Rev 2, Digital I&C-ISG-06 Compliance for Columbia Generating Station Numac Power Range Neutron Monitoring Retrofit Plus Option III Stability Trip Function. ML12328A0792012-11-30030 November 2012 NEDO-33789, Revision 0, Numac Power Range Neutron Monitoring Components 268X1331TCG001, 268X1332TCG001, G002 268X1333TCG001, Qualification Summary for Energy Northwest (Enw) Columbia Generating Station (Cgs), Attachment 5 ML12328A0782012-10-31031 October 2012 NEDO-33751, Revision 3, Columbia Generating Station Power Range Neutron Monitoring System Reliability Analysis, Attachment 3 GO2-12-165, Initial Seismic Walkdown Summary Report, Enclosure 22012-10-30030 October 2012 Initial Seismic Walkdown Summary Report, Enclosure 2 GO2-12-105, Submittal of Phase 2 Information in Support of License Amendment Request to Change Technical Specifications in Support of Prnm /Arts/Mellla Implementation; NEDO-33750, NEDO-33753; NEDO-33754: NEDO-33755; & NEDO-337582012-07-31031 July 2012 Submittal of Phase 2 Information in Support of License Amendment Request to Change Technical Specifications in Support of Prnm /Arts/Mellla Implementation; NEDO-33750, NEDO-33753; NEDO-33754: NEDO-33755; & NEDO-33758 ML12102A2382012-06-13013 June 2012 Memo Conclusion of Informal Section 7 Consultation with U.S. Fish and Wildlife Service for Columbia Generating Station and Section 7 Consultation Report ML1216000172012-06-11011 June 2012 Review of 60-Day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near Term Task Force Review of Fukushima Dai-ichi Accident ML12101A3952012-05-0404 May 2012 Conclusion of Efh Consultation for Columbia Generating Station and Efh Consultation Report ML12040A0772012-01-31031 January 2012 NEDO-33697, Revision 1, Columbia Generating Station Power Range Neutron Monitoring System Design Analysis Report ML12040A0742012-01-31031 January 2012 NEDO-33685, Revision 1, Digital I&C-ISG-06 Compliance for Columbia Generating Station Numac Power Range Neutron Monitoring Retrofit Plus Option III Stability Trip Function ML12040A0762012-01-31031 January 2012 NEDO-33694, Revision 1, Columbia Generating Station Power Range Neutron Monitoring System Diversity and Defense-in-Depth (D3) Analysis ML12040A0802012-01-31031 January 2012 NEDO-33507, Revision 1, Columbia Generating Station Aprm/Rbm/Technical Specifications / Maximum Extended Load Line Limit Analysis (Arts/Mellla) ML12040A0792012-01-31031 January 2012 NEDO-33698, Revision 1, Columbia Generating Station Power Range Neutron Monitoring System Design Report on Computer Integrity, Test and Calibration, and Fault Detection. Enclosure 2, Attachment 14 to List of Commitments and Enclosure 3 Are ML12040A0752011-11-30030 November 2011 NEDO-33690, Revision 0, Columbia Generating Station Power Range Neutron Monitoring System Response Time Analysis Report GO2-11-180, Response to Request for Additional Information Regarding the License Renewal Application2011-11-10010 November 2011 Response to Request for Additional Information Regarding the License Renewal Application ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants GO2-11-072, 10 CFR 50.46 Report of Changes or Errors in ECCS LOCA Analysis Models2011-04-0505 April 2011 10 CFR 50.46 Report of Changes or Errors in ECCS LOCA Analysis Models ML1024403422010-08-19019 August 2010 Columbia Generating Station - Response to Request for Additional Information License Renewal Application 2023-12-12 Category:Miscellaneous MONTHYEARGO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023
[Table view]Licensing Basis Document Update and Biennial Commitment Change Report ML21349B3382021-12-15015 December 2021 10 CFR 50.71 Maintenance of Records Licensing Basis Document Update and Biennial Commitment Change Report GO2-21-041, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462021-03-15015 March 2021 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-17-139, Technical Specifications Section 5.6.4 Post Accident Monitoring Instrumentation Report2017-08-0303 August 2017 Technical Specifications Section 5.6.4 Post Accident Monitoring Instrumentation Report ML16337A1092016-12-0707 December 2016 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request; Flood-Causing Mechanism Reevaluation ML16333A0942016-12-0707 December 2016 Current Design Basis Flood Hazards for Use in the MSA ML16214A3722016-07-28028 July 2016 Summary of Radiological Calibration Turbine Building Ventilation System Exhaust Monitor TEA-RIS-13 GO2-16-104, LAR to Change EAL Scheme2016-07-28028 July 2016 LAR to Change EAL Scheme GO2-16-024, Technical Specifications Section 5.6.4 Post Accident Monitoring Instrumentation Report2016-01-25025 January 2016 Technical Specifications Section 5.6.4 Post Accident Monitoring Instrumentation Report GO2-16-001, Independent Spent Fuel Storage Installation, (ISFSI) - Transmittal of the Biennial 50.59/72.48 Report2016-01-20020 January 2016 Independent Spent Fuel Storage Installation, (ISFSI) - Transmittal of the Biennial 50.59/72.48 Report ML14335A1582015-03-25025 March 2015 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents) GO2-15-039, TIA XXXX-XX, Tower Makeup System Unresolved Issue2015-03-0606 March 2015 TIA XXXX-XX, Tower Makeup System Unresolved Issue ML14037A1752014-01-21021 January 2014 Independent Spent Fuel Storage Installation, Biennial Commitment Changes and 50.59/72.48 Report ML13241A2642013-08-12012 August 2013 Enclosure 2 - Columbia Generating Station, Final Seismic Walkdown Summary Report (Public Version) ML1216000172012-06-11011 June 2012 Review of 60-Day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near Term Task Force Review of Fukushima Dai-ichi Accident ML12101A3952012-05-0404 May 2012 Conclusion of Efh Consultation for Columbia Generating Station and Efh Consultation Report GO2-11-180, Response to Request for Additional Information Regarding the License Renewal Application2011-11-10010 November 2011 Response to Request for Additional Information Regarding the License Renewal Application ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants GO2-11-072, 10 CFR 50.46 Report of Changes or Errors in ECCS LOCA Analysis Models2011-04-0505 April 2011 10 CFR 50.46 Report of Changes or Errors in ECCS LOCA Analysis Models ML1024403422010-08-19019 August 2010 Columbia Generating Station - Response to Request for Additional Information License Renewal Application ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants ML1002506582010-01-19019 January 2010 Columbia Generating Station - License Renewal Application, Technical Information, Cover Page - 3.3-400 GO2-09-051, Initial License Written Examination Documentation2009-03-23023 March 2009 Initial License Written Examination Documentation ML0832306632008-11-18018 November 2008 Draft of BWROG ECCS Strainers Walkdown Guidance, Rev. C GO2-06-081, Request for Use of Higher Assigned Protection Factors with Use of French-Designed Air-Line Respirator Equipment2006-05-22022 May 2006 Request for Use of Higher Assigned Protection Factors with Use of French-Designed Air-Line Respirator Equipment GO2-05-108, CFR 50.46 Report of Significant Changes in Cycle 17 and 18 Emergency Core Cooling System Evaluation Analysis2005-06-16016 June 2005 CFR 50.46 Report of Significant Changes in Cycle 17 and 18 Emergency Core Cooling System Evaluation Analysis ML0532204612004-06-14014 June 2004 Power Reactor Status Report for 6/14/04 ML0626304082004-03-0101 March 2004 PSEG Nuclear, LLC Salem/Hope Creek Safety Culture Assessment 2023-12-12 |
Retrieved from "https://kanterella.com/w/index.php?title=ML16333A094&oldid=174576"